葉巴灘水電工程施工初期導流標準優(yōu)選
發(fā)布時間:2018-08-11 20:37
【摘要】:葉巴灘水電工程規(guī)模巨大,施工難度高,采用科學的方法優(yōu)選出安全、經(jīng)濟、合理的施工初期導流標準意義重大。結(jié)合該工程施工期特點,基于風險分析理論,從歷史洪水、實測洪水、初期導流風險率、風險決策等多方面展開了系統(tǒng)分析。結(jié)果表明,葉巴灘水電站施工初期導流標準選擇20 a一遇洪水是科學合理的。分析方法可為高拱壩施工初期導流標準的優(yōu)選提供借鑒。
[Abstract]:Because of the large scale and high difficulty of construction, it is of great significance to select safety, economic and reasonable standard of diversion in the early stage of construction by scientific method. According to the characteristics of the project during the construction period and based on the theory of risk analysis, the systematic analysis is carried out from the aspects of historical flood, measured flood, initial diversion risk rate, risk decision, and so on. The results show that it is scientific and reasonable to select the standard of diversion in the initial stage of construction of Yabatan Hydropower Station. The analytical method can be used for reference for the optimal selection of initial diversion standards for high arch dams.
【作者單位】: 中國電建集團成都勘測設計研究院有限公司;
【基金】:成都勘測設計院科研資助項目(P228-2014)
【分類號】:TV551.1
本文編號:2178171
[Abstract]:Because of the large scale and high difficulty of construction, it is of great significance to select safety, economic and reasonable standard of diversion in the early stage of construction by scientific method. According to the characteristics of the project during the construction period and based on the theory of risk analysis, the systematic analysis is carried out from the aspects of historical flood, measured flood, initial diversion risk rate, risk decision, and so on. The results show that it is scientific and reasonable to select the standard of diversion in the initial stage of construction of Yabatan Hydropower Station. The analytical method can be used for reference for the optimal selection of initial diversion standards for high arch dams.
【作者單位】: 中國電建集團成都勘測設計研究院有限公司;
【基金】:成都勘測設計院科研資助項目(P228-2014)
【分類號】:TV551.1
【相似文獻】
相關期刊論文 前10條
1 胡志根,劉全,賀昌海,肖煥雄,周宜紅,傅崢,李定葵;水利水電工程施工初期導流標準多目標風險決策研究[J];中國工程科學;2001年08期
2 徐森泉,胡志根,劉全,黃河,蒲建平;基于熵權(quán)的導流標準多目標決策分析[J];中國農(nóng)村水利水電;2004年08期
3 朱張華;黃強;陶培琪;席秋義;;水電工程導流標準多目標決策模糊物元分析[J];西北水電;2006年01期
4 王卓甫;;試論現(xiàn)行導流標準規(guī)范及改進的問題[J];河海大學學報;1990年04期
5 趙永君,黃仲斌,馮吉新,孫開暢;雙溝水電站導流標準的確定[J];東北水利水電;1999年06期
6 蘇琴;周建旭;;多目標系統(tǒng)模糊決策法在導流標準比選中的應用[J];中國農(nóng)村水利水電;2007年12期
7 史興嶺;;羊曲水電站施工導流標準選擇[J];西北水電;2013年01期
8 徐銥;;二灘水電站導流標準和漂木流量淺析[J];水電站設計;1986年01期
9 鐘 平;凌津灘工程施工導流標準及導流建筑物型式的確定[J];大壩與安全;2002年02期
10 羅孝明;小灣水電站初期導流標準風險分析[J];云南水力發(fā)電;2002年01期
相關會議論文 前1條
1 馬建國;;哈達山水利樞紐工程施工組織導流設計[A];土石壩技術——2008年論文集[C];2008年
,本文編號:2178171
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2178171.html
最近更新
教材專著