天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁(yè) > 科技論文 > 水利工程論文 >

華能西藏公司藏木等水電站遠(yuǎn)程集控工程應(yīng)用研究

發(fā)布時(shí)間:2018-05-19 14:50

  本文選題:雅魯藏布江流域 + 無(wú)人值班 ; 參考:《清華大學(xué)》2014年碩士論文


【摘要】:華能西藏發(fā)電有限公司(簡(jiǎn)稱(chēng)華能西藏公司)是水電站為主的區(qū)域發(fā)電公司,公司主要針對(duì)雅魯藏布江流域梯級(jí)電站進(jìn)行開(kāi)發(fā)。本文以建設(shè)國(guó)內(nèi)先進(jìn)的集控中心系統(tǒng)為目標(biāo),通過(guò)前期對(duì)國(guó)內(nèi)大型水電站集控的調(diào)研,借鑒國(guó)內(nèi)外先進(jìn)技術(shù),提出在區(qū)域第一個(gè)電站建設(shè)初期就在藏木業(yè)主營(yíng)地建設(shè)藏木擴(kuò)大廠(chǎng)站中控室(山南集控中心)對(duì)雅魯藏布江流域中游街需、藏木、加查水電站進(jìn)行集中控制;同時(shí)在華能西藏公司林芝基地建設(shè)雅魯藏布江流域林芝集控中心對(duì)雅魯藏布江中下游梯級(jí)電站進(jìn)行集中監(jiān)控;并在成都建設(shè)成都運(yùn)營(yíng)管理及技術(shù)支持中心對(duì)華能西藏公司在藏所有電站實(shí)施遠(yuǎn)方監(jiān)控的雅魯藏布江流域大型遠(yuǎn)程集控方案,從而節(jié)約工程建設(shè)投資,減少運(yùn)行人員配置,改善生產(chǎn)管理人員工作環(huán)境。結(jié)合以山南集控中心、林芝集控中心及成都運(yùn)營(yíng)管理及技術(shù)支持中心構(gòu)成的遠(yuǎn)程集控方案,本文就該種模式下流域集控中心的綜合自動(dòng)化系統(tǒng)進(jìn)行研究,確定綜合自動(dòng)化系統(tǒng)的構(gòu)成,建立系統(tǒng)安全防護(hù)體系,完成系統(tǒng)組網(wǎng)及帶寬分配。同時(shí),為實(shí)現(xiàn)電站安全、穩(wěn)定、經(jīng)濟(jì)的生產(chǎn)運(yùn)行需要,適應(yīng)“無(wú)人值班”的現(xiàn)代化水電站生產(chǎn)管理模式,滿(mǎn)足現(xiàn)代化數(shù)字電站所必須的集中調(diào)度管理、分布式網(wǎng)絡(luò)控制要求,本文提出基于雅魯藏布江流域梯級(jí)電站全開(kāi)放、分布式的綜合自動(dòng)化系統(tǒng)整體解決方案。文中建立了包括計(jì)算機(jī)監(jiān)控系統(tǒng)、數(shù)據(jù)交換系統(tǒng)、消防監(jiān)控系統(tǒng)、工業(yè)電視系統(tǒng)、通信系統(tǒng)等綜合自動(dòng)化系統(tǒng)主要子系統(tǒng)的總體結(jié)構(gòu),完成了相應(yīng)系統(tǒng)的功能及設(shè)備配置。本文研究的亮點(diǎn)在于:(1)在國(guó)內(nèi)大江大河干流上首個(gè)電站建設(shè)之初,就對(duì)整個(gè)流域的遠(yuǎn)程集控進(jìn)行規(guī)劃,集控中心與首個(gè)電站首臺(tái)機(jī)組同時(shí)投運(yùn)。(2)在國(guó)內(nèi)大型水電站建設(shè)時(shí)現(xiàn)場(chǎng)就不設(shè)置中控室和計(jì)算機(jī)監(jiān)控系統(tǒng)上位機(jī)。(3)確定了公司建設(shè)“無(wú)人值班電站群(即關(guān)門(mén)運(yùn)行電站群)、遠(yuǎn)程集控”的建設(shè)標(biāo)準(zhǔn)以及今后公司電站的管理模式。本文通過(guò)對(duì)雅魯藏布江流域遠(yuǎn)程集控方案及集控中心綜合自動(dòng)化系統(tǒng)的研究,基本完成了流域遠(yuǎn)程集控系統(tǒng)的設(shè)計(jì)與規(guī)劃,為電站集控建設(shè)降低成本、優(yōu)化人員配置、改善工作環(huán)境和穩(wěn)定職工隊(duì)伍提供基礎(chǔ),同時(shí)也為西藏地區(qū)大型水電站的開(kāi)發(fā)提供實(shí)踐經(jīng)驗(yàn)。
[Abstract]:Huaneng Tibet Power Generation Co., Ltd (Huaneng Tibet Company) is a regional power generation company based on hydropower stations, which mainly aims at the development of cascade power stations in the Brahmaputra River basin. This paper aims at constructing the advanced centralized control center system in China. Through the investigation and research on the centralized control of large hydropower stations at home and abroad, the paper draws lessons from the advanced technology at home and abroad. It is put forward that in the early stage of construction of the first hydropower station in the region, the central control room (central control center of Shannan centralized control center) will be built in the main site of the Tibet timber industry to control the Yalu Zangbo River valley in the middle street, Tibetan wood, and Jiacha hydropower stations. At the same time in Huaneng Tibet Company Linzhi base construction of Yalu Zangbo River Basin Linzhi centralized control center to the middle and lower reaches of the Brahmaputra cascade