小近距并行盾構(gòu)隧道的掘進(jìn)相互影響分析
[Abstract]:With the rapid development of urban underground traffic construction, the construction of two or more shield tunnels in close proximity has gradually appeared. The interaction between the tunnels under construction and the existing tunnels has become an important issue in the construction. In recent years, more and more parallel double-line shield tunnels have been used in China, but this aspect of the theory is very important. However, the research lags behind the engineering practice, and there is no specific standard. Therefore, the research on the interaction of small-close-range parallel shield tunnels has important theoretical significance and engineering application value.
1. Firstly, the soil elastic displacement field is obtained by numerical integration of the additional load on the front face and the frictional force on the side wall of Shield Tunneling Based on Mindlin solution. Secondly, the soil elastic displacement caused by the loss of the shield tail soil is solved based on Loganathan formula. The total free displacement field of the soil is applied to the existing tunnel, and the differential equation of the load-deformation balance of the existing tunnel is established based on the Pasternak foundation model. Finally, the internal force and displacement of the existing tunnel due to shield construction can be obtained.
2. Based on the large-scale finite element software ABAQUS, the three-dimensional numerical analysis of the small-distance shield tunneling section of Hangzhou Huancheng North Road underground passage is carried out. The excavation process is simulated by step excavation, shield tail grouting and excavation surface support. Firstly, the displacement field, segment internal force and deformation of the soil are obtained by numerical simulation. In order to study the influence of the construction process of the tunnel on the existing tunnel, the influence of the construction process of the northern shield on the surrounding soil displacement and the southern tunnel is studied.
