基于關(guān)鍵鏈法的項(xiàng)目群進(jìn)度計(jì)劃優(yōu)化研究
[Abstract]:In recent years, in the field of construction project schedule management, (Critical Chain Method, (key chain method) has become a research hotspot. By comparing the key chain method with the traditional schedule planning method, this paper expounds the connotation, theoretical basis and basic idea of the key chain method. The process of applying the key chain method in the project group schedule management is clarified. Firstly, the priority of each project in the project group is determined under the condition of resource constraint. In this paper, a set of project priority evaluation index system is constructed. Using grey relational analysis to determine the priority of each item in the project group; Then, according to the evaluation results of priority, the key chain of each project in the project group is determined in turn, which is mainly based on the critical path method and ACTIM criterion. Finally, the size of the project buffer and the import buffer on the key chain are determined according to the position weight coefficient and the risk elasticity coefficient of each process in the key path of the project. Through the above analysis, this paper optimizes the progress plan of the construction project group by using the key chain. Based on the grey relational analysis, the key chains of three construction projects under resource constraints are determined, and the size of the project buffer and the import buffer on the critical chain are determined. It is concluded that the critical chain method shortens the duration of the project group composed of three projects, and the planned duration of each project is also greatly reduced, which ensures the realization of the optimization goal of the project group schedule plan. The method of this paper is of great practical significance in optimizing the allocation of resources, utilizing resources effectively, honouring the promise of contract on time, quality and quantity, ensuring the economic benefit of the enterprise, improving the customer satisfaction and promoting the brand value of the enterprise itself at the same time.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU722
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 胡晨;徐哲;于靜;;基于工期分布和多資源約束的關(guān)鍵鏈緩沖區(qū)大小計(jì)算方法[J];系統(tǒng)管理學(xué)報(bào);2015年02期
2 李明;徐哲;于靜;;基于帕金森定律的關(guān)鍵鏈緩沖設(shè)置方法[J];計(jì)算機(jī)集成制造系統(tǒng);2013年12期
3 李海凌;劉克劍;陶學(xué)明;;工程項(xiàng)目群資源管理的HTCPN建模與優(yōu)化[J];控制工程;2013年05期
4 張靜文;李若楠;;關(guān)鍵鏈項(xiàng)目調(diào)度方法研究評(píng)述綜述與評(píng)論[J];控制與決策;2013年09期
5 申云;熊建芳;邵景奎;;多項(xiàng)目管理優(yōu)先級(jí)評(píng)價(jià)指標(biāo)體系與評(píng)價(jià)方法研究[J];無(wú)錫商業(yè)職業(yè)技術(shù)學(xué)院學(xué)報(bào);2013年04期
6 張春生;嚴(yán)廣樂(lè);;基于資源時(shí)間因子的DSM項(xiàng)目群進(jìn)度優(yōu)化研究[J];運(yùn)籌與管理;2013年04期
7 張雙甜;李欣蘭;;項(xiàng)目群瓶頸資源識(shí)別方法[J];工程管理學(xué)報(bào);2013年03期
8 別黎;崔南方;趙雁;張小明;;關(guān)鍵鏈多項(xiàng)目調(diào)度中分散式能力約束緩沖設(shè)置法[J];管理工程學(xué)報(bào);2013年02期
9 耿顯民;劉志嘉;;多項(xiàng)目管理中依據(jù)資源的馬氏鏈擇優(yōu)[J];系統(tǒng)工程理論與實(shí)踐;2012年09期
10 李波;翁?hào)|風(fēng);韋灼彬;;工程進(jìn)度控制關(guān)鍵鏈法應(yīng)用分析[J];工程管理學(xué)報(bào);2012年03期
相關(guān)博士學(xué)位論文 前1條
1 李默;工程施工企業(yè)項(xiàng)目組合優(yōu)選與組織模式研究[D];山東科技大學(xué);2011年
相關(guān)碩士學(xué)位論文 前3條
1 王續(xù);基于戰(zhàn)略視角的建筑企業(yè)項(xiàng)目群管理模式研究[D];首都經(jīng)濟(jì)貿(mào)易大學(xué);2013年
2 艾鑫;多項(xiàng)目管理中資源沖突及優(yōu)化配置研究[D];重慶大學(xué);2011年
3 趙曉鳳;基于多項(xiàng)目管理的戰(zhàn)略實(shí)施研究[D];天津理工大學(xué);2006年
,本文編號(hào):2316257
本文鏈接:http://www.sikaile.net/jingjilunwen/jianzhujingjilunwen/2316257.html