天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

城市污水處理廠擴(kuò)容改造技術(shù)方案研究

發(fā)布時(shí)間:2018-04-27 02:07

  本文選題:擴(kuò)容 + 改造 ; 參考:《青島理工大學(xué)》2014年碩士論文


【摘要】:在發(fā)展迅速的城市,原有的污水處理廠設(shè)計(jì)處理規(guī)模較小且存在排放標(biāo)準(zhǔn)不夠嚴(yán)格的現(xiàn)象,新建污水處理廠又存在很多困難,對(duì)原有污水處理廠進(jìn)行擴(kuò)容升級(jí)改造成為解決這一問(wèn)題的首要方法,因此對(duì)城市污水處理廠擴(kuò)容的升級(jí)改造工程工藝的研究至關(guān)重要。本文主要以李村河污水處理廠擴(kuò)建工程為例對(duì)城市污水處理廠的擴(kuò)容升級(jí)改造的工藝進(jìn)行了研究。李村河污水處理廠所在的青島市是山東省藍(lán)色半島區(qū)域的經(jīng)濟(jì)中心和著名的旅游勝地,環(huán)境宜人,市民的節(jié)水意識(shí)強(qiáng),政府對(duì)污水處理工作極為重視。隨著城市化水平的提高,城鎮(zhèn)人口不斷增加,工業(yè)企業(yè)數(shù)量增多,城市污水排放量迅速增大,另外,隨著城市逐步完善市政管網(wǎng)建設(shè),市政管網(wǎng)收集的污水量不斷增多,進(jìn)入城市污水處理廠處理的污水量越來(lái)越大。就李村河污水處理廠而言,按照總體規(guī)劃和實(shí)際建設(shè)情況,李村河排水系統(tǒng)進(jìn)行了污水管線的完善配套,接入李村河污水廠的污水量持續(xù)增加,使李村河污水處理廠目前已超負(fù)荷運(yùn)行,并且污水系統(tǒng)上游已經(jīng)出現(xiàn)了溢流。如果生活污水和工業(yè)廢水不經(jīng)過(guò)污水處理設(shè)施的有效處理而直接排入河道,將會(huì)對(duì)環(huán)境造成嚴(yán)重的污染。 本文介紹了我國(guó)污水處理的現(xiàn)狀及發(fā)展趨勢(shì)、青島市的給水和排水系統(tǒng)現(xiàn)狀及規(guī)劃、李村河污水處理廠的現(xiàn)狀,確定了李村河污水處理廠擴(kuò)建工程的設(shè)計(jì)規(guī)模和進(jìn)出水水質(zhì),并對(duì)項(xiàng)目建設(shè)的必要性進(jìn)行了說(shuō)明。通過(guò)對(duì)擴(kuò)容升級(jí)改造常用方法的介紹和比選分析,,綜合考慮李村河污水處理廠現(xiàn)有條件、用地、處理效果、投資及運(yùn)行等因素,確定李村河污水處理廠擴(kuò)建工程的生物處理采用MBBR工藝。對(duì)于污泥處理系統(tǒng)來(lái)說(shuō),由于擴(kuò)建工程選址于李村河污水處理原有場(chǎng)地內(nèi),考慮到用地問(wèn)題,新建污泥處理設(shè)施存在較大的困難,所以擴(kuò)建工程的污泥處理采用污泥濃縮后直接脫水外運(yùn)處置的方案。對(duì)于臭氣的去除,通過(guò)對(duì)幾種常用除臭工藝的分析比選,確定采用城鎮(zhèn)污水廠全過(guò)程除臭工藝,同時(shí)在預(yù)處理階段的格柵間和污泥處理階段的脫水機(jī)房設(shè)置安裝離子除臭設(shè)備以保證除臭效果,另外根據(jù)青島市政府的統(tǒng)一要求,對(duì)整個(gè)污水處理廠的預(yù)處理階段、生物處理階段和污泥處理階段均進(jìn)行加蓋,防止臭氣的擴(kuò)散。擴(kuò)建工程包括新建處理規(guī)模4.5萬(wàn)m3/d處理設(shè)施和現(xiàn)有處理設(shè)施擴(kuò)容3.5萬(wàn)m3/d的相應(yīng)改造,本工程實(shí)施后,李村河污水處理廠的處理規(guī)模將達(dá)到25萬(wàn)m3/d。進(jìn)入李村河污水處理廠的污水經(jīng)過(guò)處理后,出水水質(zhì)滿足《城鎮(zhèn)污水處理廠污染物排放標(biāo)準(zhǔn)》(GB18918-2002)中的一級(jí)A標(biāo)準(zhǔn)的要求排入膠州灣。為有效循環(huán)利用水資源,減少水資源的浪費(fèi),本次擴(kuò)建工程還將配套建設(shè)7萬(wàn)m3/d的再生水外送設(shè)施。
[Abstract]:In rapidly developing cities, the original sewage treatment plants are designed and treated on a relatively small scale and there is a phenomenon that the discharge standards are not strict enough, and there are many difficulties in building new sewage treatment plants. The primary method to solve this problem is to upgrade and upgrade the original sewage treatment plant, so it is very important to study the upgrading and upgrading engineering technology of the urban sewage treatment plant. In this paper, the expansion and upgrading process of the municipal sewage treatment plant is studied with the example of the expansion project of Licuanhe sewage treatment plant. The city of Qingdao, where the sewage treatment plant is located, is an economic center and a famous tourist resort in Blue Peninsula area of Shandong Province. The environment is pleasant and the people have a strong sense of saving water. The government attaches great importance to the sewage treatment work. With the development of urbanization, the population of cities and towns is increasing, the number of industrial enterprises is increasing, and the discharge of municipal sewage is increasing rapidly. In addition, with the gradual improvement of municipal pipe network construction, the amount of sewage collected by municipal networks is increasing. The amount of sewage coming into the