深基坑噴錨支護(hù)體系的優(yōu)化設(shè)計(jì)及穩(wěn)定性分析

發(fā)布時(shí)間:2018-03-24 21:28

  本文選題:噴錨支護(hù) 切入點(diǎn):數(shù)值模擬 出處:《中國(guó)石油大學(xué)(華東)》2014年碩士論文


【摘要】:噴錨網(wǎng)支護(hù)是近年來(lái)應(yīng)用于深基坑邊坡支護(hù)中的一種新技術(shù)。該技術(shù)是在土內(nèi)打入一定數(shù)量的錨桿,使其與土體共同作用,增加強(qiáng)度和土體的整體性能。該方法穩(wěn)定可靠,具有造價(jià)低、工期短、使用范圍廣等特點(diǎn)。因此,開(kāi)展對(duì)深基坑噴錨支護(hù)技術(shù)設(shè)計(jì)和穩(wěn)定性的研究是十分有必要的。本文主要是基于校內(nèi)工科實(shí)驗(yàn)樓E座基坑支護(hù)工程,利用FLAC3D有限差分軟件分析了工程中噴錨支護(hù)各結(jié)構(gòu)參數(shù)對(duì)基坑穩(wěn)定性的影響另外,本文還分別研究了含水量變化及罐車(chē)和泵車(chē)工作時(shí)產(chǎn)生的振動(dòng)載荷對(duì)基坑變形的影響。主要內(nèi)容如下:1)根據(jù)實(shí)際工況的相關(guān)參數(shù),運(yùn)用FLAC 3D有限差分軟件分析了基坑分層開(kāi)挖過(guò)程中的土體變形,結(jié)果表明水平位移隨開(kāi)挖次數(shù)逐漸增加,但增加率卻在不斷減小。且在開(kāi)挖過(guò)程中,由于噴錨支護(hù)結(jié)構(gòu)的錨固作用,基坑土體的位移變形得到了有效控制。2)利用FLAC 3D有限差分軟件分析了錨桿長(zhǎng)度、豎向間距和傾角對(duì)基坑變形的影響,分析結(jié)果表明:當(dāng)錨桿的長(zhǎng)度增加,特別是錨固段長(zhǎng)度增加時(shí),基坑壁的水平位移和地表沉降呈現(xiàn)一個(gè)減小的趨勢(shì)。錨桿豎向間距的減小,錨桿傾斜角度的增大,都能限制基坑土體的位移,提高錨桿的加固能力,使土體的整體性得到提高。3)通過(guò)模擬分析施工過(guò)程中含水量的變化,得出了含水量變化與基坑變形之間的關(guān)系曲線,結(jié)果表明,同一深度位置處,土體的位移變形隨著含水量的增加而變大;同一含水量處,隨著開(kāi)挖深度的增加,土體的位移變形也越大。4)通過(guò)對(duì)模型施加不同計(jì)算周期的振動(dòng)荷載,及對(duì)不同計(jì)算周期內(nèi)的基坑位移變化情況的分析,基坑位移隨計(jì)算周期的增加而增加,并且在基坑靠近邊緣荷載處的變形最大,中間基本無(wú)變化;在邊緣處,基坑位移在前10個(gè)計(jì)算周期內(nèi)變化比較明顯,后10個(gè)計(jì)算周期位移也有增加,但增加速率開(kāi)始減小,使得基坑變形在后期趨于平穩(wěn)。
[Abstract]:Shotcrete-anchor mesh support is a new technique used in slope support of deep foundation pit in recent years. This technique is to push a certain number of anchor rods into the soil, make it interact with soil, increase the strength and the overall performance of soil, and this method is stable and reliable. Therefore, it is necessary to study the technical design and stability of shotcrete anchor support for deep foundation pit. The influence of structural parameters of shotcrete anchor support on the stability of foundation pit is analyzed by FLAC3D finite difference software. The influence of the variation of water content and the vibration load of tank car and pump car on the deformation of foundation pit is also studied in this paper. The main contents are as follows: 1) according to the relevant parameters of actual working condition, FLAC 3D finite difference software is used to analyze the deformation of soil in the course of delamination excavation of foundation pit. The results show that the horizontal displacement increases gradually with the times of excavation, but the increasing rate is decreasing. Because of the anchoring effect of shotcrete anchor support structure, the displacement and deformation of foundation pit soil are effectively controlled. 2) the influence of bolt length, vertical spacing and inclination angle on foundation pit deformation is analyzed by using FLAC 3D finite difference software. The results show that when the length of anchor rod increases, especially the length of anchoring section increases, the horizontal displacement and ground subsidence of foundation pit wall show a decreasing trend. Can limit the displacement of foundation pit soil, improve the reinforcement ability of anchor rod, and improve the integrity of soil. 3) by simulating and analyzing the change of water content during construction, the relationship curve between the change of water content and deformation of foundation pit is obtained. The results show that the displacement deformation of soil increases with the increase of water content at the same depth, and increases with the increase of excavation depth at the same water content. The larger the displacement deformation of soil is, the more the displacement of foundation pit increases with the increase of calculation period by applying the vibration load of different calculation periods to the model and analyzing the variation of foundation pit displacement in different calculation periods. And the deformation near the edge of the foundation pit is the largest and the middle is basically unchanged. At the edge, the displacement of the foundation pit changes obviously in the first 10 calculation cycles, and the displacement of the last 10 periods also increases, but the increasing rate begins to decrease. The deformation of foundation pit tends to be stable in the later stage.
【學(xué)位授予單位】:中國(guó)石油大學(xué)(華東)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU473.2

