天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 科技論文 > 施工技術(shù)論文 >

超高超大懸挑結(jié)構(gòu)健康監(jiān)測研究

發(fā)布時(shí)間:2019-03-13 17:49
【摘要】:隨著社會的進(jìn)步、科技的發(fā)展、國民經(jīng)濟(jì)的不斷提高,大型復(fù)雜結(jié)構(gòu)建筑的出現(xiàn)已成為必然的趨勢,但因?yàn)槭┕み^程中、運(yùn)營期間的種種因素的影響,這些大型復(fù)雜結(jié)構(gòu)在施工、運(yùn)營中發(fā)生安全事故的機(jī)率相對較高,如何的減少這類事故的發(fā)生,提前發(fā)出警報(bào)信息,做到提前準(zhǔn)備,,確保施工順利進(jìn)行,確保結(jié)構(gòu)安全使用,結(jié)構(gòu)健康監(jiān)測顯得尤為重要。 本文以合肥市渡江戰(zhàn)役紀(jì)念館這樣一個(gè)超高超大懸挑的大型復(fù)雜結(jié)構(gòu)為例,首先介紹了結(jié)構(gòu)健康監(jiān)測的必要性、監(jiān)測的方法為后面的研究提供了依據(jù)。緊接著本文論述了渡江戰(zhàn)役紀(jì)念館在施工過程中高支撐架體及其懸挑結(jié)構(gòu)的數(shù)值模擬,用ANSYS有限元正裝分析法,模擬得出施工過程中懸挑結(jié)構(gòu)高支撐架體及結(jié)構(gòu)本身的關(guān)鍵部位和危險(xiǎn)部位,為后面的現(xiàn)場健康監(jiān)測提供了依據(jù)。接下來本文詳細(xì)論述了渡江戰(zhàn)役紀(jì)念館主體懸挑結(jié)構(gòu)在施工過程中高支撐架體及其模板的健康監(jiān)測系統(tǒng),并將現(xiàn)場健康監(jiān)測結(jié)果與數(shù)值模擬結(jié)果進(jìn)行對比分析,及時(shí)提供信息保證懸挑結(jié)構(gòu)施工的安全、順利的進(jìn)行,同時(shí)也為今后類似的結(jié)構(gòu)施工提供了相關(guān)經(jīng)驗(yàn)。最后就戰(zhàn)役紀(jì)念館主體懸挑結(jié)構(gòu)在施工過程中的關(guān)鍵性施工技術(shù)進(jìn)行了介紹,為保證其施工關(guān)鍵技術(shù)得以實(shí)施,施工健康監(jiān)測是一項(xiàng)不可缺少的技術(shù)措施。
[Abstract]:With the progress of society, the development of science and technology, the continuous improvement of national economy, the emergence of large and complex structural buildings has become an inevitable trend, but because of the influence of various factors during the construction process, during operation, In the construction and operation of these large and complex structures, the probability of safety accidents is relatively high. How to reduce the occurrence of such accidents, issue warning information in advance, prepare ahead of time, ensure smooth construction, and ensure the safe use of the structure, Structural health monitoring is particularly important. Taking Hefei Dujiang campaign Memorial Hall as an example, this paper first introduces the necessity of structural health monitoring, and the monitoring method provides a basis for further research. Then, this paper discusses the numerical simulation of the elevated support and its overhanging structure in the construction process of the Memorial Hall of the Battle of the Cross River, using the ANSYS finite element orthographic analysis method. The simulation results show that the high brace and the key and dangerous parts of the structure itself in the construction process provide the basis for the on-the-spot health monitoring of the cantilever structure. Next, this paper discusses in detail the health monitoring system of the high support and its formwork in the construction process of the main overhanging structure of the Memorial Hall of the Battle of the Dujiang River, and compares the results of the on-site health monitoring with the results of numerical simulation. To provide timely information to ensure the safety and smooth construction of overhanging structure, and to provide relevant experience for similar structure construction in the future. Finally, the key construction techniques of the main overhanging structure of the campaign memorial are introduced. In order to ensure the implementation of the key construction techniques, the construction health monitoring is an indispensable technical measure.
【學(xué)位授予單位】:安徽建筑大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU317

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 閔玉忠;何夕平;陳東;廖振修;;渡江戰(zhàn)役紀(jì)念館施工監(jiān)測方案的設(shè)計(jì)與優(yōu)化[J];安徽建筑工業(yè)學(xué)院學(xué)報(bào)(自然科學(xué)版);2011年01期

2 白泰禮,何羚,王彩云,鄧鐵六;基于振弦式傳感器的多功能智能檢測儀[J];傳感器技術(shù);2004年03期

3 張心斌,紀(jì)強(qiáng),張莉;振弦式應(yīng)變傳感器特性研究[J];傳感器世界;2003年08期

4 崔旭升;李法理;麻德明;周少平;;基于全站儀交會的變形監(jiān)測方法的應(yīng)用研究[J];測繪工程;2007年05期

5 高贊明,孫宗光,倪一清;基于振動(dòng)方法的汲水門大橋損傷檢測研究[J];地震工程與工程振動(dòng);2001年S1期

6 李宏男,李東升;土木工程結(jié)構(gòu)安全性評估、健康監(jiān)測及診斷述評[J];地震工程與工程振動(dòng);2002年03期

7 姚志遠(yuǎn),汪鳳泉;基于連續(xù)模型的大型結(jié)構(gòu)模態(tài)參數(shù)識別[J];東南大學(xué)學(xué)報(bào)(自然科學(xué)版);2003年05期

8 徐勁;鄧浩;盛國賽;黃達(dá);章丹峰;;某超高層建筑施工中若干監(jiān)測技術(shù)研究與應(yīng)用[J];廣東土木與建筑;2009年08期

9 廖曉坤;;渡江戰(zhàn)役紀(jì)念館高支撐體系設(shè)計(jì)[J];工程與建設(shè);2010年03期

10 楊愛玉;丁克偉;;渡江戰(zhàn)役紀(jì)念館主體結(jié)構(gòu)安全性分析[J];工程與建設(shè);2012年01期

相關(guān)博士學(xué)位論文 前2條

1 刁延松;基于神經(jīng)網(wǎng)絡(luò)和小波分析的海洋平臺結(jié)構(gòu)損傷檢測研究[D];中國海洋大學(xué);2006年

2 張慎偉;大型鋼結(jié)構(gòu)施工過程計(jì)算理論與監(jiān)測技術(shù)[D];同濟(jì)大學(xué);2007年

相關(guān)碩士學(xué)位論文 前2條

1 葉芳芳;大懸挑懸掛混合結(jié)構(gòu)的施工控制[D];中南大學(xué);2009年

2 楊愛玉;大跨度懸挑桁架結(jié)構(gòu)的施工監(jiān)測與應(yīng)用分析[D];安徽建筑工業(yè)學(xué)院;2012年



本文編號:2439620

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/2439620.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶24cd0***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com