信息運維綜合監(jiān)管系統(tǒng)研發(fā)過程質量管理研究
[Abstract]:With the development of smart grid and SG-ERP construction, the production, operation and management activities of the State Grid Corporation are increasingly dependent on the information system, and the integration of IT equipment and information system software will also be higher. The need for its security will also increase. The State Grid Corporation has completed the development of the integrated supervision system for information operation and maintenance of the internal network, and the project has further strengthened the construction of supporting means for each unit. In order to meet the needs of the continuous safe and effective operation of the information system, the daily information operation and maintenance management and the construction of the information system dispatching system, it is necessary to carry out the construction of the external network system on the basis of the construction of the comprehensive supervision system for the information operation and maintenance of the internal network. The construction of the external network system undertaken by R Company has made a major breakthrough. First, it can monitor all the important IT equipments in the external network of real-time monitoring information on-line; second, it can monitor the operation and application of the business system in real-time; third, it can obviously improve the running efficiency of the system and effectively improve the service effect of the system; The fourth is to ensure the safe and stable operation of the system. Based on the process management method of modern IT project quality, this paper takes the construction project of information operation and maintenance comprehensive supervision system of National Power Grid Corporation as an example, and fully analyzes the scale of the project. Characteristics and the actual situation of project quality management, aiming at the effect of quality management in the process of IT product research and development have been demonstrated and studied. This paper first introduces the basic theory of modern IT project management and the system, principle and process of IT project quality management. Secondly, the necessity, goal and scope of the system construction project are analyzed, and the content, management process and method of the quality management activities in each stage of the project construction process are studied. Finally, the fuzzy hierarchy process (FAHP),) is used to establish the quality management model according to the content and characteristics of different phases of the project, and evaluate the R & D process of the system. Customer experience quality is also added to the evaluation index system, which can evaluate the product quality from the perspective of users, and make the evaluation more stereoscopic. Through the evaluation results, we can see that the quality management in the R & D process of the product is effective, ensuring that the product meets the customer's expected standards. In order to provide a reference for the construction of similar IT projects, especially in the project quality management.
【學位授予單位】:華北電力大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:F426.61;TP311.52
【參考文獻】
相關期刊論文 前10條
1 李娜;;中國質量管理研究現狀綜述[J];質量探索;2015年05期
2 畢然;;基于模糊層次分析法的培訓項目全面質量管理評價指標體系研究[J];質量探索;2014年12期
3 方勇;鄭銀霞;;全面質量管理在科研管理中的應用與發(fā)展[J];科學學與科學技術管理;2014年02期
4 林海明;杜子芳;;主成分分析綜合評價應該注意的問題[J];統(tǒng)計研究;2013年08期
5 宋喜鳳;杜榮;艾時鐘;;IT外包中關系質量、知識共享與外包績效關系研究[J];管理評論;2013年01期
6 王林林;;軟件項目質量管理的初步探討[J];黑龍江科技信息;2012年14期
7 鄧雪;李家銘;曾浩健;陳俊羊;趙俊峰;;層次分析法權重計算方法分析及其應用研究[J];數學的實踐與認識;2012年07期
8 李全喜;孫磐石;金鳳花;;質量管理與組織創(chuàng)新、組織績效的關系——以我國制造類企業(yè)為例的實證研究[J];科技進步與對策;2011年06期
9 宋成偉;;數據包絡分析法評價技術進步的效果[J];技術經濟與管理研究;2008年05期
10 韓忠東;李平;楊鋒杰;翟培合;馬華;姜雪輝;陳槞;;項目進度管理與信息系統(tǒng)質量控制的關系研究[J];中國科技信息;2006年22期
相關碩士學位論文 前4條
1 孫躍龍;基于模糊層次法的電廠擴建項目綜合評價研究[D];華北電力大學;2013年
2 鄭江華;中小型軟件企業(yè)項目開發(fā)過程質量管理方法研究[D];華中科技大學;2013年
3 葉珍;基于AHP的模糊綜合評價方法研究及應用[D];華南理工大學;2010年
4 劉波;中國移動江蘇公司綜合結算系統(tǒng)建設項目質量管理研究[D];南京理工大學;2007年
,本文編號:2431942
本文鏈接:http://www.sikaile.net/kejilunwen/dianlidianqilunwen/2431942.html