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 姚佐周;;積極推廣和提高噴錨支護(hù)技術(shù)[J];鐵道標(biāo)準(zhǔn)設(shè)計(jì)通訊;1980年02期

2 劉啟琛;對(duì)目前在鐵路隧道新建工程中采用噴錨支護(hù)的幾點(diǎn)看法和意見(jiàn)[J];鐵道建筑;1981年07期

3 蔣壽山;;有限元法在噴錨支護(hù)計(jì)算中的應(yīng)用[J];重慶建筑工程學(xué)院學(xué)報(bào);1983年03期

4 劉吉福,謝曉華,郭宗文;超前樁在噴錨支護(hù)工程中的應(yīng)用[J];巖土工程技術(shù);2000年02期

5 唐瑞卿;噴錨支護(hù)技術(shù)在軟土地基中的應(yīng)用[J];浙江建筑;2004年04期

6 邢六金;;噴錨支護(hù)技術(shù)在工程中的應(yīng)用[J];山西建筑;2009年08期

7 王效義;;噴錨支護(hù)技術(shù)在華峰大廈工程中的應(yīng)用[J];甘肅科技縱橫;2009年02期

8 鐘太權(quán);;巖土治理噴錨支護(hù)技術(shù)的運(yùn)用[J];工程建設(shè)與設(shè)計(jì);2010年03期

9 乃國(guó)甜;;淺談噴錨支護(hù)在地下建筑工程中的應(yīng)用與實(shí)踐[J];吉林廣播電視大學(xué)學(xué)報(bào);2010年04期

10 王雙有;;淺析噴錨支護(hù)施工的監(jiān)理[J];價(jià)值工程;2010年16期

相關(guān)會(huì)議論文 前10條

1 程良奎;;噴錨支護(hù)的工作特性與作用原理[A];地下工程經(jīng)驗(yàn)交流會(huì)論文選集[C];1982年

2 朱挺廷;;豎井噴錨支護(hù)設(shè)計(jì)與施工[A];地下工程經(jīng)驗(yàn)交流會(huì)論文選集[C];1982年

3 張偉進(jìn);;淺談基坑噴錨支護(hù)的質(zhì)量監(jiān)理[A];錨固與注漿新技術(shù)——第二屆全國(guó)巖石錨固與注漿學(xué)術(shù)會(huì)議論文集[C];2002年

4 安建州;;噴錨支護(hù)加固深基坑邊坡的施工技術(shù)分析[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)大會(huì)論文集[C];2010年

5 何榮惠;;長(zhǎng)營(yíng)嶺井下工程噴錨支護(hù)[A];地下工程經(jīng)驗(yàn)交流會(huì)論文選集[C];1982年

6 岳大昌;;曲靖市南城門(mén)地下商場(chǎng)基坑噴錨支護(hù)的設(shè)計(jì)與施工[A];巖石力學(xué)新進(jìn)展與西部開(kāi)發(fā)中的巖土工程問(wèn)題——中國(guó)巖石力學(xué)與工程學(xué)會(huì)第七次學(xué)術(shù)大會(huì)論文集[C];2002年

7 張偉;厲帥;陳磊;張海波;;洞庫(kù)塌方常見(jiàn)類型及處理技術(shù)研究[A];第15屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅲ冊(cè))[C];2006年

8 孫學(xué)毅;;噴錨支護(hù)回顧與土釘支護(hù)討論[A];錨固與注漿新技術(shù)——第二屆全國(guó)巖石錨固與注漿學(xué)術(shù)會(huì)議論文集[C];2002年

9 張勇;;按多點(diǎn)支承的連續(xù)板確定噴錨支護(hù)參數(shù)的設(shè)計(jì)計(jì)算方法[A];水電與礦業(yè)工程中的巖石力學(xué)問(wèn)題——中國(guó)北方巖石力學(xué)與工程應(yīng)用學(xué)術(shù)會(huì)議文集[C];1991年

10 王明學(xué);廖心北;;砂卵石地層基坑噴錨支護(hù)結(jié)構(gòu)試驗(yàn)研究[A];第八次全國(guó)巖石力學(xué)與工程學(xué)術(shù)大會(huì)論文集[C];2004年

相關(guān)碩士學(xué)位論文 前2條

1 黃曾;深基坑噴錨支護(hù)體系的優(yōu)化設(shè)計(jì)及穩(wěn)定性分析[D];中國(guó)石油大學(xué)(華東);2014年

2 許經(jīng)宇;巖質(zhì)邊坡噴錨支護(hù)在老龍口水利樞紐工程中的應(yīng)用[D];大連理工大學(xué);2012年

,

本文編號(hào):1660106

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/1660106.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a6061***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com