天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 水利工程論文 >

綜合利用水利樞紐PPP項目特許運營階段風險分擔研究

發(fā)布時間:2018-07-04 21:31

  本文選題:綜合利用水利樞紐 + PPP項目; 參考:《華北水利水電大學》2017年碩士論文


【摘要】:水利是農(nóng)業(yè)發(fā)展的命脈,是國民經(jīng)濟和社會發(fā)展的重要基礎。合理開發(fā)利用水利資源,興水利除水害,需要切實提高水資源的利用效率與效益,力爭做到興水惠民。綜合利用水利樞紐就是興水惠民的重要項目,其同時承擔防洪、發(fā)電、灌溉、旅游、航運等多項任務。由于綜合利用水利樞紐PPP項目建設工期長、投資規(guī)模大、風險因素多等特點,項目中的主要風險能否被公平合理地分擔是項目成敗的關鍵所在。本文通過引入利益相關者理論,視PPP項目為利益主體多元化的綜合系統(tǒng),在識別綜合利用水利樞紐PPP項目特許運營階段風險因素、評估綜合利用水利樞紐PPP項目特許運營階段關鍵風險因素、考慮合作雙方風險偏好與風險承受能力的基礎上,建立了PPP項目風險分擔機制,將項目風險分為共擔風險和非共擔風險,針對共擔風險,構建了在完全信息和不完全信息條件下的討價還價博弈模型,并分別得出其均衡解。本課題研究不僅從理論上補充了PPP項目風險分擔研究的不足,而且實踐上也為合理確定項目參與方風險分配份額提供了決策依據(jù),切實保障了項目的順利進行,為PPP模式在我國的健康發(fā)展做出了一定貢獻。
[Abstract]:Water conservancy is the lifeblood of agricultural development and the important foundation of national economy and social development. It is necessary to improve the efficiency and benefit of water resources in order to develop and utilize water resources reasonably and to promote water conservancy to benefit the people. Comprehensive utilization of water conservancy projects is an important project for the benefit of the people, which simultaneously undertakes many tasks such as flood control, power generation, irrigation, tourism, shipping and so on. Due to the characteristics of long construction period, large investment scale and many risk factors, whether the main risks in the project can be shared fairly and reasonably is the key to the success or failure of the project. By introducing stakeholder theory and considering PPP project as a comprehensive system of multiple stakeholders, this paper identifies the risk factors in the stage of franchise operation of PPP project in comprehensive utilization of water conservancy project. The risk sharing mechanism of PPP project is established on the basis of synthetically utilizing the key risk factors of PPP project in franchise operation stage and considering the risk preference and risk bearing capacity of both partners. The project risk is divided into shared risk and non-shared risk. The bargaining game model under the condition of complete information and incomplete information is constructed and its equilibrium solution is obtained respectively. This research not only complements the deficiency of PPP project risk sharing research theoretically, but also provides the decision basis for determining the risk allocation share of project participants reasonably, and ensures the smooth progress of the project. It has contributed to the healthy development of PPP in China.
【學位授予單位】:華北水利水電大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:F283;F426.91

【參考文獻】

相關期刊論文 前10條

1 張水波;張晨;高穎;;公私合營(PPP)項目的規(guī)制研究[J];天津大學學報(社會科學版);2014年01期

2 巴希;烏云娜;胡新亮;李澤眾;;基于粗糙集理論的PPP項目風險分擔研究[J];技術經(jīng)濟與管理研究;2013年05期

3 劉繼才;王穎林;唐絲絲;;我國PPP項目關鍵風險實證研究[J];生產(chǎn)力研究;2013年04期

4 劉U,

本文編號:2097513


資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2097513.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶62393***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com