核電站風管放射性氣體活度數(shù)字監(jiān)測系統(tǒng)設(shè)計
[Abstract]:At present, the domestic nuclear power plant air duct radioactive gas activity monitoring system basically uses the foreign mature product, it is necessary to carry on the independent development to it. The system design starts with the system design requirements and main technical specifications, and mainly develops the design of hardware (including signal input and output interface, PLC module and HMI etc.) and software (software platform, state parameter monitoring unit flow, etc.). At the same time, the performance test and related issues are discussed. The results show that the self-developed air duct monitoring system for nuclear power plants is of the same level as foreign mature products, and the system has high reliability, high stability and strong system interface capability, which can be applied to the demand of various nuclear power plants.
【作者單位】: 中科華核電技術(shù)研究院;
【分類號】:TM623;TP274
【相似文獻】
相關(guān)期刊論文 前10條
1 ;特靈空調(diào)引進風管清潔新裝置[J];清洗世界;2004年05期
2 李先瑞;空調(diào)風管的管理[J];中國建設(shè)信息.供熱制冷?;2004年01期
3 張潔 ,張永;小型風管機的設(shè)計與安裝[J];建筑工人;2005年01期
4 戴振強;;潔凈系統(tǒng)風管安裝的幾個問題[J];制冷;2005年03期
5 張奇?zhèn)?;淺談共板法蘭風管的應(yīng)用[J];施工技術(shù);2012年S1期
6 ;螺旋縫圓風管新工藝[J];建筑技術(shù)通訊(暖通空調(diào));1978年04期
7 薛澤惠;;風管構(gòu)造的改進及其效益[J];建筑技術(shù)通訊(暖通空調(diào));1989年02期
8 劉建仁;無襯塊耐磨技術(shù)在除塵風管中的應(yīng)用[J];通風除塵;1994年02期
9 辛魁;;風管機系統(tǒng)設(shè)計中的問題與對策[J];中外企業(yè)家;2014年06期
10 邸玉峰;潔凈系統(tǒng)風管制作工藝簡介[J];潔凈與空調(diào)技術(shù);2002年03期
相關(guān)會議論文 前10條
1 張斌;鄒祥春;;酚醛風管的性能優(yōu)勢與施工工藝探討[A];全國暖通空調(diào)制冷2010年學術(shù)年會資料集[C];2010年
2 ;復(fù)合玻纖風管施工工藝[A];2011全國壓力容器壓力管道技術(shù)發(fā)展與使用暨新技術(shù)新產(chǎn)品交流會論文集[C];2011年
3 顧正輝;;超級風管制作安裝方法探討[A];全國暖通空調(diào)制冷2000年學術(shù)年會資料集[C];2000年
4 薛q,
本文編號:2406845
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/2406845.html