某高校住宅樓項目全過程造價控制方法的研究
發(fā)布時間:2018-03-22 15:13
本文選題:全過程 切入點:造價控制 出處:《南京理工大學(xué)》2013年碩士論文 論文類型:學(xué)位論文
【摘要】:長期以來,國內(nèi)工程造價的全過程(投資估算,設(shè)計概算、施工圖預(yù)算,合同價、工程結(jié)算等階段)由投資部門、設(shè)計部門、實施部門分別負責(zé)。這就意味著將其為分割在各個部門和系統(tǒng)進行控制,沒有一個獨立的費用控制的責(zé)任主體地位,缺乏費用控制的方法和應(yīng)用,這是難以控制工程項目成本的主要原因。本文分析了國內(nèi)外工程造價控制理論的研究現(xiàn)狀,然后在總結(jié)了國內(nèi)外現(xiàn)有工程造價的確定與控制方法以及實踐經(jīng)驗的基礎(chǔ)上,以三門峽某高校的住宅建設(shè)項目為研究對象進行全過程造價控制方法的研究。從業(yè)主(項目法人)的角度出發(fā),針對建設(shè)項目在投資決策、設(shè)計、招投標(biāo)、施工和結(jié)算等不同階段的特點,結(jié)合投資估算指標(biāo)、價值工程分析、限額設(shè)計、清單計價招投標(biāo)、贏得值、竣工結(jié)算審計等造價控制方法,在工程實踐的各個階段進行分析和應(yīng)用,并對應(yīng)用的效果進行了對比分析。在整個建設(shè)項目的全過程實現(xiàn)了設(shè)計概算不超投資估算、施工圖預(yù)算不超設(shè)計概算、竣工結(jié)算不超施工圖預(yù)算的“三不超”目標(biāo),為學(xué)校教工住戶謀取了利益的最大化。通過本文的研究成果期望對高校基本建設(shè)過程中的造價控制工作提供一定的理論指導(dǎo)和實踐參考。
[Abstract]:For a long time, the whole process of domestic project cost (investment estimation, design budget, construction budget, contract price, settlement and other stage) by the investment department, design department, the departments responsible for the implementation. This means that the division of the control in each department and system, not an independent cost control the main responsibility of the position, the lack of method and application of cost control, this is the main reason to control the cost of the project. This paper analyzes the research status of domestic and international project cost control theory, and then summarizes the existing domestic and foreign engineering cost determination and control methods and practical experience, in the residential construction project of a university Sanmenxia for the study of cost control of the whole process. From the owner (project legal) point of view, according to the project in the investment decision-making, design, bidding, construction and Such as the characteristics of different stages, combined with the investment estimation index, quota design analysis, value engineering, inventory valuation bidding, earned value cost control method, completion settlement audit, analysis and application in each stage of engineering practice, and the application results are compared and analyzed. In the whole process of construction project implementation the design estimate does not exceed the investment estimate, construction budget does not exceed the design budget, completion settlement does not exceed the construction drawing budget "three super" target, to seek maximum benefits for the school staff by households. The research results of this paper is expected to provide some theoretical guidance and practical reference for cost control process of capital construction in Colleges and universities in.
【學(xué)位授予單位】:南京理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU241;TU723.3
【參考文獻】
相關(guān)期刊論文 前10條
1 陳涵萍;;探討工程造價管理全過程控制[J];福建建設(shè)科技;2006年04期
2 朱全秀;;淺談建設(shè)工程造價全過程控制[J];消費導(dǎo)刊;2007年13期
3 張獻萍;張義忠;;建筑設(shè)計階段控制工程造價的策略與方法[J];河南大學(xué)學(xué)報(自然科學(xué)版);2009年06期
4 陳建華;;關(guān)于工程造價在設(shè)計階段的探討[J];建材與裝飾(下旬刊);2007年07期
5 曹琳;李軍忠;郭維東;;建設(shè)項目投資決策階段的工程造價管理[J];建設(shè)監(jiān)理;2010年03期
6 劉援朝;工程建設(shè)項目管理的體驗[J];建筑經(jīng)濟;2003年06期
7 夏憲成;姜吉坤;;建設(shè)項目全過程造價控制措施探討[J];建筑經(jīng)濟;2008年S1期
8 馬春超;;控制工程造價要從設(shè)計入手[J];建筑市場與招標(biāo)投標(biāo);2006年02期
9 霍新喜;;建筑工程造價中的設(shè)計變更和工程簽證管理[J];山西建筑;2007年17期
10 黃東云;;試論工程建設(shè)全過程的造價管理[J];科技信息(科學(xué)教研);2007年23期
,本文編號:1649200
本文鏈接:http://www.sikaile.net/kejilunwen/sgjslw/1649200.html
最近更新
教材專著