天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 電氣論文 >

7MW風電底座生產(chǎn)的關鍵控制技術

發(fā)布時間:2018-08-18 16:13
【摘要】:簡述7 MW風電底座鑄件的特點、技術要求及鑄造難度。從鑄造工藝和熔煉工藝兩方面,介紹了7MW風電底座鑄件鑄造生產(chǎn)中的關鍵控制技術,尤其是造型過程中對砂芯支撐、鑄件壁厚的控制和熔煉澆注過程中球化孕育處理技術。通過對這些關鍵技術的控制,解決了生產(chǎn)難點,最終生產(chǎn)出符合質(zhì)量要求的鑄件。為大型風電鑄件的生產(chǎn)提供借鑒。
[Abstract]:The characteristics, technical requirements and casting difficulty of 7 MW wind power base castings are briefly described. In this paper, the key control techniques in casting production of 7MW wind power base castings are introduced from two aspects: casting technology and smelting process, especially the control of sand core support, wall thickness control and spheroidization inoculation treatment during casting process. Through the control of these key technologies, the production difficulties are solved and the castings that meet the quality requirements are finally produced. For the production of large wind power castings to provide reference.
【作者單位】: 江蘇吉鑫風能科技股份有限公司;
【分類號】:TG24;TM614

【相似文獻】

相關博士學位論文 前1條

1 王洪;精密高效非圓磨削關鍵控制技術研究與應用[D];湖南大學;2014年

,

本文編號:2189995

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/dianlidianqilunwen/2189995.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶8868f***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com