基于迭代學(xué)習(xí)的火電單元機(jī)組協(xié)調(diào)控制研究
[Abstract]:Thermal power unit is composed of boiler, steam turbine and generator. It is a typical thermal object, which has the characteristics of large delay, strong coupling, multiple input and multiple output. Because the dynamic performance of the unit is affected by many factors, such as physical structure attributes, operation mode and working conditions, external environment and so on, it is difficult to establish an accurate mathematical model, and the model-based controller is difficult to achieve satisfactory control effect. In this paper, a large number of on-line operation data of unit units are used to study the coordinated control of units and units in thermal power plants by using iterative learning control theory without the need to establish its accurate mathematical model. First of all, on the basis of the analysis and research of the coordinated control scheme of the unit at home and abroad. The law and repeatability of coordinated control and data variation of various working conditions in the operation process of unit units are analyzed, and the coordinated control algorithm of unit units is studied by using iterative learning control theory. The main contents are as follows: 1) the dynamic model is established for the unit, and the deviation linearization method is used to linearize the unit. 2) the iterative learning controller of the unit is designed, and the convergence of the control system based on compression mapping method is analyzed theoretically. 3) in view of the incomplete repetition of the initial conditions in the actual process of the unit, an improved iterative learning controller is designed, and the control algorithm is given theoretically and the convergence analysis is carried out. 4) the proposed algorithm is verified by MATLAB/SIMULINK simulation platform. The results show that the iterative learning control can effectively make use of the repetitive information of the unit and realize the high precision coordinated control in the limited time.
【學(xué)位授予單位】:河南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TM621
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 易元;法國(guó)600兆瓦單元機(jī)組電站的運(yùn)行經(jīng)驗(yàn)[J];電力技術(shù)通訊;1977年S1期
2 ;某發(fā)電廠300兆瓦單元機(jī)組的大修[J];電力技術(shù)通訊;1977年03期
3 陳代;;西德600兆瓦單元機(jī)組電站運(yùn)行初期情況[J];電力技術(shù)通訊;1977年S2期
4 沈炯,金林,陳來(lái)九;火電單元機(jī)組負(fù)荷最優(yōu)預(yù)見(jiàn)控制系統(tǒng)仿真研究[J];中國(guó)電機(jī)工程學(xué)報(bào);1999年03期
5 吳畏;;高壓閥門[J];電力技術(shù)通訊;1977年S2期
