水力破除技術(shù)在橋梁斜拉索更換工程中的應(yīng)用
發(fā)布時間:2018-01-20 23:37
本文關(guān)鍵詞: 拉索 無損性 鑿除 公路大橋 端錨 梁寬 水力 原有結(jié)構(gòu) 錨頭 高壓水 出處:《施工技術(shù)》2017年22期 論文類型:期刊論文
【摘要】:正1項(xiàng)目背景某公路大橋斜拉索梁端錨頭埋于混凝土主梁體內(nèi),主梁寬1.7m、高2.0m、C50混凝土,舊索拆除更換時需要在梁底進(jìn)行鑿除混凝土開槽才能取出錨頭,完成新索更換,開槽過程中,為確保需鑿除部分的混凝土結(jié)構(gòu)與保留結(jié)構(gòu)無損性分離,對需保留結(jié)構(gòu)不產(chǎn)生任何擾動及損傷,本工程采用水力
[Abstract]:The Anchor head of Cable-Stayed Cable girder of a Highway Bridge is buried in the body of the concrete main beam with a width of 1.7 m and a height of 2.0 m / c ~ (50). When the old cable is removed and replaced, it is necessary to chisel the concrete slotted at the bottom of the beam to remove the anchor head and complete the replacement of the new cable. In the process of slotting, in order to ensure the non-destructive separation of the concrete structure and the retaining structure, the concrete structure needs to be chiseled off. There is no disturbance or damage to the structure to be retained. Hydraulic power is used in the project.
【作者單位】: 北京發(fā)研工程技術(shù)有限公司;
【分類號】:U445.7
【正文快照】: 1項(xiàng)目背景某公路大橋斜拉索梁端錨頭埋于混凝土主梁體內(nèi),主梁寬1.7m、高2.0m、C50混凝土,舊索拆除更換時需要在梁底進(jìn)行鑿除混凝土開槽才能取出錨頭,完成新索更換,開槽過程中,為確保需鑿除部分的混凝土結(jié)構(gòu)與保留結(jié)構(gòu)無損性分離,對需保留結(jié)構(gòu)不產(chǎn)生任何擾動及損傷,本工程采用
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 余朝陽;;利用機(jī)器人檢查斜拉索初探[J];廣東公路交通;2009年04期
2 蘇達(dá)根,高德虎,張志杰;斜拉索失效原因分析[J];工業(yè)建筑;1999年09期
3 李國平;斜拉索非線性分析的狀態(tài)修正法[J];同濟(jì)大學(xué)學(xué)報(自然科學(xué)版);2000年01期
4 劉萬鋒,劉健新;斜拉索粘性剪切型阻尼器的簡化設(shè)計(jì)方法[J];西安公路交通大學(xué)學(xué)報;2000年04期
5 潘鈞俊,林雪綱,莊表中,孫f,
本文編號:1449775
本文鏈接:http://www.sikaile.net/kejilunwen/daoluqiaoliang/1449775.html