高心墻堆石壩壩基廊道受力特性研究
[Abstract]:In the western part of China, where water resources are most abundant, the riverbed cover is tens of meters or even 100 meters thick, and a large number of earth and rock dams are being and will be built on these great rivers. The dam body core wall and the dam foundation impervious wall are usually connected by the structural type of corridor. The stress condition of the corridor is complex, which is the key to the success or failure of the project. However, some of the projects that have already been built have the phenomenon of water leakage in the corridor. Corridor cracking and structural joint failure are urgent problems to be solved. In order to have a clear understanding of the stress and cracking law of the corridor, the monitoring data of several engineering corridors are analyzed and summarized. At the same time, based on the nonlinear constitutive theory of concrete, a finite element model is established to simulate the corridor. After comparing and analyzing the monitoring results and the numerical calculation results, the structural joints in the corridor and the stress law of the whole corridor are discussed, and the crack prone parts in the corridor are pointed out, which provide guidance for the rational reinforcement of the corridor. At the same time, it provides a reference for the decision of similar projects.
【作者單位】: 武漢大學(xué)水資源與水電工程科學(xué)國家重點(diǎn)實(shí)驗(yàn)室;
【分類號(hào)】:TV31;TV641.41
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 馮蕊;何蘊(yùn)龍;;深厚覆蓋層上高礫石土心墻堆石壩變形監(jiān)測(cè)分析[J];巖土力學(xué);2015年S2期
2 馮蕊;伍小玉;何蘊(yùn)龍;曹學(xué)興;劉俊林;熊X;岑威鈞;;深厚覆蓋層上超高心墻堆石壩壩基廊道非線性開裂分析[J];四川大學(xué)學(xué)報(bào)(工程科學(xué)版);2015年01期
3 王曉安;呂海東;王平;何蘭;;深厚覆蓋層心墻堆石壩壩基河床廊道結(jié)構(gòu)縫設(shè)計(jì)[J];水資源與水工程學(xué)報(bào);2013年01期
4 鄭培溪;趙靜;崔會(huì)東;解小焦;;磽磧大壩壩基廊道結(jié)構(gòu)縫滲漏原因分析及處理效果[J];水電自動(dòng)化與大壩監(jiān)測(cè);2012年02期
5 張宏軍;;新疆某碾壓式瀝青混凝土心墻壩設(shè)計(jì)[J];人民黃河;2012年03期
6 尤士介;袁長海;王林;高武林;;瀑布溝水電站壩基廊道結(jié)構(gòu)縫滲水處理[J];人民長江;2011年24期
7 熊X;何蘊(yùn)龍;伍小玉;董園林;;長河壩壩基廊道應(yīng)力變形特性研究[J];巖土工程學(xué)報(bào);2011年11期
8 呂洪旭;陳科文;鄧建輝;鄭俊;;瀑布溝大壩防滲墻應(yīng)力分布特性及機(jī)理探討[J];人民長江;2011年10期
9 萬彪;何蘊(yùn)龍;熊X;;有厚度節(jié)理單元的開發(fā)與應(yīng)用[J];水電能源科學(xué);2008年04期
10 孔俐麗;劉小生;趙劍明;劉啟旺;;高土石壩建設(shè)的若干應(yīng)用基礎(chǔ)研究問題[J];中國水利水電科學(xué)研究院學(xué)報(bào);2006年04期
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張運(yùn)達(dá);王能峰;馬金根;;某水電站大壩基礎(chǔ)廊道變形滲水分析[J];地質(zhì)災(zāi)害與環(huán)境保護(hù);2016年04期
2 馮蕊;何蘊(yùn)龍;白新革;;高心墻堆石壩壩基廊道受力特性研究[J];巖土工程學(xué)報(bào);2017年07期
