多風(fēng)電場與梯級水電站協(xié)調(diào)運行對電力系統(tǒng)可靠性的影響
發(fā)布時間:2019-05-18 06:05
【摘要】:目前關(guān)于多風(fēng)電場與梯級水電站協(xié)調(diào)運行對電力系統(tǒng)可靠性影響的研究較少,為此提出了一種評估大規(guī)模風(fēng)電場接入含有梯級水電站的電力系統(tǒng)的可靠性的方法。該方法較準(zhǔn)確地建立了風(fēng)電場、梯級水電站的出力模型,充分考慮了多個風(fēng)電場之間的相關(guān)性和梯級水電站來水徑流的不確定性,并建立了基于拉丁超立方采樣的序貫蒙特卡羅可靠性模型,可用于評估可再生能源的利用率和系統(tǒng)的長期可靠性。通過將風(fēng)電-水電協(xié)調(diào)運行模式下的可靠性與風(fēng)電、水電獨立運行模式下的可靠性進(jìn)行對比,驗證了前者的優(yōu)越性。最后將上述方法應(yīng)用于測評西北直調(diào)電網(wǎng)中風(fēng)-水-火協(xié)調(diào)運行和各自獨立運行對系統(tǒng)可靠性的影響,結(jié)果表明協(xié)調(diào)運行可大幅度提高系統(tǒng)的可靠性,同時也驗證了所提模型和方法的合理性。
[Abstract]:At present, there is little research on the influence of coordinated operation of multi-wind farms and cascade hydropower stations on the reliability of power system. Therefore, a method to evaluate the reliability of large-scale wind farms connected to power systems with cascade hydropower stations is proposed. The output model of wind farm and cascade hydropower station is established accurately by this method, and the correlation between several wind farms and the uncertainty of incoming water runoff of cascade hydropower station are fully considered. A sequential Monte Carlo reliability model based on Latin hypercubic sampling is established, which can be used to evaluate the utilization rate of renewable energy and the long-term reliability of the system. By comparing the reliability of wind power-hydropower coordinated operation mode with that of wind power and hydropower independent operation mode, the superiority of the former is verified. Finally, the above methods are applied to evaluate the influence of stroke-water-fire coordinated operation and their independent operation on the reliability of the system. The results show that the coordinated operation can greatly improve the reliability of the system. At the same time, the rationality of the proposed model and method is verified.
【作者單位】: 中國電力科學(xué)研究院;國網(wǎng)冀北電力有限公司電力科學(xué)研究院;
【基金】:國家863高技術(shù)基金項目(2011AA05A103) 國家電網(wǎng)公司千人計劃專項支持項目(CEPRI:XT71-12-028)~~
【分類號】:TV737;TM614;TM732
[Abstract]:At present, there is little research on the influence of coordinated operation of multi-wind farms and cascade hydropower stations on the reliability of power system. Therefore, a method to evaluate the reliability of large-scale wind farms connected to power systems with cascade hydropower stations is proposed. The output model of wind farm and cascade hydropower station is established accurately by this method, and the correlation between several wind farms and the uncertainty of incoming water runoff of cascade hydropower station are fully considered. A sequential Monte Carlo reliability model based on Latin hypercubic sampling is established, which can be used to evaluate the utilization rate of renewable energy and the long-term reliability of the system. By comparing the reliability of wind power-hydropower coordinated operation mode with that of wind power and hydropower independent operation mode, the superiority of the former is verified. Finally, the above methods are applied to evaluate the influence of stroke-water-fire coordinated operation and their independent operation on the reliability of the system. The results show that the coordinated operation can greatly improve the reliability of the system. At the same time, the rationality of the proposed model and method is verified.
【作者單位】: 中國電力科學(xué)研究院;國網(wǎng)冀北電力有限公司電力科學(xué)研究院;
【基金】:國家863高技術(shù)基金項目(2011AA05A103) 國家電網(wǎng)公司千人計劃專項支持項目(CEPRI:XT71-12-028)~~
【分類號】:TV737;TM614;TM732
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 吳義純,丁明,李生虎;風(fēng)電場對發(fā)輸電系統(tǒng)可靠性影響的評估[J];電工技術(shù)學(xué)報;2004年11期
2 于晗;鐘志勇;黃杰波;張建華;;采用拉丁超立方采樣的電力系統(tǒng)概率潮流計算方法[J];電力系統(tǒng)自動化;2009年21期
3 丁明,張靜,李生虎;基于序貫蒙特卡羅仿真的配電網(wǎng)可靠性評估模型[J];電網(wǎng)技術(shù);2004年03期
4 衣立東;朱敏奕;魏磊;姜寧;于廣亮;;風(fēng)電并網(wǎng)后西北電網(wǎng)調(diào)峰能力的計算方法[J];電網(wǎng)技術(shù);2010年02期
5 秦志龍;李文沅;熊小伏;;考慮風(fēng)速相關(guān)性的發(fā)輸電系統(tǒng)可靠性評估[J];電力系統(tǒng)自動化;2013年16期
6 曲,
本文編號:2479746
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/2479746.html
最近更新
教材專著