建設(shè)項(xiàng)目全過程跟蹤審計(jì)風(fēng)險(xiǎn)問題研究

發(fā)布時(shí)間:2018-03-09 18:32

  本文選題:建設(shè)項(xiàng)目 切入點(diǎn):跟蹤審計(jì) 出處:《首都經(jīng)濟(jì)貿(mào)易大學(xué)》2017年碩士論文 論文類型:學(xué)位論文


【摘要】:近年來,隨著我國固定資產(chǎn)投資規(guī)模逐步擴(kuò)大,大量資金投向了基礎(chǔ)設(shè)施、公共工程等建設(shè)領(lǐng)域。但與巨大的投資建設(shè)規(guī)模不相匹配的是,很多投資主體對(duì)建設(shè)項(xiàng)目的管控能力相對(duì)薄弱,基于此,越來越多的投資主體認(rèn)識(shí)到跟蹤審計(jì)在建設(shè)項(xiàng)目管理中的重要作用。面對(duì)如此眾多的建設(shè)項(xiàng)目及其存在的突出問題,需要通過跟蹤審計(jì),在項(xiàng)目建設(shè)過程中,對(duì)建設(shè)項(xiàng)目全過程進(jìn)行持續(xù)監(jiān)督、過程糾偏,確保建設(shè)項(xiàng)目順利完成。建設(shè)項(xiàng)目跟蹤審計(jì)這種新型的審計(jì)方式,相比傳統(tǒng)的事后審計(jì)為主的審計(jì)模式,強(qiáng)調(diào)事先的預(yù)防和控制,克服了事后監(jiān)督的局限性,無論是在提高建設(shè)項(xiàng)目的投資效果還是從源頭上遏制腐敗行為上,都有著無可替代的作用。但由于跟蹤審計(jì)作為一項(xiàng)探索性的工作,其自身還存在許多局限和不足,無形中增加了跟蹤審計(jì)的風(fēng)險(xiǎn),所以在工作中我們還應(yīng)對(duì)跟蹤審計(jì)風(fēng)險(xiǎn)進(jìn)行有效管理。本文站在社會(huì)審計(jì)的角度,歸納了建設(shè)項(xiàng)目跟蹤審計(jì)風(fēng)險(xiǎn)現(xiàn)狀及問題,通過識(shí)別風(fēng)險(xiǎn)、評(píng)估風(fēng)險(xiǎn)、風(fēng)險(xiǎn)防范的風(fēng)險(xiǎn)管理流程,結(jié)合建設(shè)項(xiàng)目跟蹤審計(jì)的實(shí)際情況,采用文獻(xiàn)研究法、經(jīng)驗(yàn)總結(jié)等方法,總結(jié)歸納了建設(shè)項(xiàng)目跟蹤審計(jì)風(fēng)險(xiǎn)因素,引入風(fēng)險(xiǎn)矩陣方法對(duì)審計(jì)風(fēng)險(xiǎn)因素的風(fēng)險(xiǎn)等級(jí)進(jìn)行評(píng)估,針對(duì)建設(shè)項(xiàng)目全過程存在的主要審計(jì)風(fēng)險(xiǎn)因素,提出了相應(yīng)的風(fēng)險(xiǎn)規(guī)避策略。論文將建設(shè)項(xiàng)目跟蹤審計(jì)風(fēng)險(xiǎn)劃分為審計(jì)實(shí)施風(fēng)險(xiǎn)、審計(jì)質(zhì)量風(fēng)險(xiǎn)、被審計(jì)對(duì)象風(fēng)險(xiǎn),利用風(fēng)險(xiǎn)矩陣的方法對(duì)風(fēng)險(xiǎn)因素進(jìn)行整體排序,通過實(shí)例分析,得到某高校會(huì)議中心項(xiàng)目全過程跟蹤審計(jì)風(fēng)險(xiǎn)關(guān)鍵因素,并提出針對(duì)性的風(fēng)險(xiǎn)防范措施。
[Abstract]:In recent years, with the gradual expansion of fixed asset investment in China, a large number of funds have been invested in infrastructure, public works and other construction fields. Many investors have relatively weak control over construction projects. Based on this, more and more investors realize the important role of tracking audit in construction project management. Faced with so many construction projects and their outstanding problems, It is necessary to continuously supervise the whole process of the construction project in the process of project construction through tracking audit, and correct the process to ensure the smooth completion of the construction project. Construction project tracking audit is a new type of audit method. Compared with the traditional audit mode of post-audit, the emphasis on prevention and control in advance overcomes the limitation of post-audit, whether in improving the investment effect of construction projects or curbing corruption at the source. However, as an exploratory work, there are still many limitations and deficiencies in tracking audit itself, which increases the risk of tracking audit intangibly. Therefore, we should also effectively manage the risk of tracking audit. From the point of view of social audit, this paper summarizes the current situation and problems of the risk of tracking audit of construction project, and evaluates the risk by identifying the risk. The risk management process of risk prevention, combined with the actual situation of construction project tracking audit, using the methods of literature research and experience summary, summarizes the risk factors of construction project tracking audit. This paper introduces the risk matrix method to evaluate the risk grade of audit risk factors, aiming at the main audit risk factors existing in the whole process of the construction project. The paper divides the project tracking audit risk into audit implementation risk, audit quality risk, audit object risk, and uses the method of risk matrix to rank the risk factors as a whole. Through the analysis of an example, the key factors of tracking audit risk in the whole process of a conference center project in a university are obtained, and the corresponding risk prevention measures are put forward.
【學(xué)位授予單位】:首都經(jīng)濟(jì)貿(mào)易大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F239.63