power station centralized monitoring; And to build the Chengdu Operation Management and Technical support Center in Chengdu to implement a large-scale remote centralized control scheme for Huaneng Tibet Company to monitor all power stations in Tibet remotely, so as to save construction investment and reduce the number of operational personnel. Improve the working environment of production managers. Combined with the remote centralized control scheme composed of Shannan centralized control center, Linzhi centralized control center and Chengdu operation management and technical support center, this paper studies the integrated automation system of watershed centralized control center under this mode. The composition of the integrated automation system is determined, the system security protection system is established, and the system network and bandwidth distribution are completed. At the same time, in order to realize the safe, stable and economical operation of the power station, adapt to the production management mode of the modern hydropower station with "no one on duty", and meet the requirements of centralized dispatching management and distributed network control for the modern digital power station, In this paper, an overall solution of integrated automation system based on Yalu Zangbo River basin cascade power station is proposed. In this paper, the overall structure of the main subsystems of the integrated automation system, including computer monitoring system, data exchange system, fire control system, industrial television system, communication system and so on, is established, and the function and equipment configuration of the corresponding system are completed. The bright spot of this paper is that at the beginning of the construction of the first power station on the main stream of the great rivers in China, the remote centralized control of the whole river basin was planned. The centralized control center and the first unit of the first power station were put into operation at the same time. In the construction of large hydropower stations in China, the central control room and the computer monitoring system were not set up in the field. The "unattended power station group" (that is, closed operation) was determined. Construction standard of power station group, remote centralized control and management mode of power station in the future. In this paper, the design and planning of remote centralized control system of Yalu Zangbo River basin and the integrated automation system of centralized control center are basically completed, which can reduce the cost and optimize the personnel allocation for the centralized control construction of the power station. Improving the working environment and stabilizing the work force provide the basis for the development of large hydropower stations in Tibet.
【學(xué)位授予單位】:清華大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:TV736

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 劉曉春;;玉林電網(wǎng)集控中心模式的研究與探討[J];廣西電業(yè);2007年12期

