配電網(wǎng)電壓無功三級聯(lián)調(diào)綜合控制的研究與應(yīng)用
本文選題:農(nóng)村配網(wǎng) + 低電壓; 參考:《鄭州大學》2014年碩士論文
【摘要】:電壓質(zhì)量的好壞同經(jīng)濟發(fā)展、用電安全息息相關(guān),優(yōu)質(zhì)穩(wěn)定的電壓質(zhì)量依賴于靈活準確的調(diào)控技術(shù)。傳統(tǒng)電壓無功控制方法,依靠的是變電站、線路、配變處的電壓無功調(diào)控設(shè)備檢測本地電壓值、有功無功值、功率因數(shù)等數(shù)據(jù)進行獨立式的控制調(diào)節(jié),以保證電壓值、無功值位于合格的工作范圍內(nèi)。然而隨著農(nóng)村經(jīng)濟的發(fā)展,現(xiàn)有的電壓無功調(diào)節(jié)技術(shù)無法滿足解決用戶側(cè)低電壓問題的需要。因此,對電壓無功三級聯(lián)調(diào)技術(shù)進行研究有重要的意義。 變電站、中壓線路、配變依靠有載調(diào)節(jié)變壓器分接頭、投切電容器組兩種手段對本地電壓無功調(diào)控設(shè)備進行獨立式調(diào)控,不能夠?qū)Ω骷壵{(diào)控設(shè)備的運行狀態(tài)作出聯(lián)合調(diào)整,就使得變電站、線路、臺區(qū)設(shè)備的調(diào)控裕度得不到有效互補,不僅浪費了控制設(shè)備的調(diào)控潛力,也無益于農(nóng)網(wǎng)線路末端“低電壓”問題的有效解決。在各級設(shè)備控制策略的基礎(chǔ)上,電壓無功三級聯(lián)調(diào)技術(shù)根據(jù)聯(lián)調(diào)原則和聯(lián)調(diào)流程,結(jié)合通信技術(shù)、自動控制技術(shù)、數(shù)據(jù)采集監(jiān)測等技術(shù),充分發(fā)揮各級控制設(shè)備的調(diào)控裕度,,挖掘其調(diào)控潛力從而將饋線末端的電壓值穩(wěn)定在規(guī)定范圍內(nèi),同時提高了電網(wǎng)的功率因數(shù),降低了網(wǎng)損率。 本文首先對農(nóng)網(wǎng)低電壓現(xiàn)狀及其產(chǎn)生原因進行了細致的分析,并對變電站、中壓線路、配變臺區(qū)的電壓無功控制策略進行了詳細系統(tǒng)的論述,為文章主要研究的電壓無功三級聯(lián)調(diào)技術(shù)奠定理論基礎(chǔ)并形成比較。其次,本文在詳細研究三級聯(lián)調(diào)技術(shù)調(diào)控過程并給出其數(shù)學模型的基礎(chǔ)上,運用PSASP軟件建立了三級聯(lián)調(diào)的電網(wǎng)仿真模型,通過對三級聯(lián)調(diào)仿真計算結(jié)果的比較與分析,驗證了三級聯(lián)調(diào)技術(shù)在改善用戶端“低電壓”問題方面的合理性、有效性。最后以仿真結(jié)果為理論指導闡述了某地區(qū)開展電壓無功三級聯(lián)調(diào)的工程實踐,其調(diào)控效果體現(xiàn)了三級聯(lián)調(diào)技術(shù)的經(jīng)濟效益、技術(shù)效益、社會效益。
[Abstract]:The quality of voltage is closely related to the development of economy and the safety of power consumption. High quality and stable voltage quality depend on flexible and accurate control technology. The traditional voltage and reactive power control method relies on the local voltage value, the active reactive power value, the power factor and so on data of substation, line, distribution transformer to carry on the independent control adjustment, in order to guarantee the voltage value, The reactive power is within the range of qualified work. However, with the development of rural economy, the existing voltage and reactive power regulation technology can not meet the need to solve the problem of low voltage on the user side. Therefore, it is of great significance to study the three-stage voltage and reactive power regulation technology. Substation, medium voltage line and distribution transformer rely on tap of load regulating transformer and switching capacitor bank to carry out independent control of local voltage and reactive power control equipment, and can not make joint adjustment to the operation state of all levels of regulating equipment. Therefore, the adjustment margin of substation, line and station equipment can not be effectively complementary, which not only wastes the control potential of the control equipment, but also does not benefit the effective solution of the "low voltage" problem at the end of the rural power line. On the basis of the control strategy of all levels of equipment, the voltage and reactive power three-level combined regulation technology, according to the principle and flow of connection and adjustment, combined with communication technology, automatic control technology, data acquisition and monitoring, etc., to give full play to the control margin of all levels of control equipment. In order to stabilize the voltage value at the end of the feeder within a specified range, the power factor of the power network is improved and the loss rate is reduced. In this paper, the current situation of low voltage in rural power network and its causes are analyzed in detail, and the voltage and reactive power control strategies of substation, medium voltage line and distribution station are discussed in detail. It lays a theoretical foundation and makes a comparison between voltage and reactive power three-stage combined regulation technology which is mainly studied in this paper. Secondly, on the basis of the detailed study of the regulation and control process of the three-level joint dispatching technology and its mathematical model, the paper establishes the power network simulation model of the three-level joint dispatching by using PSASP software, and compares and analyzes the simulation results of the three-level joint dispatching system. The rationality and effectiveness of the three-level tuning technology in improving the "low voltage" problem of the client are verified. Finally, based on the simulation results, the engineering practice of voltage and reactive power three-stage joint regulation in a certain area is expounded. The control effect reflects the economic, technical and social benefits of the three-stage combined regulation technology.
