基于馬爾科夫過程的高堆石壩施工度汛決策模型
[Abstract]:The time variation of water retaining risk and the uncertainty of filling schedule in construction of high rockfill dam make it difficult to make decision of flood project during the construction period of high rockfill dam. According to the characteristics of the dynamic change of flood process in construction of high rockfill dam, the risk of dam retaining is simulated randomly, and three risk states are divided to judge the flood action. With the aim of minimizing the cost of the whole flood construction period, considering the key factors such as flood flow, filling schedule and decision cost, the decision model of high rockfill dam construction flood making based on Markov process is established. This paper analyzes the flood control strategy, cost function and risk state transition probability of monthly dam water retaining risk state. On the basis of testing its Markov characteristics, the decision iterative algorithm is used to solve the optimal construction flood plan and the decision path of the flood process at each decision time. The analysis of engineering examples shows that the control result of the decision model for flood plan strategy of high rockfill dam is in line with the change of flood elevation in actual construction, which provides a reference for the rapid and accurate formulation of flood plan for dam construction.
【作者單位】: 三峽大學(xué)水利與環(huán)境學(xué)院;
【基金】:國(guó)家自然科學(xué)基金項(xiàng)目(51509143) 長(zhǎng)江科學(xué)院開放研究基金項(xiàng)目(CKWV2016398/KY)
【分類號(hào)】:TV51;TV87
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 于艷玲,袁偉紅,齊占東;柳石壩、堆石壩施工和運(yùn)行中應(yīng)注意的幾個(gè)問題[J];黑龍江水專學(xué)報(bào);2004年01期
2 劉珊珊,周宜紅,劉全,胡志根,賀昌海;堆石壩施工的實(shí)時(shí)動(dòng)態(tài)仿真系統(tǒng)研究[J];系統(tǒng)仿真學(xué)報(bào);2004年11期
3 李曉峰;陳東;;堆石壩施工中的土石方動(dòng)態(tài)調(diào)配[J];建設(shè)科技;2011年23期
4 任永超;謝中華;;淺談堆石壩施工[J];內(nèi)蒙古水利;2012年03期
5 鐘登華;常昊天;劉寧;張平;;高堆石壩施工過程的仿真與優(yōu)化[J];水利學(xué)報(bào);2013年07期
6 涂揚(yáng)舉;馬光文;陶春華;過夏明;唐明;;基于加速遺傳算法的堆石壩施工優(yōu)化[J];水力發(fā)電;2007年01期
7 姜允松;高堆石壩施工質(zhì)量統(tǒng)計(jì)管理方法研究[J];云南水力發(fā)電;1997年03期
8 楊迪生;;堆石壩施工技術(shù)問題分析[J];中國(guó)水運(yùn)(下半月);2009年03期
9 壽文榮;;堆石壩施工中振動(dòng)壓路機(jī)鋼輪損壞原因分析[J];工程機(jī)械;2009年05期
10 劉瀲;胡志根;;時(shí)變條件下高堆石壩施工度汛協(xié)商決策的演化分析模型[J];水利學(xué)報(bào);2013年11期
相關(guān)碩士學(xué)位論文 前2條
1 劉珊珊;堆石壩施工實(shí)時(shí)動(dòng)態(tài)仿真系統(tǒng)研究與開發(fā)[D];武漢大學(xué);2005年
2 李正;基于Pareto解的堆石壩施工工期-質(zhì)量-成本均衡優(yōu)化研究[D];天津大學(xué);2016年