大型水利工程項(xiàng)目的績(jī)效評(píng)價(jià)研究
[Abstract]:Under the system of socialist market economy in China, large water conservancy projects are generally managed by relevant government departments and invested with government financial funds. The large water conservancy projects invested by the government generally have the characteristics of large investment, long implementation period, multi-project management and wide social benefits. There are many resource conflicts between different subprojects, such as project funds, designers, construction units and so on. This paper will study how to establish a performance evaluation system in the implementation of large water conservancy projects and adjust the priority order of multiple projects according to the results of periodic performance evaluation and adjust the project implementation plan. At present, most of the project performance evaluation in China is mainly the performance evaluation after the completion of the project, and the performance evaluation in the process of project implementation is still very few. Because this kind of government investment project investment amount is huge, if there is no effective project performance evaluation system, once the project is implemented, many factors will be out of control, and it is easy to cause project delay. The social benefits of the project construction can not be reflected, or even duplicate construction. Therefore, in the current project management mode, the performance evaluation in the process of project implementation is of great significance to the project. This paper will focus on the large water conservancy projects invested by the government as the research object and study the performance evaluation method in the implementation period of the projects. The main works of this paper are as follows: 1) according to the characteristics of large water conservancy projects, an effective performance evaluation index system is set up from three aspects: the impact of project benefit, the project construction results and the progress of project construction. The method of monitoring and analysis of the indicators is refined to evaluate the performance in the process of project implementation. 2) Analytic hierarchy process (AHP) is used to analyze and calculate the comprehensive weight vector of each performance evaluation index according to the importance of different performance evaluation indicators to complete the overall goal of the project, which can be used to evaluate and analyze the performance of similar projects in the future. 3) according to the analysis results of periodic performance evaluation, the priority order of each sub-project is analyzed and adjusted according to the relationship between different sub-projects and performance evaluation indicators in multi-project management mode. Adjust the project implementation plan in time according to the project resources. In this study, combined with a large water conservancy project in China, the concrete method of this research is applied in practice, which plays a very important role in promoting the performance evaluation of the project.
【學(xué)位授予單位】:中國(guó)科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F426.91
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 易平濤;張丹寧;郭亞軍;高立群;;動(dòng)態(tài)綜合評(píng)價(jià)中的無(wú)量綱化方法[J];東北大學(xué)學(xué)報(bào)(自然科學(xué)版);2009年06期
2 馮兆祥;蔣波;;多項(xiàng)目、多層次、多方協(xié)同的項(xiàng)目管理系統(tǒng)在大型交通工程建設(shè)管理中的應(yīng)用[J];中國(guó)工程科學(xué);2010年04期
3 王恩列;;運(yùn)用現(xiàn)代項(xiàng)目管理知識(shí)促進(jìn)企業(yè)戰(zhàn)略發(fā)展[J];管理工程學(xué)報(bào);2005年S1期
4 丁洪斌;;建筑施工企業(yè)項(xiàng)目協(xié)同管理成熟度及其績(jī)效評(píng)價(jià)[J];管理現(xiàn)代化;2009年05期
5 賴芨宇;鄭建國(guó);;模糊聚類在項(xiàng)目管理績(jī)效評(píng)價(jià)中的應(yīng)用研究[J];基建優(yōu)化;2006年06期
6 吳海放;顧維婭;楊文興;;多級(jí)網(wǎng)絡(luò)計(jì)劃模型在多項(xiàng)目管理中的應(yīng)用[J];江蘇船舶;2008年01期
7 陳友玲;張曉麗;覃承海;;基于關(guān)鍵鏈的多項(xiàng)目計(jì)劃編制[J];計(jì)算機(jī)集成制造系統(tǒng);2009年07期
8 張艷球;肖躍軍;;論建筑企業(yè)的多項(xiàng)目管理模式[J];山西建筑;2009年08期
9 鐘穩(wěn);廖良才;;多項(xiàng)目進(jìn)度瓶頸——關(guān)鍵鏈?zhǔn)鳾J];科學(xué)技術(shù)與工程;2011年25期
10 劉志偉;;監(jiān)理企業(yè)多項(xiàng)目管理模式應(yīng)用探討[J];科學(xué)之友;2010年07期
,本文編號(hào):2327880
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2327880.html