多項(xiàng)目管理環(huán)境下的業(yè)主方施工管理過(guò)程績(jī)效評(píng)價(jià)指標(biāo)體系
[Abstract]:The owner's project management plays a decisive role in the success of the project. In a multi-project management environment, enterprise management needs to evaluate the performance of each construction project management process. The traditional post-evaluation can not control the completed project itself, but the research on the performance of the project management process can overcome the shortcomings of post-evaluation. In this paper, under the environment of multi-project management, the performance of owner's construction management process is considered as the research topic, which is divided into two sub-problems: how to define the performance of owner's construction management process; How to establish the performance evaluation index system of owner-side construction management process. Through the analysis and study of the related concepts by the method of literature investigation, the paper defines the concept of the performance of the owner's construction management process as: the owner's project management department organizes, coordinates and controls the project during the construction stage of the project, and through the specialty, The systematic evaluation index system objectively reflects the efficiency of the organization's management behavior and the degree of realization of the process result in the process of project management. On this basis, combined with the impact of the multi-project management environment on the performance of the project management process, the initial set of performance evaluation indicators of the owner's construction management process is established, and the performance evaluation indicators are screened by the Delphi method and the hierarchical analysis screening index method. Finally, the performance evaluation index system of owner's construction management process is established, which includes 27 evaluation indexes, including target control, resource allocation, coordination and communication, and information management. Objective control includes cost control (three evaluation indicators), quality control (four evaluation indicators), schedule control (four evaluation indicators) and other control objectives (four evaluation indicators), resource allocation includes five evaluation indicators. Coordination and communication include three evaluation indicators and information management includes four evaluation indicators. The fuzzy comprehensive evaluation model based on AHP is established, and the feasibility of the evaluation index system is verified by case study. The performance evaluation index system of the management process established in this paper can provide effective project performance management tools for the owner during the construction phase. The method of setting up the index system can provide reference for other construction stage or other project participants to establish the performance evaluation index system of project management process.
【學(xué)位授予單位】:昆明理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:F272.5;TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前6條
1 王業(yè)球;周曉宏;凌利;;工程項(xiàng)目績(jī)效評(píng)價(jià)研究綜述[J];標(biāo)準(zhǔn)科學(xué);2011年05期
2 郭慶軍;賽云秀;;關(guān)鍵鏈多項(xiàng)目進(jìn)度管理分析[J];西安工業(yè)大學(xué)學(xué)報(bào);2007年06期
3 唐任仲,O.Mejabi;過(guò)程管理技術(shù)[J];浙江大學(xué)學(xué)報(bào)(工學(xué)版);2002年03期
4 陳建華,林鳴,馬士華;基于過(guò)程管理的工程項(xiàng)目多目標(biāo)綜合動(dòng)態(tài)調(diào)控機(jī)理模型[J];中國(guó)管理科學(xué);2005年05期
5 湯洪濤,唐任仲,夏悅琴;業(yè)務(wù)過(guò)程績(jī)效指標(biāo)識(shí)別與分析[J];中國(guó)機(jī)械工程;2003年23期
6 葉勇,胡紹剛,王德財(cái);高速公路工程項(xiàng)目管理績(jī)效評(píng)價(jià)研究[J];公路與汽運(yùn);2005年01期
相關(guān)博士學(xué)位論文 前2條
1 祁神軍;建設(shè)企業(yè)集團(tuán)多項(xiàng)目資源優(yōu)化配置研究[D];華中科技大學(xué);2009年
2 高喜珍;公共項(xiàng)目績(jī)效評(píng)價(jià)體系及績(jī)效實(shí)現(xiàn)機(jī)制研究[D];天津大學(xué);2009年
,本文編號(hào):2411531
本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/2411531.html