天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 水利工程論文 >

三峽水輪機(jī)座環(huán)制造跨國外包項目風(fēng)險管理

發(fā)布時間:2018-03-16 20:14

  本文選題:跨國外包 切入點(diǎn):風(fēng)險分析 出處:《哈爾濱工業(yè)大學(xué)》2014年碩士論文 論文類型:學(xué)位論文


【摘要】:工程外包是利用他人優(yōu)秀資源優(yōu)勢提高工程質(zhì)量的一種手段,但外包過程的復(fù)雜性和嚴(yán)格的技術(shù)標(biāo)準(zhǔn)使得外包工程生命周期面臨各種風(fēng)險,企業(yè)必須采取有效措施進(jìn)行外包風(fēng)險管理。本文以哈電公司的三峽電站水輪機(jī)座環(huán)跨國外包項目,進(jìn)行外包項目風(fēng)險管理論述。 首先詳細(xì)分析了三峽座環(huán)的結(jié)構(gòu)、生產(chǎn)要求等問題,結(jié)合制造特點(diǎn),選取多個待定生產(chǎn)方案,并運(yùn)用決策樹方法以確定最佳生產(chǎn)方式,在此基礎(chǔ)上配合效用函數(shù)理論分析,確定具體的工程生產(chǎn)數(shù)量、范圍等。對選定最優(yōu)的承包方式進(jìn)行相關(guān)的風(fēng)險事件分析和風(fēng)險識別,從技術(shù)風(fēng)險、進(jìn)度風(fēng)險、成本風(fēng)險、質(zhì)量風(fēng)險等方面進(jìn)行AHP層次分析法的風(fēng)險評價,再運(yùn)用計劃評審技術(shù)(PERT),結(jié)合產(chǎn)品制造工序,評測關(guān)鍵路徑風(fēng)險。 其次對風(fēng)險評價后的風(fēng)險因素排序結(jié)果,提出相關(guān)的風(fēng)險控制策略,風(fēng)險控制的方法包括監(jiān)控寫實(shí)報告、制定應(yīng)急預(yù)案等,尤其在研究座環(huán)外包制造過程控制流程的基礎(chǔ)上對專項控制措施進(jìn)行詳細(xì)規(guī)劃,并從外包風(fēng)險動態(tài)變化的角度提出外包項目風(fēng)險動態(tài)監(jiān)控方法和預(yù)警手段。同時具體對項目外包管理機(jī)構(gòu)的設(shè)置與管理進(jìn)行闡述,細(xì)化工程的管理團(tuán)隊職責(zé),并在企業(yè)中建立風(fēng)險管理數(shù)據(jù)庫,由專業(yè)管理員定期維護(hù)與更新,,降低執(zhí)行過程中的風(fēng)險。 通過全面的三峽座環(huán)外包工程風(fēng)險識別、分析、評估和控制,總結(jié)出系統(tǒng)的項目風(fēng)險管理措施,增強(qiáng)企業(yè)對風(fēng)險管理的重視。尤其座環(huán)制造的大型部件外包工程中引入風(fēng)險管理方法,以減少損失,提高效益。表明了風(fēng)險管理在該項目中發(fā)揮了重要作用。
[Abstract]:Project outsourcing is a means to improve the quality of project by utilizing the advantage of others' excellent resources. However, the complexity of outsourcing process and strict technical standards make the life cycle of outsourcing project face various risks. Enterprises must take effective measures to carry out outsourcing risk management. Firstly, the structure and production requirements of the three Gorges seat ring are analyzed in detail. According to the manufacturing characteristics, several undetermined production schemes are selected, and the decision tree method is used to determine the best mode of production. On this basis, the utility function theory is used to analyze. Determine the specific quantity and scope of project production. Analyze and identify the relevant risk events and risk identification to select the optimal contracting method, from technical risk, schedule risk, cost risk, etc. The quality risk is evaluated by AHP AHP, and then the critical path risk is evaluated by using the plan review technology and product manufacturing process. Secondly, the ranking results of risk factors after risk evaluation are put forward, and the relevant risk control strategies are put forward. The methods of risk control include monitoring realistic report, making emergency plan and so on. In particular, on the basis of studying the control process of the manufacturing process of seat ring outsourcing, the special control measures are planned in detail. From the point of view of the dynamic change of outsourcing risk, the paper puts forward the dynamic monitoring method and early warning means of outsourcing project risk. At the same time, it elaborates the setting and management of the project outsourcing management organization, and details the responsibility of the project management team. Risk management database is established in the enterprise and maintained and updated regularly by the professional administrator to reduce the risk during execution. Through the comprehensive risk identification, analysis, evaluation and control of the three Gorges Corridor Outsourcing Project, the project risk management measures of the system are summarized. In order to reduce the loss and improve the benefit, the risk management plays an important role in the project.
【學(xué)位授予單位】:哈爾濱工業(yè)大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TK730.6

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 卿姚;王月明;;我國工程項目風(fēng)險管理研究綜述[J];四川建筑科學(xué)研究;2007年02期

2 田曉軍;銀行業(yè)務(wù)外包及其對我國商業(yè)銀行經(jīng)營的啟示[J];城市金融論壇;1999年06期

3 黃磊;;海外BOT建設(shè)項目風(fēng)險管理探析[J];國際經(jīng)貿(mào)探索;2007年02期

4 郁佳敏;顧孟迪;花俊洲;;高新技術(shù)項目風(fēng)險投資保險及其風(fēng)險模型研究[J];南方金融;2012年08期

5 宰予東;劉思峰;;基于模糊分析法的企業(yè)資源外包風(fēng)險研究[J];河南社會科學(xué);2006年02期

6 何曉嵐,張亮,閆慶軍;淺談信息技術(shù)外包及其風(fēng)險管理[J];經(jīng)濟(jì)論壇;2005年19期

7 彭金鑫;;基于多米諾骨牌理論的金融風(fēng)險傳導(dǎo)機(jī)制研究[J];科技創(chuàng)業(yè)月刊;2009年09期

8 汪小金;木建忠;;對外承包水電站建設(shè)項目的風(fēng)險管理規(guī)劃研究[J];水力發(fā)電;2009年07期

9 王勇飛;魏愛臣;王善武;;深溪溝水電站安全生產(chǎn)管理模式[J];四川水力發(fā)電;2008年01期

10 周勇;論現(xiàn)代企業(yè)業(yè)務(wù)外包的內(nèi)涵、功效及管理策略[J];武漢科技大學(xué)學(xué)報(社會科學(xué)版);2003年01期



本文編號:1621503

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1621503.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶65af9***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com