municipal sewage treatment plant is increasing. As far as the Lichunhe sewage treatment plant is concerned, according to the overall planning and actual construction situation, the drainage system of the Licun River has carried out a complete set of sewage pipelines, and the amount of sewage connected to the sewage treatment plant of the Licun River has continued to increase. The sewage treatment plant has been overloaded and overflow has occurred in the upper reaches of the sewerage system. If domestic and industrial wastewater are discharged directly into the river without the effective treatment of sewage treatment facilities, it will cause serious pollution to the environment. This paper introduces the present situation and development trend of sewage treatment in China, the present situation and planning of water supply and sewerage system in Qingdao, and the present situation of the sewage treatment plant of Li Cun he, and determines the design scale and the quality of incoming and outgoing water of the expansion project of the sewage treatment plant of Li Cun he. The necessity of project construction is explained. Through the introduction and comparison analysis of the common methods of capacity expansion and upgrading, the existing conditions, land use, treatment effect, investment and operation of Licuanhe sewage treatment Plant are considered synthetically. MBBR process was adopted in the biological treatment of the expansion project of Licuanhe sewage treatment Plant. For the sludge treatment system, due to the site selection of the expansion project in the original site of Licun River sewage treatment, considering the problem of land use, it is difficult to build a new sludge treatment facility. So the sludge treatment of the expansion project adopts the scheme of sludge enrichment and direct dewatering. For the removal of odor, through the analysis and selection of several commonly used deodorization processes, it is determined to adopt the whole process of deodorization in urban sewage plants. At the same time, ion deodorization equipment is installed between the grille in the pretreatment stage and in the dehydrator room in the sludge treatment stage to ensure the deodorization effect. In addition, according to the unified requirements of the Qingdao Municipal Government, the pretreatment stage of the whole sewage treatment plant is put in place. Both the biological treatment stage and the sludge treatment stage are covered to prevent the spread of odor. The expansion project includes the corresponding transformation of the new treatment scale of 45000 m3 / d and the existing treatment facility of 35000 m3 / d. After the implementation of the project, the treatment scale of the Licun River sewage treatment Plant will reach 250000 m3 / d. After treatment, the effluent quality of the wastewater from Licuanhe sewage treatment Plant meets the requirement of Grade A of the first Class A Standard of pollutants discharge Standard (GB18918-2002) of the Municipal sewage treatment Plant (GB18918-2002) and discharged into Jiaozhou Bay. In order to effectively recycle water resources and reduce waste of water resources, the expansion project will also build 70,000 m3 / d renewable water delivery facilities.
【學(xué)位授予單位】:青島理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:X703.1

