雅礱江孟底溝水電站拱壩拱座抗滑穩(wěn)定研究
[Abstract]:It is an important problem for arch dam design and construction to ensure arch stability. The various structural planes represented by faults and alteration zones in the resistance body of Mengdigou arch dam are relatively developed and the types are complex. The stability of the possible slippage blocks formed by the combination of these structural surfaces poses a great threat to the establishment of the Mengdigou arch dam scheme. In this paper, the traditional rigid body limit equilibrium method and the new rigid body spring element method are taken as the main numerical analysis methods. The anti-slide stability of Mengdigou arch dam abutment is calculated and analyzed thoroughly. Based on the results of comprehensive numerical analysis and model tests, the stability of arch abutment is comprehensively evaluated, and the relative weak position of abutment rock mass is identified, and reasonable suggestions are put forward for engineering measures to enhance the stability of arch dam abutment.
【作者單位】: 中國(guó)電建集團(tuán)成都勘測(cè)設(shè)計(jì)研究院有限公司;
【分類號(hào)】:TV223;TV642.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳正作,劉蕾;拱壩定期檢查的安全度標(biāo)準(zhǔn)研究(續(xù))[J];水利技術(shù)監(jiān)督;2000年03期
2 陳正作;拱壩設(shè)計(jì)研究工作中的一個(gè)新問題[J];水力發(fā)電學(xué)報(bào);2001年01期
3 陳祖坪;拱壩強(qiáng)度裂縫的定量研究[J];水利學(xué)報(bào);2001年08期
4 沛吉;拱壩設(shè)計(jì)中值得注意的幾個(gè)問題[J];水力發(fā)電;2002年05期
5 黎展眉;國(guó)內(nèi)外拱壩建設(shè)與發(fā)展(上)[J];貴州水力發(fā)電;2003年01期
6 張姣,丁成輝;國(guó)內(nèi)拱壩優(yōu)化的研究現(xiàn)狀及動(dòng)態(tài)[J];南昌水專學(xué)報(bào);2004年02期
7 潘家錚;在金沙江溪洛渡水電站拱壩設(shè)計(jì)優(yōu)化咨詢會(huì)上的發(fā)言[J];水電站設(shè)計(jì);2004年02期
8 徐福衛(wèi);梁桂蘭;;拱壩裂縫成因綜述[J];災(zāi)害與防治工程;2004年01期
9 黃小輝;平和花溪拱壩設(shè)計(jì)前期分析及施工調(diào)整[J];漳州職業(yè)技術(shù)學(xué)院學(xué)報(bào);2005年02期
10 黃小輝;平和花溪拱壩設(shè)計(jì)前期分析及施工調(diào)整[J];大眾科技;2005年09期
相關(guān)會(huì)議論文 前10條
1 王仁坤;邵敬東;;沙牌拱壩經(jīng)受了超強(qiáng)地震的考驗(yàn)[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展[C];2009年
2 周乾父;尚志成;;拱壩三維CAD系統(tǒng)[A];土木工程計(jì)算機(jī)應(yīng)用文集——中國(guó)土木工程學(xué)會(huì)計(jì)算機(jī)應(yīng)用學(xué)會(huì)第五屆年會(huì)論文集[C];1993年
3 鄧思華;;拱壩與基礎(chǔ)協(xié)同工作的應(yīng)力分析[A];第七屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(第Ⅱ卷)[C];1998年
