水力吹填期間新建圍堰穩(wěn)定性能研究及應(yīng)用
發(fā)布時間:2018-03-13 07:50
本文選題:圍堰 切入點:水力吹填 出處:《施工技術(shù)》2017年20期 論文類型:期刊論文
【摘要】:結(jié)合珠海金灣某工程案例,針對圍堰反壓平臺方案進(jìn)行施工優(yōu)化。通過模擬現(xiàn)場吹填施工,根據(jù)穩(wěn)定驗算得出了反壓平臺施工具體參數(shù)。工程實踐表明,圍堰結(jié)構(gòu)在工程使用期內(nèi)經(jīng)歷了歷次強(qiáng)降雨等惡劣天氣的襲擊,并始終保持穩(wěn)定,保證了真空預(yù)壓的實施。
[Abstract]:Combined with a case of a project in Jinwan, Zhuhai, the construction optimization of cofferdam backpressure platform is carried out. By simulating the site filling construction, the concrete parameters of the backpressure platform construction are obtained according to the stability checking calculation. The engineering practice shows that the concrete construction parameters of the backpressure platform are obtained. The cofferdam structure has experienced several severe weather attacks such as heavy rainfall during the working life of the project, and it is always stable, which ensures the implementation of vacuum preloading.
【作者單位】: 中交四航工程研究院有限公司;廣東中禹港航工程有限公司;
【分類號】:U655.541
【相似文獻(xiàn)】
中國期刊全文數(shù)據(jù)庫 前10條
1 李蓓;疏浚土吹填泥沙輸移擴(kuò)散數(shù)值模擬研究及應(yīng)用[J];中國港灣建設(shè);2003年02期
2 張志卿;;廈門港海滄港區(qū)疏浚及吹填造地施工質(zhì)量控制[J];沿海企業(yè)與科技;2009年06期
3 應(yīng)杰;張立成;;吹填施工精細(xì)化管理探析[J];科技資訊;2012年22期
4 王,
本文編號:1605479
本文鏈接:http://www.sikaile.net/kejilunwen/shuiwenshuili/1605479.html
最近更新
教材專著