大型建設項目EPC合同爭端預警管理體系研究

發(fā)布時間:2018-10-18 13:22
【摘要】:EPC總承包在所有的總承包模式中最具代表性,并且是使用最頻繁的總承包合同之一,尤其是在國際工程承包中運用最為普遍。自2003年原建設部30號文件頒發(fā)之后,EPC總承包越來越受到國內發(fā)包方的采用。EPC總承包是指工程總承包企業(yè)按照合同約定,承擔工程項目的設計、采購、施工、試運行服務等工作,并對承包工程的質量、安全、工期、造價全面負責。但在實際運用當中,管理者要處理很多潛在的問題,其中EPC合同爭端問題尤為突出。首先,對EPC合同的特點及分類、引發(fā)爭端原因、爭端的特點及分類、EPC合同基本信息分析和爭端預警現狀進行分析,分析結果體現出EPC合同易于產生爭端。其次,研究了EPC合同解決爭端成本的構成和產生爭端的后果,表明EPC合同一旦產生爭端,將會給合同雙方帶來嚴重的后果并且代價極其嚴重。再次,為了預防、警告和跟蹤爭端,根據爭端產生某些征兆性比較強的信息、產生爭端的原因和EPC合同自身特點,綜合運用推理理論、粗糙集理論、熵權法和歐氏距離檢索法構建定性與定量相集成的案例推理與規(guī)則推理相融合(CCBR+RBR)模型來預防和警告有可能發(fā)生的爭端并進行實時跟蹤。進而,在CBR+RBR模型基礎上,增加枚舉法對EPC合同可能產生爭端的關鍵因素進行分析,通過實時控制關鍵因素對EPC合同進行爭端預警。最后,通過案例分析來驗證模型對EPC合同爭端預警的實現;谏鲜龇椒,組建了由業(yè)主、總承包和DAB爭端裁決委員會三方聯(lián)合構成的爭端預警小組并且設計了矩陣式人員職責劃分。該小組具有“三方聯(lián)動”的作用,可以達到“3+14”的管理效果。
[Abstract]:EPC general contracting is the most representative of all general contracting modes, and it is one of the most frequently used general contracting contracts, especially in international engineering contracting. Since the issuance of the document No. 30 of the former Ministry of Construction in 2003, the EPC general contract has been adopted by the domestic contracting parties more and more. EPC general contracting means that the general contracting enterprises undertake the design, procurement, construction, trial operation and other services of the project in accordance with the contract. And the quality of the contract project, safety, duration, cost of the overall responsibility. But in practice, managers have to deal with many potential problems, especially EPC contract disputes. Firstly, the characteristics and classification of EPC contracts, the causes of disputes, the characteristics and classification of disputes, the basic information analysis of EPC contracts and the current situation of dispute warning are analyzed. The results show that EPC contracts are prone to disputes. Secondly, the paper studies the composition of the dispute settlement cost and the result of the dispute in the EPC contract. It shows that once the dispute arises in the EPC contract, it will bring serious consequences to both parties and the cost will be extremely serious. Thirdly, in order to prevent, warn and follow up disputes, according to the information of some symptoms, the causes of disputes and the characteristics of EPC contracts, the reasoning theory and rough set theory are used synthetically. Entropy weight method and Euclidean distance Retrieval (Euclidean distance Retrieval) method are used to construct a (CCBR RBR) model which integrates qualitative and quantitative case-based reasoning and rule-based reasoning to prevent and warn possible disputes and to track them in real time. Furthermore, on the basis of CBR RBR model, adding enumeration method is used to analyze the key factors that may lead to disputes in EPC contracts, and to forewarn the disputes of EPC contracts by controlling key factors in real time. Finally, the paper verifies the realization of EPC contract dispute early warning by case analysis. Based on the above method, a dispute early warning group composed of owner, general contract and DAB dispute adjudication committee is set up and a matrix division of personnel duties is designed. The group has the function of "tripartite linkage" and can achieve the management effect of "3-14".
【學位授予單位】:西安建筑科技大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:F426.92

【參考文獻】

相關期刊論文 前10條

1 張水波;汪輝輝;何伯森;;EPC總承包工程項目的爭端與索賠[J];國際經濟合作;2006年02期

2 路鐵軍;王岳森;任曉帥;;國際工程ADR與新型爭端解決機制之構建[J];國際經濟合作;2008年11期

3 黃李沖;于忠海;陳田;;基于RBR-CBR的數控刀具材料選擇專家系統(tǒng)[J];中國制造業(yè)信息化;2011年21期

4 陳靖;;EPC工程總承包項目管理模式及其風險[J];水利水電工程造價;2007年04期

5 孫瑞英;;基于投射理論的隱性信息需求挖掘研究——以圖書館咨詢解答工作為例[J];圖書館論壇;2011年06期

6 李閆巖;索鑫;;基于交易成本的建設工程爭議評審制度完善[J];商場現代化;2012年28期

7 Per Christiansson;Kistian Birch Sφrensen;Mette Rφdtness;Mette Abrahamsen;Lars Ostenfeld Riemnann;Morten Alsdorf;;User Driven Innovation in the Building Process[J];Tsinghua Science and Technology;2008年S1期

8 胡春萍;馬立紅;;構建卓越的“EPC項目管理體系”——中國石油工程設計有限公司EPC項目管理體系實踐[J];項目管理技術;2009年06期

9 余芳,姜云飛;一種基于樸素貝葉斯分類的特征選擇方法[J];中山大學學報(自然科學版);2004年05期

10 李成;;國際工程承包合同風險管理體系改進[J];中國水運(下半月);2011年09期

相關碩士學位論文 前4條

1 姜華;大型EPC總承包項目的業(yè)主需求識別研究[D];天津大學;2006年

2 付振江;EPC合同爭端預警及爭端解決研究[D];天津大學;2007年

3 史軍;基于粗糙集理論的屬性約簡算法研究[D];青島大學;2009年

4 王向飛;工程爭端預防及爭端處理滿意度研究[D];天津大學;2009年

,

本文編號:2279254

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/qiyeguanlilunwen/2279254.html


Copyright(c)文論論文網All Rights Reserved | 網站地圖 |

版權申明:資料由用戶8ea75***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com