3 萬宇豪;何蘊(yùn)龍;;黃金坪壩基防滲墻地震反應(yīng)規(guī)律[J];武漢大學(xué)學(xué)報(bào)(工學(xué)版);2016年03期
4 江時(shí)俊;楊具瑞;湯敏;王強(qiáng);李談?wù)?;瀝青混凝土心墻與過渡層變形協(xié)調(diào)性及防滲的影響研究[J];水力發(fā)電學(xué)報(bào);2016年04期
5 龔靜;胡建忠;伍小玉;;高土石壩壩基廊道實(shí)測(cè)鋼筋應(yīng)力監(jiān)測(cè)成果分析[J];四川水力發(fā)電;2016年02期
6 李斌;劉娟;;高土石壩深厚覆蓋層壩基防滲墻布置型式研究[J];巖土工程學(xué)報(bào);2016年S1期
7 陸彥強(qiáng);;寒冷地區(qū)碾壓式瀝青混凝土心墻壩設(shè)計(jì)[J];中國水運(yùn)(下半月);2016年03期
8 伍小玉;萬宇豪;何蘊(yùn)龍;;黃金坪水電站壩基廊道應(yīng)力變形特性分析[J];水力發(fā)電;2016年03期
9 張丹;;長河壩水電站壩基防滲墻與土心墻連接研究[J];四川水力發(fā)電;2016年01期
10 馮蕊;何蘊(yùn)龍;;超深覆蓋層上瀝青混凝土心墻堆石壩防滲系統(tǒng)抗震安全性[J];武漢大學(xué)學(xué)報(bào)(工學(xué)版);2016年01期
【二級(jí)參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 丁艷輝;袁會(huì)娜;張丙印;;堆石料非飽和濕化變形特性試驗(yàn)研究[J];工程力學(xué);2013年09期
2 王曉安;呂海東;王平;何蘭;;深厚覆蓋層心墻堆石壩壩基河床廊道結(jié)構(gòu)縫設(shè)計(jì)[J];水資源與水工程學(xué)報(bào);2013年01期
3 鄭培溪;趙靜;崔會(huì)東;解小焦;;磽磧大壩壩基廊道結(jié)構(gòu)縫滲漏原因分析及處理效果[J];水電自動(dòng)化與大壩監(jiān)測(cè);2012年02期
4 尤士介;袁長海;王林;高武林;;瀑布溝水電站壩基廊道結(jié)構(gòu)縫滲水處理[J];人民長江;2011年24期
5 熊X;何蘊(yùn)龍;伍小玉;董園林;;長河壩壩基廊道應(yīng)力變形特性研究[J];巖土工程學(xué)報(bào);2011年11期
6 索慧敏;姜媛媛;金偉;王黨在;;瀘定水電站壩基灌漿廊道設(shè)計(jì)[J];水力發(fā)電;2011年05期
7 熊X;何蘊(yùn)龍;曹學(xué)興;;觀音巖水電站混合壩插入式接頭的抗震性能[J];天津大學(xué)學(xué)報(bào);2010年07期
8 姚福海;;深厚覆蓋層上土石壩基礎(chǔ)廊道的結(jié)構(gòu)形式探討[J];水力發(fā)電;2010年06期
9 程展林;左永振;丁紅順;姜景山;孔憲勇;;堆石料濕化特性試驗(yàn)研究[J];巖土工程學(xué)報(bào);2010年02期
10 岑威鈞;Erich Bauer;Sendy F. Tantono;;考慮濕化效應(yīng)的堆石料Gudehus-Bauer亞塑性模型應(yīng)用研究[J];巖土力學(xué);2009年12期
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李宏棟;談?wù)勅绾螠p少房屋結(jié)構(gòu)縫[J];低溫建筑技術(shù);2003年02期
2 施其銀;減少房屋結(jié)構(gòu)縫的辦法[J];安徽建筑;2000年02期
3 樊永盛;結(jié)構(gòu)縫設(shè)置的一些方法[J];山西建筑;2004年05期
4 王冰;;水工建筑物結(jié)構(gòu)縫處理新方法的探討[J];科技創(chuàng)新與應(yīng)用;2013年12期
5 尹建江,王宗昌;控制建筑結(jié)構(gòu)縫的設(shè)置和施工質(zhì)量[J];工程建設(shè)與設(shè)計(jì);2005年05期
6 張芳,阿里木江;建筑結(jié)構(gòu)縫的設(shè)置要求及施工質(zhì)量控制[J];山西建筑;2005年01期
7 蔡欣然;;建筑結(jié)構(gòu)縫的設(shè)置及實(shí)例[J];山西建筑;2010年21期
8 黃會(huì)寶;沈定斌;羅正英;江華貴;;銅街子水電站大壩廊道結(jié)構(gòu)縫漏水分析與治理[J];大壩與安全;2012年04期
9 谷曉昆;;基于創(chuàng)新角度下的水利工程中建筑物結(jié)構(gòu)縫處理新方式研究[J];科技創(chuàng)新與應(yīng)用;2013年04期
10 陳良;;建筑結(jié)構(gòu)縫的設(shè)置要求及施工質(zhì)量控制[J];門窗;2014年03期
相關(guān)會(huì)議論文 前2條
1 姜命強(qiáng);何培章;;三峽水利樞紐左岸電站廠房結(jié)構(gòu)縫滲漏處理施工[A];2004水利水電地基與基礎(chǔ)工程技術(shù)[C];2004年
2 姜命強(qiáng);何培章;;三峽水利樞紐左岸電站廠房結(jié)構(gòu)縫滲漏處理施工[A];2004水利水電地基與基礎(chǔ)工程技術(shù)——中國水利學(xué)會(huì)地基與基礎(chǔ)工程專業(yè)委員會(huì)2004年學(xué)術(shù)會(huì)議論文集[C];2004年
,本文編號(hào):2213485
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2213485.html