建筑信息模型(BIM)與工程項(xiàng)目造價(jià)知識(shí)數(shù)據(jù)的關(guān)聯(lián)及應(yīng)用研究
本文選題:建筑信息模型 切入點(diǎn):工程造價(jià) 出處:《深圳大學(xué)》2016年碩士論文
【摘要】:回顧我國(guó)的工程造價(jià)管理模式,其經(jīng)歷了起初的憑經(jīng)驗(yàn)估價(jià)的手工繪圖計(jì)算,再到現(xiàn)在采用清單模式和定額模式估價(jià)的電腦繪圖計(jì)算。其造價(jià)計(jì)量模式雖然正在不斷的完善提高,但是整個(gè)工程造價(jià)行業(yè)的信息化、精細(xì)化、智能化管理水平與我國(guó)經(jīng)濟(jì)、社會(huì)發(fā)展水平仍然存在著很大的差距,遠(yuǎn)遠(yuǎn)落后于行業(yè)的發(fā)展,F(xiàn)階段的工程造價(jià)管理模式基本都存在著工作效率低下、計(jì)價(jià)精度不高且誤差大等特點(diǎn),再加上造價(jià)各階段計(jì)算過(guò)程的相互獨(dú)立、計(jì)價(jià)模式的區(qū)域性差異、造價(jià)數(shù)據(jù)的滯后以及造價(jià)數(shù)據(jù)共享困難等原因,使得造價(jià)管理方法從工程項(xiàng)目概算開(kāi)始就已經(jīng)與實(shí)際脫節(jié),頻繁出現(xiàn)“三超”、二次調(diào)價(jià)索賠等一系列問(wèn)題。隨著建筑信息模型(BIM)的提出和發(fā)展,基于BIM的造價(jià)管理研究逐漸受到各學(xué)者和業(yè)界的關(guān)注。以參數(shù)化、可視化、面向?qū)ο鬄樘攸c(diǎn)的BIM技術(shù)是對(duì)貫穿建筑全生命周期的幾何、物理、功能信息的數(shù)字化表示。其不僅包含有建筑構(gòu)件的幾何數(shù)據(jù),更有大量可擴(kuò)展的工程數(shù)據(jù)。BIM技術(shù)不僅能保證造價(jià)數(shù)據(jù)的實(shí)時(shí)準(zhǔn)確性,實(shí)現(xiàn)造價(jià)知識(shí)數(shù)據(jù)共享和部門(mén)之間的協(xié)同,而且在應(yīng)對(duì)設(shè)計(jì)變更、提高算量精度等方面有著積極的意義。它的出現(xiàn),為解決我國(guó)造價(jià)行業(yè)中的問(wèn)題提供了一種途徑。本文主要就如何將工程造價(jià)知識(shí)數(shù)據(jù)與建筑信息模型進(jìn)行關(guān)聯(lián),從而提高我國(guó)工程項(xiàng)目造價(jià)管理信息化、精細(xì)化水平,為解決現(xiàn)階段工程造價(jià)管理中存在的問(wèn)題提供一定的途徑方法,對(duì)以下方面進(jìn)行了探討及研究:分析工程造價(jià)相關(guān)數(shù)據(jù)構(gòu)成。通過(guò)對(duì)工程造價(jià)數(shù)據(jù)結(jié)構(gòu)之間的關(guān)系的深入研究,提出工程造價(jià)知識(shí)數(shù)據(jù)構(gòu)成體系,并選擇關(guān)系數(shù)據(jù)庫(kù)SQLServer進(jìn)行數(shù)據(jù)庫(kù)設(shè)計(jì),作為造價(jià)知識(shí)數(shù)據(jù)的存儲(chǔ)載體;贐IM平臺(tái)構(gòu)建適用于工程造價(jià)的建筑信息模型。通過(guò)對(duì)當(dāng)前BIM軟件平臺(tái)的對(duì)比分析,選取核心BIM軟件平臺(tái),深入探討基于工程造價(jià)數(shù)據(jù)的建筑信息模型架構(gòu),構(gòu)建模型與數(shù)據(jù)信息之間的聯(lián)系,形成完整的工程造價(jià)建筑信息模型應(yīng)用框架。結(jié)合工程造價(jià)管理的具體需求和計(jì)算機(jī)科學(xué)的解決方案,對(duì)核心BIM軟件Revit進(jìn)行適用于工程造價(jià)建筑信息模型的二次開(kāi)發(fā),包括造價(jià)知識(shí)數(shù)據(jù)庫(kù)的訪(fǎng)問(wèn)和數(shù)據(jù)的更新,信息模型構(gòu)件造價(jià)定額資源數(shù)據(jù)的獲取以及模型構(gòu)件工程量的統(tǒng)計(jì),力圖促進(jìn)建筑信息模型在工程造價(jià)領(lǐng)域中的應(yīng)用,提高工作效率,提升精確性。結(jié)合案例進(jìn)行建筑信息模型技術(shù)在工程造價(jià)的應(yīng)用探究,展示二次開(kāi)發(fā)后的軟件應(yīng)用界面及擴(kuò)展功能,進(jìn)而說(shuō)明建筑信息模型與工程造價(jià)數(shù)據(jù)關(guān)聯(lián)實(shí)現(xiàn)后的應(yīng)用。
[Abstract]:This paper reviews the engineering cost management model in our country. It has experienced the manual drawing calculation based on experience at first, and then the computer drawing calculation based on list model and quota mode.Although the mode of cost measurement is improving continuously, there is still a big gap between the level of informatization, refinement and intelligent management of the whole engineering cost industry and the level of economic and social development of our country.Far behind the development of the industry.At the present stage, the engineering cost management mode has the characteristics of low working efficiency, low valuation accuracy and large error. In addition, the calculation process of each stage of the construction cost is independent of each other, and the regional difference of the pricing mode.Because of the lag of cost data and the difficulty of sharing cost data, the cost management