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李勇;污水處理廠與火電廠在“三廢”處理上實(shí)現(xiàn)互補(bǔ)的可行性[J];中國(guó)給水排水;2001年12期

2 馮旭坤;深圳市將建龍崗大工業(yè)區(qū)污水處理廠[J];給水排水;2001年06期

3 張漢俊;曲阜污水處理廠即將竣工投產(chǎn)[J];給水排水;2001年07期

4 ;上海市青浦污水處理廠[J];上海城市管理職業(yè)技術(shù)學(xué)院學(xué)報(bào);2001年05期

5 劉恒云;污水處理廠的防爆[J];電氣防爆;2001年03期

6 顧劍;方莊污水處理廠自動(dòng)化控制的探索[J];市政技術(shù);2001年03期

7 張潤(rùn)蓮;江門市污水處理廠規(guī)劃方案的協(xié)調(diào)[J];五邑大學(xué)學(xué)報(bào)(自然科學(xué)版);2001年01期

8 李文樸,趙永杰,王蕭;淺談城市污水處理廠運(yùn)行機(jī)制和發(fā)展模式[J];河北建筑工程學(xué)院學(xué)報(bào);2001年03期

9 宋國(guó)君,谷一楨,劉永;中央政府投資城市污水處理廠的理論和實(shí)證分析[J];上海環(huán)境科學(xué);2002年11期

10 徐衛(wèi)光,楊長(zhǎng)嶺,孫曉森;淺談污水處理廠建設(shè)的投資控制[J];山東環(huán)境;2002年03期

相關(guān)會(huì)議論文 前10條

1 翁奕華;;淺談污水處理廠電氣設(shè)備的維護(hù)和維修[A];2007年全國(guó)給水排水技術(shù)信息網(wǎng)成立三十五周年紀(jì)念專集暨年會(huì)論文集[C];2007年

2 曲鳳龍;蘭玲;;本鋼污水處理廠運(yùn)行中存在問(wèn)題與解決對(duì)策[A];全國(guó)冶金節(jié)水與廢水利用技術(shù)研討會(huì)文集[C];2009年

3 胡正君;史亞利;牛紅云;蔡亞岐;;北京市污水處理廠合成麝香污染現(xiàn)狀調(diào)查研究[A];中國(guó)化學(xué)會(huì)第27屆學(xué)術(shù)年會(huì)第02分會(huì)場(chǎng)摘要集[C];2010年

4 杜兆林;鄭彤;劉麗艷;王鵬;白楊;秦世麗;李一凡;;污水處理廠中抗生素去除情況研究[A];持久性有機(jī)污染物論壇2011暨第六屆持久性有機(jī)污染物全國(guó)學(xué)術(shù)研討會(huì)論文集[C];2011年

5 李藝;;酒仙橋污水處理廠工程概況[A];中國(guó)土木工程學(xué)會(huì)水工業(yè)分會(huì)第四屆理事會(huì)第一次會(huì)議論文集[C];2002年

6 許勁;;關(guān)于城市污水處理廠設(shè)計(jì)的若干問(wèn)題討論[A];中國(guó)土木工程學(xué)會(huì)水工業(yè)分會(huì)第四屆理事會(huì)第一次會(huì)議論文集[C];2002年

7 王巖;;天津咸陽(yáng)路污水處理廠自控系統(tǒng)[A];中國(guó)電工技術(shù)學(xué)會(huì)第八屆學(xué)術(shù)會(huì)議論文集[C];2004年

8 劉軍;包琰潔;;南陽(yáng)市污水處理廠運(yùn)行實(shí)踐[A];科技、工程與經(jīng)濟(jì)社會(huì)協(xié)調(diào)發(fā)展——河南省第四屆青年學(xué)術(shù)年會(huì)論文集(下冊(cè))[C];2004年

9 馮生華;;把好城市污水處理廠建設(shè)前期工作質(zhì)量關(guān)[A];中國(guó)水污染防治技術(shù)裝備論文集(第五期)[C];1999年

10 ;拼裝式小城鎮(zhèn)污水處理廠工程簡(jiǎn)介[A];全國(guó)小城鎮(zhèn)污水處理技術(shù)(設(shè)備)交流與工程咨詢研討會(huì)論文集[C];2003年

相關(guān)重要報(bào)紙文章 前10條

1 本報(bào)記者 林醇;污水處理廠 家園守護(hù)者[N];中國(guó)環(huán)境報(bào);2003年

2 記者 唐紹華 鄢祖海;武漢將加快污水處理廠建設(shè)[N];中國(guó)環(huán)境報(bào);2003年

3 趙志剛;博興污水處理廠成為國(guó)家示范工程[N];中國(guó)環(huán)境報(bào);2003年

4 林銀來(lái);福建將首拍污水處理廠特許經(jīng)營(yíng)權(quán)[N];中國(guó)環(huán)境報(bào);2003年

5 葉子;小紅門污水處理廠治污工程啟動(dòng)[N];中國(guó)環(huán)境報(bào);2003年

6 記者 王婭;徐州污水處理廠1.6億轉(zhuǎn)讓經(jīng)營(yíng)權(quán)30年[N];中國(guó)環(huán)境報(bào);2004年