【參考文獻(xiàn)】

相關(guān)期刊論文 前6條

1 王萬寬;;建設(shè)項(xiàng)目跟蹤審計(jì)風(fēng)險(xiǎn)成因分析及防范措施[J];工程經(jīng)濟(jì);2015年02期

2 常虹;高云莉;;風(fēng)險(xiǎn)矩陣方法在工程項(xiàng)目風(fēng)險(xiǎn)管理中的應(yīng)用[J];工業(yè)技術(shù)經(jīng)濟(jì);2007年11期

3 鄭曉容;;Excel在審計(jì)風(fēng)險(xiǎn)評(píng)價(jià)中的應(yīng)用[J];中國管理信息化(會(huì)計(jì)版);2007年09期

4 盛紅;;審計(jì)收費(fèi)對(duì)審計(jì)獨(dú)立性的影響[J];經(jīng)營與管理;2006年10期

5 朱啟超,匡興華,沈永平;風(fēng)險(xiǎn)矩陣方法與應(yīng)用述評(píng)[J];中國工程科學(xué);2003年01期

6 于亦銘;論審計(jì)風(fēng)險(xiǎn)與審計(jì)重要性的關(guān)系[J];審計(jì)研究;2000年04期

相關(guān)博士學(xué)位論文 前2條

1 陳建華;風(fēng)險(xiǎn)投資項(xiàng)目中風(fēng)險(xiǎn)的識(shí)別、評(píng)估與防范研究[D];暨南大學(xué);2007年

2 金德民;工程項(xiàng)目全壽命期風(fēng)險(xiǎn)管理系統(tǒng)理論及集成研究[D];天津大學(xué);2004年

相關(guān)碩士學(xué)位論文 前10條

1 蔣露;建設(shè)項(xiàng)目實(shí)施階段跟蹤審計(jì)風(fēng)險(xiǎn)評(píng)價(jià)體系研究[D];西華大學(xué);2012年

2 王維佳;政府投資建設(shè)項(xiàng)目跟蹤審計(jì)的風(fēng)險(xiǎn)研究[D];浙江大學(xué);2012年

3 高鳳麗;基于風(fēng)險(xiǎn)矩陣方法的風(fēng)險(xiǎn)投資項(xiàng)目風(fēng)險(xiǎn)評(píng)估研究[D];南京理工大學(xué);2004年

4 吳俊;建設(shè)項(xiàng)目前期管理中的風(fēng)險(xiǎn)管理研究[D];重慶大學(xué);2007年

5 代莎;高校基建審計(jì)風(fēng)險(xiǎn)管理研究[D];中國地質(zhì)大學(xué);2008年

6 楊麗芬;基于風(fēng)險(xiǎn)矩陣的房地產(chǎn)投資項(xiàng)目風(fēng)險(xiǎn)評(píng)估研究[D];山東科技大學(xué);2009年

7 劉瑋瑋;IPO審計(jì)風(fēng)險(xiǎn)研究[D];云南大學(xué);2015年

8 張輝;大型工程項(xiàng)目施工階段跟蹤審計(jì)風(fēng)險(xiǎn)評(píng)估[D];西安建筑科技大學(xué);2015年

9 羅路;建設(shè)工程項(xiàng)目施工階段跟蹤審計(jì)的風(fēng)險(xiǎn)管理[D];蘭州交通大學(xué);2015年

10 林昊;政府投資項(xiàng)目跟蹤審計(jì)風(fēng)險(xiǎn)研究[D];蘭州大學(xué);2016年



本文編號(hào):1589735

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jingjilunwen/sjlw/1589735.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶000b1***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com