歐洲某潮汐電站蓄水砂芯防波堤壩斷面優(yōu)化設(shè)計研究
發(fā)布時間:2018-03-27 19:01
本文選題:潮汐電站 切入點:防波堤壩 出處:《海洋工程》2017年05期
【摘要】:為了對歐洲某潮汐電站蓄水砂芯防波堤壩斷面進行設(shè)計優(yōu)化,從工程環(huán)境、設(shè)計要求、斷面結(jié)構(gòu)選擇、結(jié)構(gòu)穩(wěn)定性優(yōu)化、施工和工程造價等方面進行對比分析研究。結(jié)果顯示,高潮差、長周期波條件下石頭圍埝方案的砂芯防波堤壩斷面滿足該項目優(yōu)化設(shè)計要求,該結(jié)構(gòu)斷面為類似工程項目提供借鑒和參考。
[Abstract]:In order to design and optimize the section of a tidal power station impoundment sand core breakwater dam in Europe, this paper makes a comparative study on the engineering environment, design requirements, section structure selection, structural stability optimization, construction cost and engineering cost. Under the condition of high tide and long period wave, the section of the sand core breakwater dam under the condition of long period wave can meet the requirements of the optimum design of the project, and the section of the structure can be used for reference and reference for similar projects.
【作者單位】: 中交第四航務(wù)工程勘察設(shè)計院有限公司;
【分類號】:TV744
【相似文獻】
相關(guān)期刊論文 前10條
1 馬元s,
本文編號:1672816
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1672816.html
最近更新
教材專著