4 朱伯芳;;論拱壩應(yīng)力控制標(biāo)準(zhǔn)[A];2002年水工專委會(huì)學(xué)術(shù)交流會(huì)議學(xué)術(shù)論文集[C];2002年
5 馬以超;婁紹撐;;拱壩結(jié)構(gòu)安全評(píng)價(jià)方法初探[A];南方十三省(市、區(qū))水電學(xué)會(huì)聯(lián)絡(luò)會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2007年
6 黎展眉;;國(guó)內(nèi)外拱壩建設(shè)與發(fā)展[A];紀(jì)念貴州省水力發(fā)電工程學(xué)會(huì)成立20周年論文選集[C];2005年
7 陳正作;劉蕾;;基于內(nèi)力法理論的拱壩動(dòng)力計(jì)算[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展(2011年)[C];2011年
8 李忠;朱彥鵬;;小型泥石流攔擋拱壩簡(jiǎn)化計(jì)算方法及其應(yīng)用[A];現(xiàn)代水利水電工程抗震防災(zāi)研究與進(jìn)展[C];2009年
9 吳世偉;李同春;張思俊;呂泰仁;劉寧;;拱壩的失效模式與可靠度[A];工程結(jié)構(gòu)可靠性——中國(guó)土木工程學(xué)會(huì)橋梁及結(jié)構(gòu)工程學(xué)會(huì)結(jié)構(gòu)可靠度委員會(huì)全國(guó)第三屆學(xué)術(shù)交流會(huì)議論文集[C];1992年
10 吳中如;;典型拱壩的嚴(yán)重事故及解析——第十屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議特邀報(bào)告[A];第十屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅰ卷[C];2001年
相關(guān)重要報(bào)紙文章 前1條
1 向良璧 ;我國(guó)拱壩挑戰(zhàn)世界紀(jì)錄[N];經(jīng)濟(jì)參考報(bào);2002年
相關(guān)博士學(xué)位論文 前10條
1 鐘建文;拱壩人工導(dǎo)縫止裂機(jī)制基礎(chǔ)研究[D];清華大學(xué);2015年
2 金海;拱壩優(yōu)化的整體連續(xù)性模型[D];大連理工大學(xué);2004年
3 韋未;拱壩開裂分析及拉應(yīng)力控制方法研究[D];河海大學(xué);2005年
4 吳黨中;拱壩優(yōu)化時(shí)基礎(chǔ)變模敏感性及壩肩傳力洞增穩(wěn)效應(yīng)研究[D];浙江大學(xué);2012年
5 孫林松;三維彈塑性接觸問題的線性互補(bǔ)方法及拱壩結(jié)構(gòu)非整體性分析研究[D];河海大學(xué);2001年
6 宋貞霞;考慮河谷場(chǎng)地效應(yīng)的拱壩—地基地震響應(yīng)分析方法研究[D];中國(guó)地震局工程力學(xué)研究所;2013年
7 肖詩云;混凝土率型本構(gòu)模型及其在拱壩動(dòng)力分析中的應(yīng)用[D];大連理工大學(xué);2002年
8 趙蘭浩;考慮壩體—庫水—地基相互作用的有橫縫拱壩地震響應(yīng)分析[D];河海大學(xué);2006年
9 寇立夯;基于性能的高壩抗震設(shè)計(jì)若干關(guān)鍵問題研究[D];清華大學(xué);2009年
10 楊令強(qiáng);高拱壩開裂分析及安全評(píng)價(jià)[D];天津大學(xué);2003年
相關(guān)碩士學(xué)位論文 前10條
1 熊敬;思德拱壩裂縫成因的分析研究[D];四川大學(xué);2005年
2 張燕;拱壩變形安全監(jiān)控因果模型研究[D];河海大學(xué);2006年
3 黎傘傘;拱壩基礎(chǔ)墊層的結(jié)構(gòu)作用研究[D];貴州大學(xué);2015年
4 孫景昱;白鶴灘拱壩左壩肩特定塊體三維非線性有限元分析研究[D];揚(yáng)州大學(xué);2016年
5 王捷;拱壩極限承載力及抗震分析的研究[D];揚(yáng)州大學(xué);2016年
6 付延凱;基于ANSYS的拱壩結(jié)構(gòu)性能分析[D];山東農(nóng)業(yè)大學(xué);2016年
7 王佳欣;威后水電站拱壩壩肩抗滑穩(wěn)定分析[D];長(zhǎng)春工程學(xué)院;2017年
8 孫興蘭;基于workbench的不對(duì)稱拱壩穩(wěn)定性靜力分析[D];河北工程大學(xué);2017年
9 楊舒涵;青龍深“U”形拱壩靜、動(dòng)力分析及承載能力研究[D];武漢大學(xué);2017年
10 余琳君;地震波斜入射下拱壩地震響應(yīng)分析[D];昆明理工大學(xué);2017年
,本文編號(hào):2348856
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2348856.html