春風(fēng)變電站電氣設(shè)計和保護(hù)配置研究
發(fā)布時間:2018-05-06 16:27
本文選題:電網(wǎng)規(guī)劃 + 春風(fēng)變電站升壓擴(kuò)建 ; 參考:《中國石油大學(xué)(華東)》2014年碩士論文
【摘要】:電網(wǎng)規(guī)劃是電力系統(tǒng)規(guī)劃的重要組成部分,其任務(wù)是根據(jù)規(guī)劃期間的負(fù)荷增長及電源規(guī)劃方案確定相應(yīng)的最佳規(guī)劃結(jié)構(gòu),以滿足經(jīng)濟(jì)可靠地傳輸電力的要求。因此做好電力工程建設(shè)的前期規(guī)劃工作,落實本體工程的建設(shè)條件,協(xié)調(diào)其建設(shè)進(jìn)度,優(yōu)化其設(shè)計方案,其意義尤為重大。本課題根據(jù)春風(fēng)采油廠排601區(qū)塊近五年的產(chǎn)能規(guī)劃及負(fù)荷發(fā)展概況,分別從帶載能力、供電可靠性等方面對其供電電源35kV春風(fēng)變電站的運(yùn)行現(xiàn)狀進(jìn)行深入分析,進(jìn)而闡述了春風(fēng)變電站升壓擴(kuò)建的必要性;結(jié)合現(xiàn)場實際,設(shè)計完成春風(fēng)變電站升壓擴(kuò)建總體方案,然后根據(jù)總體設(shè)計方案,選取110kV供電電源點(diǎn),確定主變?nèi)萘?完成斷路器、隔離開關(guān)、電流互感器等重要一次設(shè)備的選型;在此基礎(chǔ)上對主變和線路進(jìn)行保護(hù)配置研究,并針對所選主變、線路保護(hù)設(shè)備原理特性,選擇相應(yīng)算法對系統(tǒng)進(jìn)行定值整定。此外,本文還對現(xiàn)場綜合自動化系統(tǒng)的相關(guān)配置進(jìn)行了施工方案設(shè)計,實現(xiàn)對主要設(shè)備的自動監(jiān)視、測量、控制、保護(hù)以及遠(yuǎn)動信息傳遞,提高全站的安全運(yùn)行水平。論文結(jié)合工程實踐,對春風(fēng)變電站升壓擴(kuò)建工程中設(shè)備選型和保護(hù)配置等實際應(yīng)用問題展開了深入研究,課題具有一定的普遍性和實踐性。
[Abstract]:Power network planning is an important part of power system planning. Its task is to determine the optimal planning structure according to the load growth and power planning scheme during the planning period in order to meet the requirements of economic and reliable transmission of power. Therefore, it is of great significance to do well the preliminary planning of electric power engineering construction, to implement the construction conditions of ontology engineering, to coordinate its construction progress and to optimize its design scheme. According to the production capacity planning and load development of Block 601 in Chunfeng Oil production Plant in recent five years, the operation status of its power supply 35kV Chunfeng Substation is analyzed from the aspects of load capacity, power supply reliability and so on. Then it expounds the necessity of the booster expansion of the Chunfeng substation, designs and completes the overall scheme of the booster expansion of the Chunfeng substation, then selects the power supply point of 110kV according to the overall design scheme, determines the main transformer capacity, and completes the circuit breaker. The main transformer and line protection configuration are studied on this basis, and the corresponding algorithm is selected to set the value of the system according to the selected main transformer and the principle characteristics of the line protection equipment. In addition, the related configuration of the field integrated automation system is designed to realize the automatic monitoring, measurement, control, protection and telecontrol information transmission of the main equipment, so as to improve the safe operation level of the whole station. Combined with engineering practice, the paper deeply studies the practical application problems such as equipment selection and protection configuration in the booster expansion project of Chunfeng substation, and the subject has certain universality and practicality.
【學(xué)位授予單位】:中國石油大學(xué)(華東)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TM63
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 洪天p,
本文編號:1853028
本文鏈接:http://www.sikaile.net/kejilunwen/dianlilw/1853028.html
最近更新
教材專著