基于流水作業(yè)的66kv唐王分歧線路工程進(jìn)度管理研究

發(fā)布時(shí)間:2018-04-13 02:36

  本文選題:項(xiàng)目管理 + 流水作業(yè); 參考:《華北電力大學(xué)》2017年碩士論文


【摘要】:隨著當(dāng)今經(jīng)濟(jì)的迅猛發(fā)展,我國城市規(guī)模的不斷擴(kuò)大,電網(wǎng)建設(shè)作為國家基礎(chǔ)工程建設(shè),是社會經(jīng)濟(jì)建設(shè)和城市發(fā)展的能源動脈,其發(fā)展的必要性不言而喻。電網(wǎng)不斷擴(kuò)大,線路將繼續(xù)向自然環(huán)境條件更加復(fù)雜的未開發(fā)邊遠(yuǎn)地區(qū),以及居民密集和經(jīng)濟(jì)高度發(fā)達(dá)地區(qū)兩頭延伸,輸電線路建設(shè)必將面臨更加嚴(yán)峻的考驗(yàn)。項(xiàng)目進(jìn)度管理作為項(xiàng)目管理的重要組成部分,它對衡量整個(gè)項(xiàng)目水平的高低,工程項(xiàng)目能否保質(zhì)保量按時(shí)完成,項(xiàng)目的成本和收益都起著關(guān)鍵的作用,因而具有極大的研究意義。進(jìn)度管理是工程項(xiàng)目管理的三大管理目標(biāo)之一,直接關(guān)系到建設(shè)項(xiàng)目的經(jīng)濟(jì)、社會效益,具有舉足輕重的地位。本文將運(yùn)用施工組織計(jì)劃和項(xiàng)目進(jìn)度管理的相關(guān)理論,以66KV唐王分岐線路工程項(xiàng)目的進(jìn)度管理為背景,對項(xiàng)目進(jìn)度管理進(jìn)行編制和優(yōu)化。唐王分岐線路工程作為大型、復(fù)雜的項(xiàng)目,其設(shè)備、電力、管線、消防聯(lián)動系統(tǒng)等內(nèi)部結(jié)構(gòu)設(shè)施工程量占到建筑物總工程量的40%以上,相應(yīng)的,建筑物內(nèi)部設(shè)施的設(shè)計(jì)和建造難度也在增加,項(xiàng)目建設(shè)的現(xiàn)場組織工作也變的更加困難。本文將通過研究和分析網(wǎng)絡(luò)計(jì)劃優(yōu)化方面的相關(guān)的知識,并結(jié)合理論在具體的工程項(xiàng)目中實(shí)際應(yīng)用經(jīng)驗(yàn),旨在解決工程建設(shè)中的沖突,以實(shí)現(xiàn)科學(xué)有效的項(xiàng)目進(jìn)度管理。本文將結(jié)合66KV唐王分岐線路工程項(xiàng)目的具體情況運(yùn)用項(xiàng)目管理的相關(guān)理論對其進(jìn)行研究,首先介紹國內(nèi)外研究現(xiàn)狀,并對工程進(jìn)度管理、流水施工法相關(guān)理論進(jìn)行了簡要闡述。其次介紹了66kv唐王分歧線路工程概況,包括項(xiàng)目背景、施工項(xiàng)目組織機(jī)構(gòu)、項(xiàng)目施工工序等,重點(diǎn)編制了工程項(xiàng)目施工計(jì)劃,運(yùn)用WBS方法對項(xiàng)目結(jié)構(gòu)進(jìn)行分解,并繪制了網(wǎng)絡(luò)進(jìn)度計(jì)劃圖,重點(diǎn)運(yùn)用搭接網(wǎng)絡(luò)對網(wǎng)絡(luò)圖進(jìn)行優(yōu)化和控制,以縮短工期提高效率。最后對項(xiàng)目進(jìn)度計(jì)劃的實(shí)施提出了保證措施,包括風(fēng)險(xiǎn)預(yù)防措施、工期質(zhì)量保證措施、安全管理保證措施及物資及文件資料管理等。
[Abstract]:With the rapid development of economy and the continuous expansion of the scale of cities in our country, the power grid construction, as a national basic engineering construction, is the energy artery of social economic construction and urban development, and the necessity of its development is self-evident.With the continuous expansion of the power grid, the transmission lines will continue to extend to the undeveloped remote areas with more complex natural environment conditions, as well as to the densely populated and economically highly developed areas, so the construction of transmission lines will be faced with a more severe test.As an important part of project management, project schedule management plays a key role in measuring the level of the whole project, whether the quality and quantity of the project can be completed on time, and the cost and benefit of the project.Therefore, it has great significance in research.Schedule management is one of the three management objectives of project management, which is directly related to the economic and social benefits of construction projects and plays a pivotal role.In this paper, based on the theory of construction organization plan and project schedule management, based on the schedule management of 66KV Tangwangfangqi line project, the project schedule management is compiled and optimized.As a large and complex project, the Tangwang Diqi line project has more than 40% of the total construction volume of its internal structure facilities, such as equipment, electric power, pipeline, fire control system, etc.The design and construction of the building's interior facilities are becoming more difficult, and the site organization of the project is becoming more difficult.By studying and analyzing the related knowledge of network planning optimization and combining the practical application experience of theory in concrete engineering projects, this paper aims to solve the conflicts in engineering construction and to realize scientific and effective project schedule management.In this paper, according to the specific situation of 66KV Tangwangfangqi line project, we will apply the relevant theory of project management to study it. Firstly, we will introduce the domestic and foreign research situation, and briefly explain the theory of project schedule management and income's construction method.Secondly, it introduces the general situation of the 66kv Tangwang diverging line project, including the background of the project, the organization of the construction project, the construction process of the project, and so on. The construction plan of the project is compiled with emphasis, and the project structure is decomposed by WBS method.The network schedule diagram is drawn, and the network diagram is optimized and controlled by using the overlay network, in order to shorten the time limit and improve the efficiency.Finally, the guarantee measures are put forward for the implementation of the project schedule plan, including risk prevention measures, time limit quality assurance measures, safety management assurance measures, materials and documents management, etc.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TM75