method has been out of touch with the reality from the beginning of the project budget estimate, and a series of problems such as "three super" and the second price adjustment claim are frequently appeared.With the development of building information model (BIM), the research of cost management based on BIM has been paid more and more attention by scholars and industry.The BIM technology, which is characterized by parameterization, visualization and object oriented, is a digital representation of geometric, physical and functional information throughout the life cycle of architecture.It not only contains geometric data of building components, but also has a large amount of extensible engineering data. BIM technology can not only guarantee the real-time accuracy of cost data, realize cost knowledge data sharing and coordination among departments, but also respond to design changes.It is of great significance to improve the accuracy of calculation.Its appearance provides a way to solve the problems in the cost industry of our country.This paper mainly discusses how to relate the engineering cost knowledge data with the building information model so as to improve the informatization and refinement level of the project cost management in our country.In order to solve the problems existing in the current project cost management, this paper discusses and studies the following aspects: analysis of the construction cost related data composition.Based on the deep study of the relationship between the construction cost data structure, the paper puts forward the construction system of the engineering cost knowledge data, and chooses the relational database SQLServer to design the database as the storage carrier of the cost knowledge data.Based on BIM platform, a building information model suitable for construction cost is constructed.Through the comparative analysis of the current BIM software platform, the core BIM software platform is selected, and the architecture of the building information model based on the engineering cost data is discussed in depth, and the relationship between the model and the data information is constructed.Form a complete construction cost information model application framework.Combined with the specific requirements of engineering cost management and the solution of computer science, the core BIM software Revit is applied to the secondary development of the construction cost information model, including the access to the cost knowledge database and the updating of the data.The acquisition of information model component cost quota resource data and the statistics of model component engineering quantity try to promote the application of building information model in the field of engineering cost improve the working efficiency and improve the accuracy.In this paper, the application of building information model technology in engineering cost is explored, and the application interface and extended function of the software after secondary development are demonstrated, and the application of building information model and engineering cost data is explained.
