高海拔西藏旁多水利樞紐工程TBM監(jiān)測(cè)維護(hù)與刀具損耗規(guī)律研究
本文選題:TBM + 刀具磨損 ; 參考:《石家莊鐵道大學(xué)》2014年碩士論文
【摘要】:隨著我國(guó)地鐵、鐵路、水利等基礎(chǔ)設(shè)施大規(guī)模的建設(shè),有著大量的大長(zhǎng)隧道需要建設(shè)。TBM施工技術(shù)以快速、安全、環(huán)保等優(yōu)勢(shì),逐漸成為越來(lái)越多的隧道工程的主要施工方式之一。TBM的步進(jìn)方案、刀具的磨損、在線(xiàn)監(jiān)測(cè)以及設(shè)備的維護(hù)保養(yǎng)等內(nèi)容的研究對(duì)TBM的施工效率的提高,節(jié)約施工成本有著重要的意義。 西藏旁多水利樞紐工程是國(guó)內(nèi)乃至世界上,第一個(gè)將TBM施工應(yīng)用于海拔高度大于4000m的工程。本論文以該工程為背景,對(duì)工程當(dāng)?shù)氐牡刭|(zhì)資料進(jìn)行了分析,在現(xiàn)場(chǎng)記錄了刀具損耗的相關(guān)數(shù)據(jù),通過(guò)對(duì)這些數(shù)據(jù)進(jìn)行數(shù)理統(tǒng)計(jì)分析,對(duì)TBM刀具磨損、損耗規(guī)律進(jìn)行了研究;另外,筆者在現(xiàn)場(chǎng)參與TBM組裝、調(diào)試、步進(jìn)及施工等相關(guān)工作,,對(duì)TBM的步進(jìn)方案、在線(xiàn)監(jiān)測(cè)系統(tǒng)及設(shè)備的維護(hù)保養(yǎng)等方面又做了較為深入的研究。 本文研究表明,在IV類(lèi)圍巖條件下,不同的巖性的巖石對(duì)于刀具的磨損情況也是大有不同的。在巖石較硬的砂巖洞段,刀具的磨損較大,而在巖石相對(duì)較軟的炭質(zhì)頁(yè)巖洞段,刀具的磨損就相對(duì)較小。另外,在同類(lèi)巖石的洞段,各刀位刀具的磨損還與滾刀距離刀盤(pán)中心的位置有關(guān),即距刀盤(pán)中心越遠(yuǎn)刀具磨損量越大。此外,通過(guò)對(duì)本工程TBM步進(jìn)方案的研究,提出了本工程條件下的TBM步進(jìn)的優(yōu)化方案。通過(guò)對(duì)在線(xiàn)監(jiān)測(cè)及設(shè)備維護(hù)保養(yǎng)等方面的研究,研究在線(xiàn)監(jiān)測(cè)監(jiān)測(cè)設(shè)備的參數(shù)及傳感器布置的位置,總結(jié)出針對(duì)于本工程的維護(hù)保養(yǎng)規(guī)程,對(duì)于工程的后期施工及類(lèi)似工程的故障監(jiān)測(cè)診斷及保養(yǎng)也有一定的參考價(jià)值。
[Abstract]:With the large - scale construction of the infrastructure such as the subway , railway and water conservancy in our country , there are a lot of large - length tunnels to be constructed . TBM construction technology has become one of the main construction methods of more and more tunnel projects with the advantages of rapid , safe and environmental protection . The construction efficiency of TBM is greatly improved by TBM ' s stepping scheme , tool wear , on - line monitoring and maintenance and maintenance of equipment , and the construction cost is saved .
Based on the project , this paper analyzes the geological data of the project and records the relevant data of the tool loss in the field . Through the mathematical statistics analysis of these data , the wear and loss laws of TBM cutters are studied .
In addition , in the field of TBM assembly , debugging , stepping and construction , the author further studied the step scheme , on - line monitoring system and maintenance and maintenance of TBM .
In this paper , it is shown that under the condition of Class IV surrounding rock , the rock of different lithology is different for the wear of cutters . In the hard sandstone tunnel segment , the wear of cutters is relatively small . In addition , the tool wear is relatively small in the rock tunnel segment of relatively soft rock . In addition , through the research on the TBM stepping scheme of the project , the paper studies the parameters of the online monitoring and monitoring equipment and the location of the sensor arrangement , summarizes the maintenance and maintenance procedures for the project , and has some reference value for the later construction of the project and the fault monitoring and diagnosis and maintenance of similar projects .
【學(xué)位授予單位】:石家莊鐵道大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:TV534;TG71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉寧寧;李正;;海拔2000m以上的低氣壓條件對(duì)電子產(chǎn)品安全性能的影響[J];安全與電磁兼容;2008年01期
2 楊媛媛;黃宏偉;;圍巖分類(lèi)在TBM滾刀壽命預(yù)測(cè)中的應(yīng)用[J];地下空間與工程學(xué)報(bào);2005年05期
3 王旭;李曉;廖秋林;;巖石可掘進(jìn)性研究的試驗(yàn)方法述評(píng)[J];地下空間與工程學(xué)報(bào);2009年01期
4 茅承覺(jué),劉友元;隧洞掘進(jìn)機(jī)盤(pán)形滾刀滾壓巖石的試驗(yàn)[J];工程機(jī)械;1985年03期
5 田少民;工程機(jī)械的狀態(tài)監(jiān)測(cè)與故障診斷技術(shù)[J];工程機(jī)械;2001年01期
6 甄勝祥;李理;徐廣輝;江健;;高原型工程機(jī)械散熱系統(tǒng)的改進(jìn)與應(yīng)用[J];工程機(jī)械;2009年03期
7 鄭智;許翔;靳尚杰;;高原地區(qū)對(duì)液壓工程機(jī)械的影響及應(yīng)對(duì)策略[J];工程機(jī)械與維修;2010年02期
8 陳開(kāi)運(yùn);高海拔電氣設(shè)備工作特點(diǎn)及設(shè)計(jì)要求[J];機(jī)車(chē)電傳動(dòng);2005年02期
9 熊文輝;;鐵路大型養(yǎng)路機(jī)械液壓系統(tǒng)設(shè)計(jì)的新思路[J];機(jī)床與液壓;2006年07期
10 劉宏志;;TBM及盾構(gòu)機(jī)設(shè)備狀態(tài)監(jiān)測(cè)與故障診斷實(shí)用技術(shù)綜述[J];隧道建設(shè);2007年06期
本文編號(hào):2025239
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/2025239.html