基于模糊綜合評(píng)價(jià)法的尾礦壩穩(wěn)定性評(píng)價(jià)研究

發(fā)布時(shí)間:2018-04-27 13:21

  本文選題:尾礦壩 + 穩(wěn)定性; 參考:《東華理工大學(xué)》2014年碩士論文


【摘要】:尾礦壩作為尾礦庫(kù)系統(tǒng)中最為重要的構(gòu)筑物設(shè)施,尾礦壩的穩(wěn)定性往往決定了一個(gè)尾礦庫(kù)是否能安全運(yùn)行。一旦尾礦壩潰壩或則失效,不僅會(huì)給國(guó)家造成巨大的經(jīng)濟(jì)損失,而且還會(huì)危及尾礦庫(kù)下游地區(qū)居民的生命安全和影響尾礦庫(kù)區(qū)周邊生態(tài)環(huán)境,所以對(duì)尾礦壩的穩(wěn)定性評(píng)價(jià)進(jìn)行研究是非常有意義和價(jià)值的。本文從尾礦壩自身結(jié)構(gòu)特點(diǎn)和其外界影響因素兩個(gè)方面出發(fā),結(jié)合實(shí)際尾礦壩工程應(yīng)用,通過(guò)分析尾礦壩各類潰壩方式及其產(chǎn)生原因,確定了影響尾礦壩穩(wěn)定性的六個(gè)主要方面:初期壩、堆積壩、排洪系統(tǒng)、排滲系統(tǒng)、自然因素和管理因素,并從這六個(gè)主要方面出發(fā),進(jìn)一步分析了關(guān)于這六個(gè)方面的19個(gè)尾礦壩穩(wěn)定性評(píng)價(jià)指標(biāo),這其中包括了10個(gè)定性指標(biāo)和9個(gè)定量指標(biāo),構(gòu)建了尾礦壩穩(wěn)定性評(píng)價(jià)的評(píng)價(jià)指標(biāo)體系。借鑒邊坡和相關(guān)行業(yè)的工程穩(wěn)定性評(píng)價(jià)經(jīng)驗(yàn),并結(jié)合尾礦壩實(shí)際工程,綜合考慮多方面因素,構(gòu)建了尾礦壩穩(wěn)定性評(píng)價(jià)的評(píng)價(jià)等級(jí)集,這樣對(duì)尾礦壩的穩(wěn)定性運(yùn)行狀況有了更直觀的認(rèn)識(shí)。評(píng)價(jià)指標(biāo)體系和評(píng)價(jià)等級(jí)集共同構(gòu)成了尾礦壩穩(wěn)定性評(píng)價(jià)的評(píng)價(jià)體系。在尾礦壩穩(wěn)定性評(píng)價(jià)模型建立中,應(yīng)用層次分析法構(gòu)建了尾礦壩穩(wěn)定性評(píng)價(jià)的結(jié)構(gòu)體系,通過(guò)模糊綜合評(píng)價(jià)法和借鑒邊坡行業(yè)工程穩(wěn)定性評(píng)價(jià)已有的研究成果和經(jīng)驗(yàn),對(duì)尾礦壩穩(wěn)定性各評(píng)價(jià)指標(biāo)的相對(duì)重要度(權(quán)重)進(jìn)行確定,并以此建立了基于模糊綜合評(píng)價(jià)法的尾礦壩穩(wěn)定性評(píng)價(jià)模型。通過(guò)實(shí)際尾礦壩工程實(shí)例,以上饒713礦尾礦庫(kù)中的尾礦壩為研究對(duì)象,應(yīng)用文中所建立的基于模糊綜合評(píng)價(jià)法的尾礦壩穩(wěn)定性評(píng)價(jià)模型對(duì)該尾礦壩工程進(jìn)行穩(wěn)定性評(píng)價(jià),將評(píng)價(jià)結(jié)果與實(shí)際監(jiān)測(cè)資料對(duì)比驗(yàn)證。
[Abstract]:Tailings dam is the most important structural facility in the tailings storage system. The stability of the tailing dam often determines whether a tailings dam can operate safely or not. Once the tailings dam breaks or fails, it will not only cause huge economic losses to the country, but also endanger the lives of the residents in the downstream area of the tailings reservoir and affect the surrounding ecological environment of the tailings reservoir area. So it is very meaningful and valuable to study the stability evaluation of tailings dam. In this paper, based on the structural characteristics of tailings dam and its external influence factors, combined with the practical application of tailings dam, this paper analyzes the various types of dam break and its causes. Six main aspects affecting the stability of tailings dam are determined: initial dam, accumulative dam, flood discharge system, seepage discharge system, natural factors and management factors, and from these six main aspects, Further, 19 evaluation indexes of tailing dam stability in these six aspects are analyzed, which include 10 qualitative indexes and 9 quantitative indexes, and the evaluation index system of tailing dam stability evaluation is constructed. Based on the experience of engineering stability evaluation of slope and related industries and combined with the actual project of tailings dam, the evaluation grade set of tailing dam stability evaluation is constructed by considering many factors synthetically. In this way, there is a more intuitive understanding of the stability of the tailings dam. The evaluation index system and evaluation grade set constitute the stability evaluation system of tailings dam. In the process of establishing the stability evaluation model of tailings dam, the structural system of tailing dam stability evaluation is constructed by using the analytic hierarchy process (AHP). By using the fuzzy comprehensive evaluation method and drawing lessons from the existing research results and experience of slope engineering stability evaluation, The relative importance (weight) of each evaluation index of tailing dam stability is determined, and the stability evaluation model of tailings dam based on fuzzy comprehensive evaluation method is established. Taking the tailings dam in the tailings dam of Shangrao 713 mine as the research object, the stability evaluation model of the tailings dam based on the fuzzy comprehensive evaluation method established in this paper is used to evaluate the stability of the tailings dam project. The evaluation results are compared with the actual monitoring data.
【學(xué)位授予單位】:東華理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TV649

【參考文獻(xiàn)】

相關(guān)期刊論文 前1條

1 孫樹海;曹蘭柱;張立新;;露天礦邊坡穩(wěn)定性的模糊綜合評(píng)判[J];遼寧工程技術(shù)大學(xué)學(xué)報(bào);2007年02期



本文編號(hào):1810897

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1810897.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶3a51b***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com