風(fēng)電項(xiàng)目融資模式應(yīng)用研究
[Abstract]:The development and construction of wind power projects need the effective operation of the capital market. However, due to the complexity and systematization of wind power construction, wind power projects are characterized by relying on government policies, large investment quotas, short development cycles and long payback periods. Therefore, the financing method of wind power project is one of the key problems to be solved in wind power construction. This paper analyzes the internal and external factors affecting the wind power project, through combing the various modes of wind power project financing, summarizes and analyzes the characteristics, operation mode and advantages and disadvantages of each wind power project financing mode. Through the development of wind power projects at home and abroad, this paper summarizes and analyzes the successful experiences and shortcomings of wind power projects at home and abroad, and points out the direction of financing for domestic wind power projects. The development course of Spanish wind power is analyzed emphatically. It is pointed out that Spain has promoted the rapid development of wind power projects in Spain by adopting the financing mode of wind power projects under high subsidized electricity prices and by combining with private capital investment with reasonable returns. It also pointed out that the development of wind power projects in Spain has not been as good as before due to the change of wind power policy in Spain in 2012, and that the lack of continuity of the policy and the lack of uniformity have restricted the development of wind power projects in Spain. This paper points out that under the influence of the financing characteristics of wind power projects in our country at the present stage, individual wind power projects can actively explore other financing channels on the basis of fully relying on bank loans and CDM financing and making appropriate additions through the financing leasing mode. To achieve the diversification of financing channels, reduce financing costs. In addition to the above financing methods, large wind power groups can also raise large-scale funds through the overall listing and supply chain financing. At the same time, the country needs to create the conditions for wind power project financing, to give more policy support, to provide the concession conditions promised by the government in the fixed electricity purchase contract or the concession agreement and to maintain the consistency, continuity and integrity of the government policy. Give investors enough confidence. In addition, the paper defines the connotation of wind power project financing ability evaluation, constructs the index system of wind power project financing ability evaluation, and clarifies the evaluation method of wind power project financing ability using AHP. Finally, some suggestions are given to strengthen the financing ability of wind power projects in China.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 吳慶廣;;中國(guó)風(fēng)力發(fā)電公司融資模式探討[J];環(huán)境科學(xué)與管理;2008年01期
2 李鳳英;;關(guān)于風(fēng)電項(xiàng)目融資方式探討[J];北方經(jīng)濟(jì);2011年06期
3 陸正飛;企業(yè)適度負(fù)債的理論分析與實(shí)證研究[J];經(jīng)濟(jì)研究;1996年02期
4 于鴻溫;朱傳路;;我國(guó)BOT項(xiàng)目融資存在的問(wèn)題與對(duì)策[J];技術(shù)與市場(chǎng);2012年04期
5 夏陽(yáng),王革華,趙勇;中國(guó)風(fēng)電并網(wǎng)若干問(wèn)題的博弈研究[J];可再生能源;2005年01期
6 張伯勇;趙秀生;;中國(guó)風(fēng)電CDM項(xiàng)目經(jīng)濟(jì)性分析[J];可再生能源;2006年02期
7 Kostantinos D Patlitzianas,Argyris G Kagiannas,John Psarras,項(xiàng)芬麗;清潔發(fā)展機(jī)制項(xiàng)目的融資方案[J];能源工程;2004年01期
8 朱慶華,王旭東;清潔發(fā)展機(jī)制:利用外資的新模式[J];煙臺(tái)大學(xué)學(xué)報(bào)(哲學(xué)社會(huì)科學(xué)版);2003年04期
9 鐘素芝;何亙;;聯(lián)合承租與風(fēng)電項(xiàng)目融資租賃[J];中國(guó)電力企業(yè)管理;2011年07期
,本文編號(hào):2157975
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/2157975.html