6 周傳心;韓忠旭;;基于數(shù)學(xué)模型的單元機(jī)組特性分析[J];電網(wǎng)技術(shù);2008年S2期
7 佟鵬;王玉清;于國(guó)強(qiáng);;“單元機(jī)組運(yùn)行”課程的試題庫(kù)改革[J];中國(guó)電力教育;2009年04期
8 朱泰;伊爾欣克發(fā)電廠的單元機(jī)組的燃油經(jīng)驗(yàn)[J];電力技術(shù)通訊;1977年01期
9 高本剛;;也談單元機(jī)組的協(xié)調(diào)控制[J];華東電力;1982年07期
10 王書(shū)傲,談越明,葉炯;空調(diào)客車小型單元機(jī)組性能測(cè)試裝置——量熱計(jì)試驗(yàn)臺(tái)[J];鐵道車輛;1993年09期
相關(guān)會(huì)議論文 前10條
1 成志剛;;單元機(jī)組負(fù)荷自動(dòng)控制系統(tǒng)控制策略分析[A];全國(guó)火電200MW級(jí)機(jī)組技術(shù)協(xié)作會(huì)第二十三屆年會(huì)論文集[C];2005年
2 楚彥君;焦邵華;;基于現(xiàn)場(chǎng)總線技術(shù)的發(fā)電廠單元機(jī)組控制系統(tǒng)研究[A];2012電站自動(dòng)化信息化學(xué)術(shù)和技術(shù)交流會(huì)議論文集[C];2012年
3 于希寧;管志敏;魏文超;;逆奈奎斯特陣列法在單元機(jī)組負(fù)荷控制系統(tǒng)中的應(yīng)用研究[A];'2006系統(tǒng)仿真技術(shù)及其應(yīng)用學(xué)術(shù)交流會(huì)論文集[C];2006年
4 劉磊;凌呼君;;基于模型誤差校正的CGPC在單元機(jī)組中的應(yīng)用[A];2007中國(guó)控制與決策學(xué)術(shù)年會(huì)論文集[C];2007年
5 李振偉;;300MW單元機(jī)組協(xié)調(diào)及子系統(tǒng)優(yōu)化[A];全國(guó)火電大機(jī)組(300MW級(jí))競(jìng)賽第37屆年會(huì)論文集[C];2008年
6 王印松;田瑞麗;呂麗霞;;基于自適應(yīng)“反步”法的火電廠單元機(jī)組協(xié)調(diào)控制[A];第二十六屆中國(guó)控制會(huì)議論文集[C];2007年
7 潘立鑫;凌呼君;曹永軍;;廣義預(yù)測(cè)自校正解耦控制在火電廠單元機(jī)組中的研究[A];2006中國(guó)控制與決策學(xué)術(shù)年會(huì)論文集[C];2006年
8 吳靈;歷偉;許君華;;火力發(fā)電廠單元機(jī)組給水全程控制系統(tǒng)淺析[A];2006中國(guó)電工技術(shù)學(xué)會(huì)電力電子學(xué)會(huì)第十屆學(xué)術(shù)年會(huì)論文摘要集[C];2006年
9 劉雪梅;;DEH系統(tǒng)在55MW單元機(jī)組中的運(yùn)用[A];2008全國(guó)第十三屆自動(dòng)化應(yīng)用技術(shù)學(xué)術(shù)交流會(huì)論文集[C];2008年
10 凌呼君;;火電廠大型單元機(jī)組過(guò)熱器大滯后系統(tǒng)的內(nèi)模預(yù)測(cè)魯棒控制[A];2001年中國(guó)智能自動(dòng)化會(huì)議論文集(上冊(cè))[C];2001年
相關(guān)博士學(xué)位論文 前3條
1 ZAIN ZAHRAN(簡(jiǎn));現(xiàn)代啟發(fā)式優(yōu)化方法研究及其在單元機(jī)組協(xié)調(diào)控制中的應(yīng)用[D];華北電力大學(xué);2014年
2 田亮;單元機(jī)組非線性動(dòng)態(tài)模型的研究[D];華北電力大學(xué)(河北);2005年
3 王慶利;先進(jìn)控制策略在單元機(jī)組協(xié)調(diào)控制系統(tǒng)中的應(yīng)用研究[D];東北大學(xué);2008年
相關(guān)碩士學(xué)位論文 前10條
1 耿沖;基于迭代學(xué)習(xí)的火電單元機(jī)組協(xié)調(diào)控制研究[D];河南理工大學(xué);2015年
2 鄧莎;660MW單元機(jī)組綜合控制系統(tǒng)研究[D];長(zhǎng)沙理工大學(xué);2011年
3 張玉恒;基于神經(jīng)網(wǎng)絡(luò)逆系統(tǒng)的單元機(jī)組協(xié)調(diào)控制研究[D];東北電力大學(xué);2010年
4 任棟;單元機(jī)組協(xié)調(diào)控制研究[D];東北電力大學(xué);2008年
5 謝剛;單元機(jī)組智能協(xié)調(diào)控制系統(tǒng)策略研究[D];太原理工大學(xué);2002年
6 徐小方;單元機(jī)組模糊多模型協(xié)調(diào)控制研究[D];蘭州理工大學(xué);2008年
7 楊荻;基于廣義預(yù)測(cè)控制的超臨界參數(shù)單元機(jī)組負(fù)荷控制與優(yōu)化研究[D];浙江大學(xué);2012年
8 李立;300MW單元機(jī)組控制對(duì)象建模及控制算法研究[D];華北電力大學(xué);2011年
9 潘立鑫;火電廠單元機(jī)組廣義預(yù)測(cè)自校正解耦控制的研究[D];內(nèi)蒙古工業(yè)大學(xué);2006年
10 王改甫;熱電廠回水加熱系統(tǒng)建模及單元機(jī)組協(xié)調(diào)智能控制的研究[D];西安建筑科技大學(xué);2005年
,本文編號(hào):2488413
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/2488413.html