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李富民;;企業(yè)項(xiàng)目物資采購供應(yīng)管理與實(shí)踐[J];石油石化物資采購;2015年10期

2 肖喜銀;;項(xiàng)目管理理念在設(shè)備管理中的應(yīng)用[J];產(chǎn)業(yè)與科技論壇;2015年17期

3 蘇志雄;乞建勛;闞芝南;;搭接網(wǎng)絡(luò)的新表示方法與奇異現(xiàn)象研究[J];系統(tǒng)工程理論與實(shí)踐;2015年01期

4 王紅娟;;火電EPC項(xiàng)目文檔全過程控制研究[J];檔案學(xué)通訊;2015年01期

5 劉樹良;熊俊;乞建勛;蘇志雄;;搭接網(wǎng)絡(luò)中關(guān)鍵工序的奇異現(xiàn)象[J];中國管理科學(xué);2014年S1期

6 闞芝南;孔峰;乞建勛;;搭接網(wǎng)絡(luò)中的路長悖論及其特性研究[J];中國管理科學(xué);2014年05期

7 路洪洲;楊高升;;建設(shè)工程項(xiàng)目安全管理概念技能探究[J];中國安全生產(chǎn)科學(xué)技術(shù);2013年10期

8 邱小芬;;建設(shè)項(xiàng)目施工圖紙管理中注意的幾個(gè)問題[J];蘭臺世界;2013年S5期

9 梁智昆;;工程項(xiàng)目施工設(shè)備管理[J];云南水力發(fā)電;2013年05期

10 全世海;;流水施工搭接網(wǎng)絡(luò)圖的繪制[J];重慶建筑;2013年07期

相關(guān)博士學(xué)位論文 前1條

1 崔萬安;廣義優(yōu)先關(guān)系網(wǎng)絡(luò)關(guān)鍵性分析[D];華中科技大學(xué);2006年

相關(guān)碩士學(xué)位論文 前1條

1 周夢;搭接網(wǎng)絡(luò)的簡化計(jì)算方法研究[D];大連理工大學(xué);2012年



本文編號:1742583

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/kejilunwen/dianlidianqilunwen/1742583.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶38939***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com