中國第一水工試驗(yàn)所的成立及早期相關(guān)史實(shí)
本文選題:中國第一水工試驗(yàn)所 + 華北水利委員會 ; 參考:《中國科技史雜志》2016年03期
【摘要】:中國第一水工試驗(yàn)所是民國時(shí)期建立的第一個(gè)水利科研機(jī)構(gòu),是中國傳統(tǒng)水利轉(zhuǎn)向現(xiàn)代水利的標(biāo)志性事件之一,本文在水利科技史以及民國史上占有重要地位。以《華北水利月刊》為基本史料,對中國第一水工試驗(yàn)所籌備及成立過程進(jìn)行了系統(tǒng)梳理,對其中的關(guān)鍵事實(shí)作了考證論述。中國第一水工試驗(yàn)所創(chuàng)建經(jīng)歷了四個(gè)階段,即:河工試驗(yàn)場時(shí)期、臨時(shí)水工試驗(yàn)所時(shí)期、華北水工試驗(yàn)所時(shí)期和中國第一水工試驗(yàn)所時(shí)期。技術(shù)專家、經(jīng)費(fèi)、所址和組織機(jī)構(gòu)是影響中國第一水工試驗(yàn)所建設(shè)進(jìn)程的四個(gè)關(guān)鍵因素。中國第一水工試驗(yàn)所的建設(shè)過程,既是民國時(shí)期水利界對水工試驗(yàn)這一新事物在技術(shù)上不斷認(rèn)識深化的過程,也是民國社會對這一新事物逐漸接受的過程,反映了民國時(shí)期中西科技和文化之間的交融與碰撞。
[Abstract]:The first hydraulic testing Institute in China is the first water conservancy scientific research institution established in the Republic of China. It is one of the iconic events of the transition of Chinese traditional water conservancy to modern water conservancy. This paper plays an important role in the history of water conservancy science and technology as well as the history of the Republic of China.Taking the monthly Journal of North China Water Conservancy as the basic historical data, the preparation and establishment process of the first hydraulic Engineering Test Institute in China is systematically sorted out, and the key facts among them are discussed through textual research.The establishment of the first hydraulic testing Institute in China has undergone four stages, namely, the period of the river engineering test site, the period of the temporary hydraulic test institute, the period of the North China hydraulic testing Institute and the period of the first China hydraulic testing Institute.Technical experts, funding, location and organization are the four key factors that affect the construction process of China's first hydraulic Engineering Laboratory.The construction process of the first hydraulic test institute in China is not only the process of deepening the understanding of the new thing in the water conservancy circles during the period of the Republic of China, but also the process of gradually accepting the new thing in the society of the Republic of China.It reflects the blending and collision between Chinese and Western science and technology and culture during the period of the Republic of China.
【作者單位】: 中國水利水電科學(xué)研究院;水利部防洪抗旱減災(zāi)工程技術(shù)研究中心;
【基金】:中國水科院科研專項(xiàng)(編號:JZ0145B572016)
【分類號】:TV131.6-2
【相似文獻(xiàn)】
相關(guān)期刊論文 前8條
1 魏大衛(wèi);;中國第一水工試驗(yàn)所探源[J];河北工業(yè)大學(xué)學(xué)報(bào)(社會科學(xué)版);2013年02期
2 徐基豐;;水電部水工試驗(yàn)技術(shù)和儀器設(shè)備考察團(tuán)赴英考察[J];水利水運(yùn)科學(xué)研究;1984年03期
3 張雅峰;;某供水樞紐攔河壩布置方案優(yōu)化水工試驗(yàn)研究[J];廣東水利水電;2013年06期
4 吳建綱;水工試驗(yàn)的數(shù)字化方法初探[J];江西科學(xué);2004年05期
5 李雪;王輝;;上善若水——臺灣國立成功大學(xué)水工試驗(yàn)所所長黃煌qG教授[J];科學(xué)中國人;2006年09期
6 李長芮;《酚醛塑料模型砂》的研制——高分子材料的開發(fā)及利用[J];北京師范學(xué)院自然科學(xué)學(xué)報(bào);1987年04期
7 趙榮俊;金逸;陳渝士;;水工試驗(yàn)用固定錐型閥模型的研制與應(yīng)用[J];人民長江;2007年02期
8 ;[J];;年期
相關(guān)會議論文 前1條
1 滕淑蘭;;某工程河道截流水工試驗(yàn)研究[A];第十三屆全國水動力學(xué)研討會文集[C];1999年
,本文編號:1740852
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1740852.html