越南廣寧火電國際工程項目的風險分析及對策
[Abstract]:The international thermal power project is a high-risk project, which is mainly reflected in the uncertainty and the risk that may affect the realization of the profit goal of the project when the company contracts a large international project independently or in the form of a consortium. Shanghai Electric Group is a joint venture between multinational companies and domestic enterprises. It has the technical and management requirements of some international engineering projects. However, the Shanghai Electric Group was initially established for customers in the domestic electricity market. Most of them are Chinese employees, and they begin to focus only on factory manufacturing. They lack the ability to set up international engineering project risk management mechanism and knowledge system in terms of the overall process and operation of the project. At present, Shanghai Electric Group still lacks the awareness of risk management and professional personnel, and can not effectively identify, analyze, and formulate corresponding measures for project risk management. Project risk management only depends on the experience and awareness of project personnel. Due to the lack of professional risk management, there are serious deviations in some project areas, and the implementation of the project is greatly affected, which delays the progress of the project and results in the project funding exceeding the budget. Therefore, how to manage the project risk is a major problem. On the basis of modern risk management theory, according to the characteristics of international thermal power station project, this paper analyzes the risk source of Guangning project, and puts forward a method of risk analysis, qualitative and quantitative evaluation suitable for Guangning thermal power station project. At the same time, this paper makes a detailed analysis of the typical risks and preventive measures of thermal power plant projects, and applies the fuzzy comprehensive assessment method to risk analysis and demonstration, combined with the project risk case of Vietnam. In addition, this article has carried on the preliminary discussion and the analysis to the consummation systematic risk management mechanism. Only by grasping the characteristics of risk and actively using systematic management means or tools can risk management be carried out effectively. Risk management should create value, which is the most basic principle of risk management. The main purpose of this paper is to integrate this value concept into risk management activities.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TM621
【相似文獻】
相關(guān)期刊論文 前10條
1 鐘凡;國際工程項目質(zhì)量保證體系[J];石油企業(yè)管理;1999年09期
2 白均生;一例國際工程項目營運失敗的成因與警示[J];建筑經(jīng)濟;2004年11期
3 劉玉峰;;國際工程項目組內(nèi)部矛盾和沖突的成因與對策[J];國際經(jīng)濟合作;2006年07期
4 王為林;;國際工程項目爭端的產(chǎn)生及解決方式評析[J];建筑經(jīng)濟;2007年08期
5 劉平;;淺談國際工程項目的保險[J];山西建筑;2007年31期
6 劉進;葛燕鋒;;國際工程項目投資風險管理[J];建筑技術(shù)開發(fā);2008年09期
7 劉進;葛燕鋒;;國際工程項目投資風險管理[J];建設(shè)監(jiān)理;2008年06期
8 宮孟飛;馮婧;王永軍;;國際工程項目管理模式的比較及發(fā)展趨勢預(yù)測[J];建筑設(shè)計管理;2008年05期
9 梁元花;;國際工程項目變更結(jié)算經(jīng)驗總結(jié)[J];東北水利水電;2009年01期
10 南靜雯;;國際工程項目管理模式研究[J];中國新技術(shù)新產(chǎn)品;2009年20期
相關(guān)會議論文 前2條
1 王寶河;;關(guān)于為國際工程項目提供職業(yè)健康保障管理工作設(shè)想[A];中華預(yù)防醫(yī)學(xué)會石油系統(tǒng)分會第五屆預(yù)防醫(yī)學(xué)學(xué)術(shù)交流會論文集[C];2008年
2 葉寶松;;基于財務(wù)視角的國際工程項目風險控制[A];中國建材產(chǎn)業(yè)發(fā)展研究論文集[C];2010年
相關(guān)重要報紙文章 前10條
1 王建海;如何規(guī)避國際工程項目中的財務(wù)風險?[N];中國冶金報;2005年
2 通訊員 底建平;出色的國際工程項目專家[N];中國鐵道建筑報;2011年
3 鄭謙;國際工程項目的人員配置與管理[N];建筑時報;2012年
4 楊寬新 通訊員 章海華;長慶建設(shè)工程總公司承攬4億元國際工程項目[N];中國石油報;2007年
5 天津大學(xué)管理學(xué)院 何伯森 程志鵬 趙珊珊;國際工程項目爭議的調(diào)解與仲裁[N];建筑時報;2005年
6 廣西國際經(jīng)濟技術(shù)合作公司海外工程部 黃軍強;履約保函 國際工程項目的護身符[N];國際商報;2001年
7 楊忠;尼羅河畔的感悟[N];中國電力報;2006年
8 劉長江 楊朝儒 矯健 李淑艷;馳騁蘇丹競風流[N];石油管道報;2007年
9 劉濤 永欣 亞茹 喜芳 素范;管道局各單位備戰(zhàn)印度工程加緊進行[N];石油管道報;2006年
10 林春英 陶明啟;中國武夷筑夢非洲[N];中華建筑報;2014年
相關(guān)博士學(xué)位論文 前1條
1 王超;中國對外承包工程企業(yè)國際工程項目風險預(yù)警機制研究[D];清華大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 鄒超;基于平衡計分卡的國際工程項目績效評估體系的構(gòu)建及應(yīng)用[D];西南交通大學(xué);2015年
2 馮自紅;八冶公司國際工程項目管理問題研究[D];蘭州大學(xué);2015年
3 穆彥彥;基于NEC工程施工合同條件的建設(shè)項目施工風險管理研究[D];河北工程大學(xué);2015年
4 曹蓓蓓;國際工程項目SHE管理體系研究[D];華北電力大學(xué);2015年
5 李自沖;XX勘測院國際工程項目內(nèi)部控制研究[D];云南財經(jīng)大學(xué);2015年
6 王苗苗;越南廣寧火電國際工程項目的風險分析及對策[D];上海交通大學(xué);2014年
7 任冬冬;文化差異對國際工程項目的財務(wù)風險影響研究[D];河北經(jīng)貿(mào)大學(xué);2014年
8 鄭謙;提高國際工程項目經(jīng)濟效益的途徑研究[D];對外經(jīng)濟貿(mào)易大學(xué);2006年
9 孫永杰;國際工程項目與國內(nèi)建筑施工企業(yè)協(xié)同機制研究[D];山東大學(xué);2010年
10 鄭怡寧;國際工程項目風險預(yù)警管理機制研究[D];山東大學(xué);2013年
,本文編號:2306804
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/2306804.html