7 記者 鄢祖海;武漢年內(nèi)開(kāi)工6座污水處理廠[N];中國(guó)環(huán)境報(bào);2004年

8 魏?jiǎn)P(yáng);長(zhǎng)沙5年內(nèi)將建設(shè)5座污水處理廠[N];中國(guó)環(huán)境報(bào);2004年

9 史文靜 李若玲 周建萍;加強(qiáng)對(duì)城市污水處理廠的監(jiān)管[N];中國(guó)環(huán)境報(bào);2004年

10 榮林 周忱 何杰;香港榮氏投資山東泰州污水處理廠[N];中國(guó)環(huán)境報(bào);2004年

相關(guān)博士學(xué)位論文 前10條

1 盛彥清;廣州市典型污染河道與城市污水處理廠中惡臭有機(jī)硫化物的初步研究[D];中國(guó)科學(xué)院研究生院(廣州地球化學(xué)研究所);2007年

2 蔣茹;基于不確定性理論與方法的城市污水處理廠優(yōu)化決策研究[D];湖南大學(xué);2007年

3 桂紅艷;城市污水處理廠對(duì)周邊環(huán)境污染及防治初步研究[D];中國(guó)科學(xué)院研究生院(廣州地球化學(xué)研究所);2007年

4 李曉東;城市污水處理廠數(shù)據(jù)挖掘及相關(guān)技術(shù)研究[D];湖南大學(xué);2007年

5 王金鶴;城鎮(zhèn)污水處理廠中溫室氣體的釋放研究[D];山東大學(xué);2011年

6 陳立愛(ài);氧化溝工藝污水處理廠優(yōu)化與綜合評(píng)價(jià)研究[D];合肥工業(yè)大學(xué);2013年

7 王凌云;深圳河及沿岸污水處理廠典型雌激素微生物轉(zhuǎn)化研究[D];清華大學(xué);2011年

8 王曉慧;城市污水處理廠中氨氧化菌及細(xì)菌群落結(jié)構(gòu)與功能研究[D];清華大學(xué);2010年

9 湯迎;城市污水處理廠內(nèi)藥品及個(gè)人護(hù)理品的賦存特征與去除機(jī)理[D];湖南大學(xué);2014年

10 李俊;微生物菌劑對(duì)污水處理廠污泥減量的影響研究[D];西南大學(xué);2008年

相關(guān)碩士學(xué)位論文 前10條

1 隋岳峰;東海污水處理廠建設(shè)項(xiàng)目可行性研究[D];中國(guó)海洋大學(xué);2009年

2 曾向前;南太子湖污水處理廠水質(zhì)水量分析與預(yù)測(cè)[D];武漢理工大學(xué);2005年

3 錢進(jìn);改良A~2/O工藝污水處理廠調(diào)試和技術(shù)評(píng)估探討[D];合肥工業(yè)大學(xué);2006年

4 周凌;城市污水處理廠環(huán)境效益的生命周期分析[D];重慶大學(xué);2006年

5 徐文剛;合肥市朱磚井污水處理廠工程建設(shè)研究[D];天津大學(xué);2004年

6 鄧光明;綿陽(yáng)塘汛污水處理廠自動(dòng)化系統(tǒng)開(kāi)發(fā)研究[D];電子科技大學(xué);2010年

7 楊碩;污水處理廠績(jī)效評(píng)價(jià)的多目標(biāo)樹(shù)圖分析[D];昆明理工大學(xué);2010年

8 張宏;株洲市河西污水處理廠設(shè)計(jì)方案[D];西北農(nóng)林科技大學(xué);2010年

9 蔚洋;河南省城鎮(zhèn)污水處理廠能耗現(xiàn)狀調(diào)查分析[D];鄭州大學(xué);2009年

10 紀(jì)楠;城市污水處理廠綜合評(píng)價(jià)指標(biāo)體系和評(píng)價(jià)方法的研究[D];哈爾濱工業(yè)大學(xué);2011年



本文編號(hào):1808689

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/jingjilunwen/quyujingjilunwen/1808689.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶de5f2***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com