3. Based on the engineering example of small-distance shield tunneling section of Huancheng North Road underground passage, the interaction between the tunnel under construction and the existing tunnel is systematically analyzed and calculated by means of theoretical formula, numerical simulation and construction monitoring. The analysis conclusion can provide reference for similar projects in the future.
【學(xué)位授予單位】:浙江大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U455.43
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 顏建平,楊林德,朱合華,白云;盾構(gòu)法運(yùn)輸系統(tǒng)的優(yōu)化[J];中國(guó)市政工程;2003年06期
2 宋克志,王夢(mèng)恕;盾構(gòu)的選型及國(guó)產(chǎn)化問題[J];煙臺(tái)師范學(xué)院學(xué)報(bào)(自然科學(xué)版);2004年01期
3 劉仁鵬;盾構(gòu)選型[J];建筑機(jī)械;2004年09期
4 楊曉強(qiáng) ,薛瑞麟;盾構(gòu)機(jī)掘進(jìn)中幾個(gè)值得關(guān)注的問題[J];工程機(jī)械與維修;2005年13期
5 李惠平;安懷文;夏明耀;;盾構(gòu)運(yùn)動(dòng)特性分析[J];地下空間與工程學(xué)報(bào);2006年01期
6 張潤(rùn)利;賀杰;;工程機(jī)械專利信息之盾構(gòu)機(jī)篇[J];工程機(jī)械文摘;2006年02期
7 羅偉雄;;盾構(gòu)過江施工的設(shè)備保障[J];隧道建設(shè);2006年04期
8 薄志義;王坡;張楠;;盾構(gòu)機(jī)軸線方位角解算原理研究[J];北京測(cè)繪;2006年03期
9 宋書顯;;盾構(gòu)大體積管片裂紋分析[J];隧道建設(shè);2006年05期
10 張磊;;淺談盾構(gòu)法施工的安全管理[J];隧道建設(shè);2006年S2期
相關(guān)會(huì)議論文 前10條
1 孫海霞;趙文;王釗宇;于建軍;;地鐵盾構(gòu)法施工對(duì)地表變形的影響分析[A];第九屆海峽兩岸隧道與地下工程學(xué)術(shù)及技術(shù)研討會(huì)論文集[C];2010年
2 陳饋;孫謀;;重慶過江隧洞盾構(gòu)法施工泥水處理技術(shù)[A];中國(guó)土木工程學(xué)會(huì)第十一屆、隧道及地下工程分會(huì)第十三屆年會(huì)論文集[C];2004年
3 洪開榮;;我國(guó)盾構(gòu)隧道發(fā)展中的幾個(gè)問題[A];科技、工程與經(jīng)濟(jì)社會(huì)協(xié)調(diào)發(fā)展——河南省第四屆青年學(xué)術(shù)年會(huì)論文集(下冊(cè))[C];2004年
4 洪開榮;;我國(guó)盾構(gòu)隧道發(fā)展中的幾個(gè)問題[A];城市地下空間開發(fā)與地下工程施工技術(shù)高層論壇論文集[C];2004年
5 卿偉宸;廖紅建;錢春宇;;盾構(gòu)法施工影響地面最大沉降的若干因素分析[A];中國(guó)土木工程學(xué)會(huì)第十二屆年會(huì)暨隧道及地下工程分會(huì)第十四屆年會(huì)論文集[C];2006年
6 橋本正;管茜檬;朱合華;馬險(xiǎn)峰;;大口徑長(zhǎng)距離盾構(gòu)機(jī)風(fēng)險(xiǎn)評(píng)估事例[A];同濟(jì)大學(xué)校慶論壇——“工程風(fēng)險(xiǎn)管理與保險(xiǎn)論壇”暨“中國(guó)土木工程學(xué)會(huì)院士論壇”資料匯編[C];2007年
7 沈建奇;金先龍;丁峻宏;李根國(guó);王吉云;;盾構(gòu)法施工三維并行數(shù)值模擬方法研究[A];首屆工程設(shè)計(jì)高性能計(jì)算(HPC)技術(shù)應(yīng)用論壇論文集[C];2007年
8 王暖堂;;城市地鐵盾構(gòu)法施工中的測(cè)量技術(shù)[A];第四屆中國(guó)巖石錨固與注漿學(xué)術(shù)會(huì)議論文集[C];2007年
9 孔思麗;王建國(guó);T.Nogami;;都市高密集建筑環(huán)境中雙隧道盾構(gòu)法施工引起的地面沉降分析[A];中國(guó)土木工程學(xué)會(huì)第九屆土力學(xué)及巖土工程學(xué)術(shù)會(huì)議論文集(下冊(cè))[C];2003年