2 肖翔;張小軍;杜軼軒;詹代俊;;集控與地調(diào)互備系統(tǒng)淺析[J];江蘇電機(jī)工程;2010年01期

3 周濤;李霄;李佳;;成立變電集控中心利弊之淺見(jiàn)[J];安徽電氣工程職業(yè)技術(shù)學(xué)院學(xué)報(bào);2011年S1期

4 賴(lài)生平;李康;何榮;;集控中心調(diào)度系統(tǒng)在水電站中的應(yīng)用[J];自動(dòng)化應(yīng)用;2012年11期

5 劉軍;;淺談水電站集控中心通信系統(tǒng)建設(shè)[J];信息通信;2013年03期

6 龍本焱;;淺談變電集控中心監(jiān)控技術(shù)[J];廣東科技;2013年24期

7 譚小林;;水洛河流域成都集控中心通信規(guī)劃實(shí)施方案探討[J];四川水力發(fā)電;2013年S1期

8 李宏國(guó);;水洛河流域集控中心建設(shè)與運(yùn)行管理模式探討[J];四川水力發(fā)電;2013年S1期

9 王崢瀛;王桂平;周民;馮迅;;黃河上游集控中心電力調(diào)度自動(dòng)化系統(tǒng)設(shè)計(jì)及實(shí)現(xiàn)[J];水電廠(chǎng)自動(dòng)化;2006年S1期

10 ;貴州烏江水電開(kāi)發(fā)有限責(zé)任公司水電站遠(yuǎn)程集控中心簡(jiǎn)介[J];貴州水力發(fā)電;2009年01期

相關(guān)會(huì)議論文 前10條

1 李進(jìn);;基于集控中心站流程化管理的探討[A];2011年云南電力技術(shù)論壇論文集(入選部分)[C];2011年

2 馬杰;吳正義;孫爾軍;;大渡河流域梯級(jí)水電站群集控中心監(jiān)控系統(tǒng)[A];中國(guó)水力發(fā)電工程學(xué)會(huì)信息化專(zhuān)委會(huì)2009年學(xué)術(shù)交流會(huì)論文集[C];2009年

3 況光彥;熊濤;郝敏;;流域梯級(jí)電站集控中心設(shè)置和統(tǒng)調(diào)技術(shù)思考[A];大型水輪發(fā)電機(jī)組技術(shù)論文集[C];2008年

4 鄧鵬程;毛琦;;淺談清水江流域集控中心自動(dòng)化系統(tǒng)方案設(shè)計(jì)[A];中國(guó)水力發(fā)電工程學(xué)會(huì)信息化專(zhuān)委會(huì)2007年學(xué)術(shù)交流會(huì)論文集[C];2007年

5 逯俊杰;蒲瑜;任志波;;官地電站上送集控中心監(jiān)控事件分析與研究[A];梯級(jí)調(diào)度控制研究論叢——2012年學(xué)術(shù)交流論文集(下冊(cè))[C];2014年

6 李汶江;周馨;;500千伏設(shè)備集控中心建設(shè)研究[A];重慶市電機(jī)工程學(xué)會(huì)2010年學(xué)術(shù)會(huì)議論文集[C];2010年

7 韓長(zhǎng)霖;譚華;王崢瀛;;遠(yuǎn)程集控中心同步接機(jī)技術(shù)研究與探索[A];中國(guó)水力發(fā)電工程學(xué)會(huì)信息化專(zhuān)委會(huì)、水電控制設(shè)備專(zhuān)委會(huì)2013年學(xué)術(shù)交流會(huì)論文集[C];2013年

8 鄒興建;;烏江梯級(jí)水電站遠(yuǎn)程集控中心標(biāo)準(zhǔn)化管理實(shí)踐[A];梯級(jí)調(diào)度控制研究論叢——2012年學(xué)術(shù)交流論文集(下冊(cè))[C];2014年

