基于容量的新型風電調(diào)度管理模式研究
[Abstract]:In 2015, the wind power output in China was 33.9 billion kilowatt-hours, an increase of 7 percent over the same period last year, with an average wind abandonment rate of 15 percent. Among them, the more serious areas such as Gansu, Xinjiang, and Jilin were all more than 30 percent, while the Inner Mongolia abandoned wind rate was 18 percent. Under the limited power load space, wind power abandonment and power limit has become the bottleneck of the power grid operation in the "three north" areas of our country. The rise of abandoned wind power volume makes the "Sangong" dispatch of wind power become the focus of attention of wind power enterprises. To realize and maintain fair real-time dispatch of wind power is an important subject that grid enterprises and wind power enterprises have faced and need to face for a long time.
【作者單位】: 國網(wǎng)內(nèi)蒙古東部電力有限公司;
【分類號】:F426.61;TM614
【相似文獻】
相關(guān)期刊論文 前10條
1 劉曉賢;;對銀南電網(wǎng)開展“六復核”工作的探討[J];寧夏電力;2004年03期
2 陳彥鋒;;創(chuàng)新電網(wǎng)安全經(jīng)濟運行的對策[J];中國高新技術(shù)企業(yè);2007年15期
3 林森;;2008年3月華東電網(wǎng)電網(wǎng)運行總體情況[J];華東電力;2008年04期
4 ;電網(wǎng)運行培訓部[J];山東電力高等?茖W校學報;2010年02期
5 吳敏;;冰凍威脅電網(wǎng)安全 廣西電網(wǎng)調(diào)度中心積極防控[J];廣西電業(yè);2011年01期
6 姜瑞峰;;加強電網(wǎng)運行維護安全工作的措施[J];農(nóng)村電氣化;2013年06期
7 蒙定中;大電網(wǎng)與大機組的協(xié)調(diào)(一)[J];電力系統(tǒng)自動化;1986年05期
8 ;提高認識、狠抓落實,,努力開創(chuàng)我局電網(wǎng)運行工作的新局面──張惠清總工程師在青海電網(wǎng)運行工作會議上的總結(jié)講話[J];青海電力;1996年03期
9 諸兵;;淺談電網(wǎng)運行技術(shù)的優(yōu)化[J];科技與企業(yè);2013年24期
10 唐長春;;電網(wǎng)運行中自動化程度的探究[J];電子技術(shù)與軟件工程;2013年23期
相關(guān)會議論文 前10條
1 ;全國電網(wǎng)運行與控制標準化技術(shù)委員會成立[A];《電站信息》2009年第1期[C];2009年
2 閔勇;魯宗相;喬穎;徐飛;;風電從“并網(wǎng)”到“融入”大電網(wǎng)運行的轉(zhuǎn)變[A];2010年電力系統(tǒng)自動化學術(shù)研討會論文集[C];2010年
3 韓自奮;;甘肅電網(wǎng)氣象信息服務系統(tǒng)應用功能探討[A];水電站梯級調(diào)度及自動控制技術(shù)研討會論文集[C];2008年
4 吳琛;李玲芳;張丹;張杰;程e
本文編號:2149796
本文鏈接:http://www.sikaile.net/qiyeguanlilunwen/2149796.html