Boost型PWM整流器并聯(lián)環(huán)流機(jī)理分析及抑制策略
發(fā)布時(shí)間:2018-08-29 19:29
【摘要】:對(duì)Boost型脈寬調(diào)制(PWM)整流器的并聯(lián)環(huán)流產(chǎn)生機(jī)理進(jìn)行了詳細(xì)分析。通過(guò)在αβ0坐標(biāo)系下建模,將環(huán)流劃分為共模環(huán)流、差模環(huán)流、高頻環(huán)流3類(lèi),揭示了各類(lèi)環(huán)流的影響因素。在此基礎(chǔ)上,基于比例諧振調(diào)節(jié)器,針對(duì)差模環(huán)流和共模環(huán)流分別設(shè)計(jì)了獨(dú)立控制器。由于αβ0坐標(biāo)系不需要電網(wǎng)相位信息,因此該控制策略能夠省略鎖相環(huán)節(jié),簡(jiǎn)化計(jì)算量和控制結(jié)構(gòu)。在600kVA對(duì)拖平臺(tái)上進(jìn)行了實(shí)驗(yàn),驗(yàn)證了機(jī)理分析的正確性與控制策略的有效性。
[Abstract]:The generation mechanism of parallel circulation of Boost type (PWM) rectifier with pulse width modulation is analyzed in detail. By modeling in 偽 尾 0 coordinate system, the circulation is divided into three categories: common mode circulation, differential mode circulation and high frequency circulation. On this basis, independent controllers are designed for differential mode circulation and common mode circulation based on proportional resonant regulator. Because the phase information of power network is not required in 偽 尾 0 coordinate system, the control strategy can omit the PLL node and simplify the calculation and control structure. Experiments on the towing platform by 600kVA are carried out to verify the correctness of the mechanism analysis and the effectiveness of the control strategy.
【作者單位】: 中國(guó)科學(xué)院電工研究所;中國(guó)科學(xué)院大學(xué);中國(guó)科學(xué)院風(fēng)能利用重點(diǎn)實(shí)驗(yàn)室;北京科諾偉業(yè)科技有限公司;
【基金】:國(guó)家科技支撐計(jì)劃重大項(xiàng)目(2012BAA01B00)~~
【分類(lèi)號(hào)】:TM461
,
本文編號(hào):2212186
[Abstract]:The generation mechanism of parallel circulation of Boost type (PWM) rectifier with pulse width modulation is analyzed in detail. By modeling in 偽 尾 0 coordinate system, the circulation is divided into three categories: common mode circulation, differential mode circulation and high frequency circulation. On this basis, independent controllers are designed for differential mode circulation and common mode circulation based on proportional resonant regulator. Because the phase information of power network is not required in 偽 尾 0 coordinate system, the control strategy can omit the PLL node and simplify the calculation and control structure. Experiments on the towing platform by 600kVA are carried out to verify the correctness of the mechanism analysis and the effectiveness of the control strategy.
【作者單位】: 中國(guó)科學(xué)院電工研究所;中國(guó)科學(xué)院大學(xué);中國(guó)科學(xué)院風(fēng)能利用重點(diǎn)實(shí)驗(yàn)室;北京科諾偉業(yè)科技有限公司;
【基金】:國(guó)家科技支撐計(jì)劃重大項(xiàng)目(2012BAA01B00)~~
【分類(lèi)號(hào)】:TM461
,
本文編號(hào):2212186
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/2212186.html
最近更新
教材專(zhuān)著