10 董偉東;;盾構(gòu)機(jī)激光導(dǎo)向系統(tǒng)原理研究[A];中國(guó)測(cè)繪學(xué)會(huì)第八次全國(guó)會(huì)員代表大會(huì)暨2005年綜合性學(xué)術(shù)年會(huì)論文集[C];2005年
相關(guān)重要報(bào)紙文章 前10條
1 本報(bào)記者 喬地 通訊員 申陽;開辟盾構(gòu)數(shù)字化智能化新征程[N];科技日?qǐng)?bào);2014年
2 肖華;盾構(gòu)“神器”助力新興市場(chǎng)[N];中華建筑報(bào);2014年
3 本報(bào)記者 陳克然;盾構(gòu)市場(chǎng)“發(fā)燒” 科學(xué)施工不容忽視[N];中國(guó)建設(shè)報(bào);2009年
4 本報(bào)記者 尤云;盾構(gòu)企業(yè)追逐“英雄”時(shí)代[N];中華建筑報(bào);2003年
5 本報(bào)記者 趙洪亮;盾構(gòu)施工如何“創(chuàng)新 安全 突破”[N];中國(guó)水利報(bào);2009年
6 本報(bào)記者 付毅飛;國(guó)產(chǎn)盾構(gòu)加速地鐵建設(shè)[N];科技日?qǐng)?bào);2005年
7 本報(bào)記者 王小潤(rùn);黃昌富:勇往直前的“盾構(gòu)機(jī)”[N];光明日?qǐng)?bào);2011年
8 成海忠;鐘儒華;走在地鐵施工前沿[N];中國(guó)鐵道建筑報(bào);2003年
9 本報(bào)記者 湯璇;領(lǐng)先國(guó)內(nèi)的盾構(gòu)“地中對(duì)接 洞內(nèi)解體”法[N];廣東建設(shè)報(bào);2006年
10 特約記者 謝建蒲 通訊員 楊延安;盾構(gòu)直指長(zhǎng)江北岸[N];中國(guó)交通報(bào);2004年
相關(guān)博士學(xué)位論文 前10條
1 胡國(guó)良;盾構(gòu)模擬試驗(yàn)平臺(tái)電液控制系統(tǒng)關(guān)鍵技術(shù)研究[D];浙江大學(xué);2006年
2 馬可栓;盾構(gòu)施工引起地基移動(dòng)與近鄰建筑保護(hù)研究[D];華中科技大學(xué);2008年
3 賈勇;盾構(gòu)施工地層變形實(shí)測(cè)與三維數(shù)值模擬及參數(shù)分析[D];天津大學(xué);2010年
4 徐前衛(wèi);盾構(gòu)施工參數(shù)的地層適應(yīng)性模型試驗(yàn)及其理論研究[D];同濟(jì)大學(xué);2006年
5 陳慧;基于無衍射光的盾構(gòu)位姿測(cè)量系統(tǒng)的理論與技術(shù)研究[D];華中科技大學(xué);2011年
6 胡祥濤;土—盾構(gòu)相互作用研究及推進(jìn)載荷規(guī)劃[D];華中科技大學(xué);2012年
7 雷明鋒;侵蝕環(huán)境下盾構(gòu)隧道結(jié)構(gòu)性能全壽命計(jì)算方法研究[D];中南大學(xué);2013年
8 葉飛;軟土盾構(gòu)隧道施工期上浮機(jī)理分析及控制研究[D];同濟(jì)大學(xué);2007年
9 嚴(yán)長(zhǎng)征;盾構(gòu)隧道近距離共同作用機(jī)理及施工技術(shù)研究[D];同濟(jì)大學(xué);2007年
10 張海波;地鐵隧道盾構(gòu)法施工對(duì)周圍環(huán)境影響的數(shù)值模擬[D];河海大學(xué);2005年
相關(guān)碩士學(xué)位論文 前10條
1 王淵;盾構(gòu)施工引起的地面沉降及周邊建筑物保護(hù)[D];華中科技大學(xué);2008年
2 張恒;下穿立交橋盾構(gòu)隧道掘進(jìn)控制技術(shù)研究[D];西南交通大學(xué);2009年
3 肖文輝;基于透明土的盾構(gòu)隧道模型試驗(yàn)初步研究[D];武漢理工大學(xué);2011年
4 吳盛才;盾構(gòu)法施工地表高速公路安全監(jiān)測(cè)及穩(wěn)定性評(píng)價(jià)[D];長(zhǎng)沙理工大學(xué);2012年
5 袁杰;盾構(gòu)施工引起地表和土層形變的有限元分析與試驗(yàn)研究[D];天津大學(xué);2008年
6 徐冬健;盾構(gòu)隧道沉降數(shù)值模擬[D];北京交通大學(xué);2009年
7 段苒;盾構(gòu)施工穿越古城墻安全性研究[D];北京交通大學(xué);2008年
8 趙書銀;大坡度小半徑重疊盾構(gòu)隧道修建技術(shù)研究[D];上海交通大學(xué);2010年
9 殷加順;盾構(gòu)施工注漿對(duì)地層變形影響的有限元模擬及試驗(yàn)研究[D];天津大學(xué);2009年
10 李林;盾構(gòu)施工地層形變及穿越樁群三維數(shù)值模擬試驗(yàn)研究[D];天津大學(xué);2009年
,本文編號(hào):2226884
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/2226884.html