【摘要】:本文研究的目標是為龍固礦2301工作面完成主要設備的選型,并檢驗其是否滿足生產(chǎn)的要求。首先在完成工作面資源賦存條件調(diào)查的基礎上利用煤巖力學參數(shù)實驗、數(shù)值模擬以及數(shù)值計算等方法確定工作面的割煤高度;其次在按照工作面主要設備選型原則的基礎上利用數(shù)值計算等綜合方法得出了工作面主要設備的技術參數(shù);再次是結合對相關煤礦的調(diào)研總結出千萬噸級的綜放工作面對于工作面主要設備的要求,然后利用工程類比的方法選出符合要求的配套方案;在得到配套方案之后則需要利用層次分析法對配套方案進行優(yōu)化選擇;最后通過現(xiàn)場實測檢驗工作面的主要設備在實際生產(chǎn)中的適應性并總結其存在的問題。本次設備的選型一方面幫助實現(xiàn)礦井的安全高產(chǎn)高效高集約化生產(chǎn)另一方面也可以為其他礦井的設備選型提供參考依據(jù)。
[Abstract]:The aim of this paper is to complete the selection of main equipment for 2301 working face of Longgu Mine, and to check whether it can meet the requirements of production. Firstly, the coal cutting height is determined by means of coal mechanics parameter experiment, numerical simulation and numerical calculation on the basis of the investigation of working face resource occurrence condition. Secondly, on the basis of the principle of selecting the main equipment in the working face, the technical parameters of the main equipment in the working face are obtained by means of numerical calculation and other comprehensive methods. Thirdly, combined with the investigation of the relevant coal mines, the requirements of the main equipment of the fully mechanized top-coal caving face of ten million tons are summarized, and then the matching scheme which meets the requirements is selected by the method of engineering analogy. After obtaining the matching scheme, it is necessary to use the analytic hierarchy process (AHP) to optimize the selection of the matching scheme. Finally, the adaptability of the main equipment of the working face in actual production is tested by field measurement and the existing problems are summarized. On the one hand, this equipment selection can help to realize the safety, high yield, high efficiency and intensive production of mine, on the other hand, it can also provide reference basis for other mine equipment selection.
【學位授予單位】:安徽理工大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TD323
本文編號:2456629
[Abstract]:The aim of this paper is to complete the selection of main equipment for 2301 working face of Longgu Mine, and to check whether it can meet the requirements of production. Firstly, the coal cutting height is determined by means of coal mechanics parameter experiment, numerical simulation and numerical calculation on the basis of the investigation of working face resource occurrence condition. Secondly, on the basis of the principle of selecting the main equipment in the working face, the technical parameters of the main equipment in the working face are obtained by means of numerical calculation and other comprehensive methods. Thirdly, combined with the investigation of the relevant coal mines, the requirements of the main equipment of the fully mechanized top-coal caving face of ten million tons are summarized, and then the matching scheme which meets the requirements is selected by the method of engineering analogy. After obtaining the matching scheme, it is necessary to use the analytic hierarchy process (AHP) to optimize the selection of the matching scheme. Finally, the adaptability of the main equipment of the working face in actual production is tested by field measurement and the existing problems are summarized. On the one hand, this equipment selection can help to realize the safety, high yield, high efficiency and intensive production of mine, on the other hand, it can also provide reference basis for other mine equipment selection.
【學位授予單位】:安徽理工大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TD323
【參考文獻】
相關期刊論文 前10條
1 文成日;耿祥義;;層次分析法在購車決策中的應用[J];電腦知識與技術;2009年30期
2 賈喜榮,翟英達;采場薄板礦壓理論與實踐綜述[J];礦山壓力與頂板管理;1999年Z1期
3 唐曉玲,葉明亮;薄煤層堅硬頂板的薄板理論分析及來壓預報[J];礦山壓力與頂板管理;2003年02期
4 丁斌;邢士軍;馬俊鵬;謝強珍;;超長綜放面礦壓規(guī)律與支架適應性分析[J];礦山壓力與頂板管理;2005年04期
5 繆協(xié)興,,錢鳴高;采場圍巖整體結構與砌體梁力學模型[J];礦山壓力與頂板管理;1995年Z1期
6 康立勛;DIFFERENT ROOF BEHAVIOUR UNDER DIFFERENT UPPER MINING BOUNDARY CONDITION IN DATONG[J];Journal of Coal Science & Engineering(China);1997年02期
7 成運濤;;寺河礦6.2m大采高綜采設備選型[J];煤;2008年02期
8 葛亞兵;;大采高綜采面回采巷道支護技術[J];煤;2011年12期
9 胡省三,成玉琪;集約化是煤礦現(xiàn)代化的發(fā)展趨勢[J];煤礦機電;2004年05期
10 張佳偉;綜采設備的配套關系及采煤機技術參數(shù)的選擇[J];煤礦機械;2000年03期
本文編號:2456629
本文鏈接:http://www.sikaile.net/kejilunwen/kuangye/2456629.html
最近更新
教材專著