【學位授予單位】:鄭州大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TM761.12
【共引文獻】
相關(guān)期刊論文 前10條
1 劉振艷;;淺談農(nóng)村電網(wǎng)線損及降損措施[J];科技創(chuàng)新與應(yīng)用;2012年07期
2 李小龍;張旭輝;曾岸理;周力行;陳偉圖;;小電源接入配網(wǎng)后的線損理論計算方法研究[J];電工電能新技術(shù);2011年04期
3 鐘貴傳;王星華;錢同海;;配電網(wǎng)理論線損計算方法綜述[J];電工技術(shù);2011年05期
4 王興攀;李可;馬孝義;何貴軍;曹志剛;;宣威市配電網(wǎng)絡(luò)節(jié)能降損方案研究[J];電力學報;2011年02期
5 張弘廷;趙金來;田韶昱;洪濻;;隨器補償技術(shù)問題探討[J];電力電容器與無功補償;2012年02期
6 李韶山;范荻;張磊;;低壓臺區(qū)線損實測研究——暨華北電網(wǎng)公司配電線損測量儀的應(yīng)用[J];電力設(shè)備;2006年09期
7 胡瑛俊;章堅民;劉大業(yè);;基于前推回代法和量測數(shù)據(jù)資源的多電源供電配電網(wǎng)線損計算[J];電力自動化設(shè)備;2009年12期
8 李妍紅;劉明波;陳荃;;配電網(wǎng)低壓動態(tài)無功補償降損效果評估[J];電網(wǎng)技術(shù);2006年19期
9 于振;朱朝陽;張大華;;基于組件化的配網(wǎng)B/S繪圖系統(tǒng)的研究與實現(xiàn)[J];電力信息化;2010年08期
10 王宏宇;劉芷麟;王春顏;霍寧寧;高瀟;;低壓用電管理系統(tǒng)設(shè)計與實現(xiàn)[J];電力信息化;2012年03期
相關(guān)會議論文 前5條
1 李紅全;;配網(wǎng)線損構(gòu)成、影響因素及對策淺析[A];2011年云南電力技術(shù)論壇論文集(入選部分)[C];2011年
2 鐘貴傳;王星華;錢同海;;配電網(wǎng)理論線損計算方法綜述[A];武漢(南方九省)電工理論學會第22屆學術(shù)年會、河南省電工技術(shù)學會年會論文集[C];2010年
3 田有文;汪錫成;;縣級供電企業(yè)線損管理新模式的研究與應(yīng)用[A];中國高等學校電力系統(tǒng)及其自動化專業(yè)第二十四屆學術(shù)年會論文集(下冊)[C];2008年
4 楊澤恒;唐巍;;單相配電方式數(shù)學建模及適用范圍研究[A];中國高等學校電力系統(tǒng)及其自動化專業(yè)第二十四屆學術(shù)年會論文集(下冊)[C];2008年
5 蘇文博;孫士民;劉娟;潘向華;;預(yù)防10kV系統(tǒng)電壓無功控制裝置故障策略研究[A];山東電機工程學會第十二屆優(yōu)秀論文匯編[C];2011年
相關(guān)博士學位論文 前1條
1 李超英;基于電網(wǎng)智能化的中低壓線損管理研究[D];天津大學;2012年
相關(guān)碩士學位論文 前10條
1 張力淼;農(nóng)村電力網(wǎng)規(guī)劃計算機輔助設(shè)計系統(tǒng)的研究[D];鄭州大學;2010年
2 李志會;阜蒙縣農(nóng)電局線損管理研究[D];遼寧工程技術(shù)大學;2010年
3 鐘貴傳;配電網(wǎng)理論線損計算方法及其應(yīng)用研究[D];廣東工業(yè)大學;2011年
4 李玉良;配電網(wǎng)規(guī)劃方案的技術(shù)評估模型與算法研究[D];華南理工大學;2011年
5 黃振朋;配電網(wǎng)理論線損分析方法的研究與應(yīng)用[D];鄭州大學;2011年
6 張永暉;電網(wǎng)降損綜合計算與輔助決策系統(tǒng)的研究[D];鄭州大學;2011年
7 劉棟;負荷特性曲線監(jiān)測及其在理論線損計算中的應(yīng)用[D];鄭州大學;2011年
8 尹超;縣級供電企業(yè)配電網(wǎng)線損分析及降損研究[D];山東大學;2011年
9 李素馨;供電企業(yè)低壓配電網(wǎng)GIS的研究與開發(fā)[D];華北電力大學;2011年
10 姚玉永;唐山市古冶區(qū)電網(wǎng)線損管理系統(tǒng)的研究與開發(fā)[D];華北電力大學;2011年
本文編號:1922671
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/1922671.html