某特高壓輸電線路工程防洪評(píng)價(jià)問題研究
[Abstract]:UHV transmission line project is an important project in the 12th Five-Year Plan and 13th Five-Year Plan of National Energy Development, which is of great strategic significance to the development of national economy and the improvement of people's livelihood and environment. UHV transmission line project has long route and many river systems, which will affect flood control management of regional river system. According to the relevant regulations of water law, flood control law and water conservancy department, it is necessary to evaluate the effects of flood control, evaluate the interaction between construction projects, flood storage and detention areas and rivers, and put forward remedial measures. The UHV transmission line project studied in this paper is located in Cangzhou area, Hebei Province. The total length of the line section is 118.9 km, which spans the flood storage and detention areas and river channels such as Jiakouwa, South Canal, Ziya New River, Beipai River, Jaidi River, Nanpai River, Xuanhui River, etc. It is necessary to study flood impact assessment and river channel flood control evaluation in flood storage and detention area, evaluate the relationship between the project and flood storage and detention area and river channel, and put forward remedial measures. This paper first introduces the origin and research methods of flood control evaluation research; secondly, the contents and methods of flood control evaluation research are introduced in detail according to the characteristics of this research project; then, the present conditions of the project are discussed. Then, according to the administrative division flood storage area flood impact assessment, river flood control evaluation of the two parts of the study project flood impact assessment demonstration, finally, The paper puts forward the research results, demonstrates the relationship between the research project and the flood storage and detention area, the river channel and the remedial measures needed, and points out the shortcomings of the research in this paper.
【學(xué)位授予單位】:石家莊鐵道大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TM75;TV87
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 潘曉春;巫黎明;許軼;;高壓、超高壓和特高壓輸變電工程防洪標(biāo)準(zhǔn)芻議[J];電力勘測(cè)設(shè)計(jì);2014年06期
2 馮亞輝;李書友;;二維數(shù)學(xué)模型在漕河大橋防洪評(píng)價(jià)中的應(yīng)用[J];水科學(xué)與工程技術(shù);2013年04期
3 葉新霞;程建華;;河道管理范圍內(nèi)建設(shè)項(xiàng)目防洪評(píng)價(jià)工作的幾點(diǎn)體會(huì)[J];水利科技與經(jīng)濟(jì);2012年03期
4 李傳龍;楊紀(jì)偉;耿更;;白溝引河大橋防洪評(píng)價(jià)分析[J];水科學(xué)與工程技術(shù);2011年05期
5 史秀光;李冬梅;姜淑坤;;防洪評(píng)價(jià)報(bào)告編寫淺析[J];東北水利水電;2008年12期
6 劉濤;楊文海;于清霖;;保阜高速引線跨越沙河大橋防洪影響評(píng)價(jià)[J];水科學(xué)與工程技術(shù);2008年03期
7 李廣闊;任玲;;河道管理范圍內(nèi)建設(shè)項(xiàng)目防洪評(píng)價(jià)審查要點(diǎn)分析[J];人民珠江;2007年06期
8 李紅清;遙感技術(shù)在水環(huán)境保護(hù)中的應(yīng)用初探[J];水利水電快報(bào);2003年03期
9 李大鳴,陳虹,李世森;河道洪水演進(jìn)的二維水流數(shù)學(xué)模型[J];天津大學(xué)學(xué)報(bào);1998年04期
,本文編號(hào):2198843
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2198843.html