9 王剛;;雅礱江流域集控中心監(jiān)控系統(tǒng)高級(jí)功能規(guī)劃與應(yīng)用[A];梯級(jí)調(diào)度控制研究論叢——2011年學(xué)術(shù)交流論文集[C];2011年

10 梁薇;張巧惠;鄧小剛;劉運(yùn)平;覃良辰;刑本福;楊越超;賴(lài)偉;;紅花集控中心電調(diào)自動(dòng)化系統(tǒng)應(yīng)用[A];中國(guó)水力發(fā)電工程學(xué)會(huì)信息化專(zhuān)業(yè)委員會(huì)2012年年會(huì)優(yōu)秀論文專(zhuān)集[C];2012年

相關(guān)重要報(bào)紙文章 前10條

1 通訊員 陳愛(ài)紅;臨汾供電分公司集控中心站狠抓安全生產(chǎn)不放松[N];臨汾日?qǐng)?bào);2007年

2 記者 張麗;贛東北供電公司集控中心投入試運(yùn)行[N];國(guó)家電網(wǎng)報(bào);2010年

3 姜亦云 趙耕;長(zhǎng)春超高壓局500千伏集控中心進(jìn)入模擬運(yùn)行階段[N];東北電力報(bào);2010年

4 孫立偉;500千伏長(zhǎng)春集控中心投入試運(yùn)行[N];東北電力報(bào);2010年

5 本報(bào)記者 高虹 通訊員 韓海光;為千家萬(wàn)戶(hù)守護(hù)一片光明[N];海南日?qǐng)?bào);2011年

6 劉福佳 杜長(zhǎng)寶;吉林集控中心中控室調(diào)度總機(jī)投入使用[N];東北電力報(bào);2011年

7 李洪明 皮海斌;九江電網(wǎng)建成首個(gè)縣級(jí)變電運(yùn)行集控中心[N];國(guó)家電網(wǎng)報(bào);2009年

8 記者 董愛(ài)軍;大連電網(wǎng)集控中心實(shí)現(xiàn)“全覆蓋”[N];國(guó)家電網(wǎng)報(bào);2010年

9 張琦鮮;凱里供電:走向大集控[N];中國(guó)電力報(bào);2010年

10 本報(bào)記者 王莉 通訊員 李莉;路在腳下[N];西南電力報(bào);2010年

相關(guān)碩士學(xué)位論文 前10條

1 袁偉濱;東莞供電局集控中心運(yùn)行值班模式的分析和優(yōu)化[D];華南理工大學(xué);2014年

2 孫潔;集控中心網(wǎng)絡(luò)互聯(lián)與安全防護(hù)的研究及實(shí)現(xiàn)[D];河海大學(xué);2007年

3 鄒國(guó)強(qiáng);電網(wǎng)集控中心建設(shè)與開(kāi)發(fā)應(yīng)用的研究[D];合肥工業(yè)大學(xué);2007年

4 孟杰;超高壓集控中心基建項(xiàng)目質(zhì)量控制研究[D];華北電力大學(xué);2011年

5 熊德智;500KV電網(wǎng)運(yùn)行集控中心關(guān)鍵系統(tǒng)的設(shè)計(jì)[D];長(zhǎng)沙理工大學(xué);2010年

6 李柯舟;一體化集控中心系統(tǒng)工程建設(shè)的研究和實(shí)踐[D];南昌大學(xué);2010年

7 羅海生;新能源集控中心項(xiàng)目計(jì)劃與控制研究[D];云南大學(xué);2015年

8 伍雪焱;云南瀾滄江水電集控中心通信組網(wǎng)方案研究[D];昆明理工大學(xué);2008年

9 王松林;華能西藏公司藏木等水電站遠(yuǎn)程集控工程應(yīng)用研究[D];清華大學(xué);2014年

10 崔法聚;基于集控中心的電力系統(tǒng)警報(bào)處理故障診斷研究[D];華南理工大學(xué);2012年



本文編號(hào):1910521

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1910521.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶(hù)3ed80***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com