曹妃甸圍海造地工程施工組織方案設(shè)計分析
本文選題:圍海造地 + 吹填施工; 參考:《華北理工大學(xué)》2017年碩士論文
【摘要】:隨著曹妃甸工業(yè)區(qū)開發(fā)建設(shè)的快速發(fā)展,對陸域面積的需求越來越大,圍海造地工程就不斷展開,工程施工中遇到的新問題也越來越多。以曹妃甸地區(qū)的某一圍海造地工程為例,依據(jù)曹妃甸開發(fā)區(qū)的工程實地條件和施工作業(yè)環(huán)境以及對應(yīng)的施工方案,有針對性的研究了曹妃甸開發(fā)區(qū)沿海地區(qū)圍海造地和吹填設(shè)計施工的一系列重要步驟,包括不同地質(zhì)條件、自然條件下如何采用不同的施工方案,具體到圍堤各個施工步驟,圍堤合攏關(guān)鍵點等。通過合攏失敗的簡要分析,突出了過程控制的重要性。結(jié)合后期吹填砂淤泥含量增大后采用竹-木排架架設(shè)吹填管線的成功經(jīng)驗,提供了吹填岸管鋪設(shè)的新方法。簡要介紹了吹填方案的選擇對吹填效果的影響。通過相關(guān)論述,闡明了只有詳細(xì)研究施工區(qū)域自然地理條件才能制定可行、高效的總體施工方案?傮w施工方案確定后的關(guān)鍵點難點,如圍堤龍口合攏、船型選擇、淤泥條件下吹填管線接長方案、吹填方案選擇等直接影響了工程進度快慢和工程經(jīng)濟效益。
[Abstract]:With the rapid development and construction of Caofeidian Industrial Zone, the demand for land area is increasing, and the land reclamation project has been carried out continuously, and the new problems encountered in the construction of the project are more and more. Taking a reclamation project in Caofeidian area as an example, according to the actual engineering conditions, construction environment and corresponding construction plan of Caofeidian Development Zone, A series of important steps in the design and construction of reclamation and reclamation in the coastal areas of Caofeidian Development Zone are studied, including different geological conditions, how to adopt different construction schemes under natural conditions, and concrete construction steps of the embankment. Embankment closure of the key points, etc. The importance of process control is highlighted through brief analysis of closure failure. Combined with the successful experience of using bamboo-wood bent frame to set up the pipe after the increase of silt content in the later stage, a new method for laying the pipe is provided. This paper briefly introduces the influence of the selection of the blowing scheme on the effect of the blow filling. This paper expounds that only by studying the physical and geographical conditions of the construction area in detail can a feasible and efficient overall construction scheme be formulated. The key points and difficulties after the determination of the overall construction plan, such as closure of the embankment, selection of the ship type, connection of the pipeline under silt conditions, selection of the filling scheme, etc., have a direct impact on the speed of the project and the economic benefits of the project.
【學(xué)位授予單位】:華北理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U655.2
【參考文獻】
相關(guān)期刊論文 前10條
1 張軍巖;于格;;世界各國(地區(qū))圍海造地發(fā)展現(xiàn)狀及其對我國的借鑒意義[J];國土資源;2008年08期
2 朱先根;;灘涂圍墾施工的思考[J];科技資訊;2008年05期
3 劉怡;;多元復(fù)合設(shè)計的香港商業(yè)建筑[J];新建筑;2007年05期
4 尹延鴻;;對河北唐山曹妃甸淺灘大面積填海的思考[J];海洋地質(zhì)動態(tài);2007年03期
5 鄧龍照;張兆華;;真空預(yù)壓在大型填海造陸工程中的應(yīng)用[J];水運工程;2006年S1期
6 陳云飛;潘金霞;趙有明;;深圳港銅鼓航道工程設(shè)計選線回顧與探討[J];水運工程;2006年10期
7 沈永明;馮年華;周勤;劉詠梅;陳子玉;;江蘇沿海灘涂圍墾現(xiàn)狀及其對環(huán)境的影響[J];海洋科學(xué);2006年10期
8 潘林有;;溫州劈山圍海造地對環(huán)境及巖土工程的影響[J];自然災(zāi)害學(xué)報;2006年02期
9 薛翊國;王清;涂齊亮;;軟弱地基處理方法選擇與展望[J];山西建筑;2006年07期
10 徐嘯,崔崢,毛寧;廈門港疏浚棄土吹填造陸物理模型試驗研究[J];臺灣海峽;2004年03期
相關(guān)碩士學(xué)位論文 前1條
1 陳小龍;海岸帶可持續(xù)發(fā)展立法芻議[D];浙江大學(xué);2011年
,本文編號:1903386
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/1903386.html