【學(xué)位授予單位】:深圳大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類(lèi)號(hào)】:TU17;TU723.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孫靜佳;;淺議如何控制工程項(xiàng)目造價(jià)[J];廣東建材;2006年02期
2 韓志宏;;工程項(xiàng)目造價(jià)風(fēng)險(xiǎn)模糊評(píng)估模型研究[J];長(zhǎng)沙鐵道學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2007年03期
3 王義舉;;淺析工程項(xiàng)目造價(jià)的控制途徑[J];建材與裝飾(中旬刊);2008年06期
4 趙勝民;范蓬震;劉小燕;;淺談工程項(xiàng)目造價(jià)控制措施[J];建筑設(shè)計(jì)管理;2010年01期
5 葉雪峰;;建筑工程項(xiàng)目造價(jià)預(yù)測(cè)研究[J];技術(shù)與市場(chǎng);2011年01期
6 林曉玲;;淺論工程項(xiàng)目造價(jià)的全過(guò)程管理[J];現(xiàn)代商業(yè);2013年12期
7 劉菊;;工程項(xiàng)目造價(jià)全過(guò)程管理與控制[J];科技與企業(yè);2013年14期
8 王茍生;劉錫美;羅擁軍;;推行“三制” 嚴(yán)把“三關(guān)”——切實(shí)加強(qiáng)工程項(xiàng)目造價(jià)預(yù)(決)算審計(jì)工作[J];審計(jì)與理財(cái);2013年08期
9 林自立;;淺談業(yè)主對(duì)工程項(xiàng)目造價(jià)的控制和管理工作[J];江西建材;2014年10期
10 胡瑞新;;淺談建筑工程項(xiàng)目造價(jià)的有效控制[J];沿海企業(yè)與科技;2009年03期
相關(guān)會(huì)議論文 前4條
1 牛東曉;乞建勛;;工程項(xiàng)目造價(jià)的變結(jié)構(gòu)神經(jīng)網(wǎng)絡(luò)改進(jìn)的預(yù)測(cè)方法研究[A];2001年中國(guó)管理科學(xué)學(xué)術(shù)會(huì)議論文集[C];2001年
2 張欣紅;李慧斌;;如何有效控制工程項(xiàng)目造價(jià)[A];土木建筑學(xué)術(shù)文庫(kù)(第12卷)[C];2009年
3 ;電監(jiān)會(huì)發(fā)布“十一五”期間投產(chǎn)電力工程項(xiàng)目造價(jià)情況通報(bào)[A];《電站信息》2012年第3期[C];2012年
4 劉相靈;;公路工程項(xiàng)目造價(jià)控制方法研究[A];公路交通與建設(shè)論壇(2011)[C];2003年
相關(guān)重要報(bào)紙文章 前4條
1 MEB記者 崔宏薇;2011—2012年投產(chǎn)電力工程項(xiàng)目造價(jià)公布[N];機(jī)電商報(bào);2014年
2 記者 李欣智;國(guó)家能源局發(fā)布2011~2012年投產(chǎn)電力工程項(xiàng)目造價(jià)情況[N];中國(guó)電力報(bào);2014年
3 張虹;四川推廣建立工地民工學(xué)校[N];建筑時(shí)報(bào);2007年
4 段乾軍;嚴(yán)把工程項(xiàng)目造價(jià)結(jié)審關(guān)[N];伊犁日?qǐng)?bào)(漢);2007年
相關(guān)碩士學(xué)位論文 前7條
1 姜玉梁;南方電網(wǎng)SBD工程項(xiàng)目造價(jià)研究[D];華南理工大學(xué);2015年
2 吳曉波;建筑信息模型(BIM)與工程項(xiàng)目造價(jià)知識(shí)數(shù)據(jù)的關(guān)聯(lián)及應(yīng)用研究[D];深圳大學(xué);2016年
3 李字全;工程項(xiàng)目造價(jià)測(cè)算方法研究[D];西南石油大學(xué);2012年
4 張光明;工程項(xiàng)目造價(jià)管理方法的研究[D];大慶石油學(xué)院;2007年
5 崔征;供電公司工程項(xiàng)目造價(jià)控制方法及應(yīng)用研究[D];華北電力大學(xué)(北京);2010年
6 周莉;建筑工程項(xiàng)目造價(jià)估算模型研究[D];中南林業(yè)科技大學(xué);2007年
7 馮文生;四川省公路工程項(xiàng)目造價(jià)控制問(wèn)題研究[D];長(zhǎng)安大學(xué);2001年
,本文編號(hào):1713405
本文鏈接:http://www.sikaile.net/jingjilunwen/jiliangjingjilunwen/1713405.html