混凝土壩非穩(wěn)態(tài)施工過程異常監(jiān)控與管理研究
發(fā)布時間:2018-06-30 21:57
本文選題:非穩(wěn)態(tài) + 施工過程 ; 參考:《計算機工程與應用》2017年20期
【摘要】:為有效管控混凝土壩非穩(wěn)態(tài)施工過程,針對施工過程中施工資源的時變性造成施工計劃變更頻繁、施工進度難以保證等問題,首先對多域施工資源進行了統(tǒng)一形式化描述,定義了施工任務與施工資源之間的關聯(lián)約束關系,然后對施工資源異常進行分類定義并建立了單源、多源隨機資源異常事件的響應機制與傳播算法,開發(fā)了可管控施工資源動態(tài)變化的施工過程管理原型系統(tǒng),在某水電站主體工程施工過程中進行原型應用,取得了較好效果。該方法可作為施工仿真系統(tǒng)的有效補充用于水電工程施工過程管理。
[Abstract]:In order to effectively control the unsteady construction process of concrete dam, aiming at the problems such as frequent change of construction plan caused by time-varying of construction resources during construction process and difficulty in ensuring construction progress, the multi-domain construction resources are described in a unified formalized way. The relationship between construction task and construction resource is defined, then the anomaly of construction resource is classified and defined, and the response mechanism and propagation algorithm of single source, multi-source random resource anomaly event are established. The prototype system of construction process management which can control the dynamic change of construction resources is developed. The prototype is applied in the construction process of the main project of a hydropower station, and good results have been obtained. The method can be used as an effective supplement to the construction simulation system for the construction process management of hydropower projects.
【作者單位】: 湖北省水電工程施工與管理重點實驗室(三峽大學);三峽大學機械與動力學院;
【基金】:湖北省水電工程施工與管理重點實驗室開放基金(No.2014KSD11) 三峽大學人才科研啟動基金(No.KJ2014B041) 宜昌市大學科學研究與應用項目(No.A16-302-a02) 國家自然科學基金面上項目(No.50945042)
【分類號】:TV544
【相似文獻】
相關期刊論文 前4條
1 鄭孝宇,褚君達,朱維斌;河網非穩(wěn)態(tài)水環(huán)境容量研究[J];水科學進展;1997年01期
2 代應權;;水庫施工過程中存在的問題及對策[J];黑龍江水利科技;2013年09期
3 晉良海;梁川;;龍灘電站施工資源無序擠占時最優(yōu)限制補給研究[J];水力發(fā)電學報;2009年05期
4 秦世潤;;淺談工程項目施工過程中的風險控制[J];山西水利科技;2007年01期
,本文編號:2086978
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2086978.html