某核電廠廠用水系統(tǒng)水錘分析方法簡析
發(fā)布時間:2018-05-10 13:32
本文選題:核電廠 + 廠用水系統(tǒng); 參考:《給水排水》2017年S2期
【摘要】:采用AFT Impluse軟件對某核電廠廠用水系統(tǒng)進行水錘分析評估。在整個分析過程中,主要工作包括系統(tǒng)流程簡化、梳理系統(tǒng)運行工況、確定主要設備關鍵參數(shù)、明確系統(tǒng)管網(wǎng)布置情況、構建計算模型。通過對廠用水系統(tǒng)全工況的分析得出該核電廠廠用水系統(tǒng)不會出現(xiàn)破壞性水錘。
[Abstract]:The water hammer analysis and evaluation of a nuclear power plant water system is carried out by AFT Impluse software. In the whole analysis process, the main work includes simplifying the system flow, combing the operating conditions of the system, determining the key parameters of the main equipment, defining the layout of the system pipe network, and constructing the calculation model. Through the analysis of the whole working conditions of the plant water system, it is concluded that there will be no destructive water hammer in the plant water system of the nuclear power plant.
【作者單位】: 上海核工程研究設計院有限公司;
【分類號】:TM623
【相似文獻】
相關期刊論文 前2條
1 陳松;;秦山二核安全廠用水系統(tǒng)管道防腐蝕設計評價[J];腐蝕與防護;2010年04期
2 王震亞;謝圣華;湯國祥;;以可靠性為中心的核電廠廠用水系統(tǒng)維修分析[J];核動力工程;2011年05期
相關碩士學位論文 前1條
1 李震;濱海非能動核電站廠用水系統(tǒng)優(yōu)化研究[D];上海交通大學;2015年