航天工業(yè)產(chǎn)業(yè)園區(qū)建設(shè)項(xiàng)目業(yè)主方項(xiàng)目管理研究
[Abstract]:China's modern engineering project management has a history of more than 20 years, and the management level has made great progress, but there are still some problems. For example, laws and regulations need to be further improved. The supervision mechanism still needs to be perfected and so on. In general, in order to reach the level of foreign modern engineering project management, China's modern engineering project management still needs to make further efforts to overcome a certain gap. In recent years, with the economic development of our country, various construction projects, especially the construction of industrial parks are in full swing, but in the process of construction of industrial parks, The contradiction between the owner of the project and other participants of the project appears constantly. The master planner and organizer of the project often fail to complete the project on time due to the lack of management. Through literature investigation, field investigation and case analysis, this paper takes the project management of the owner of Zhenjiang Industrial Park as the research object, and applies the basic theory of project management. Based on the analysis of the management status and deficiency of the owner of the construction project, the author puts forward the management mode of the owner side which is suitable for the project. And according to the proposed management model, Zhenjiang Industrial Park construction project owners according to the project progress stage how to organize the implementation of a more in-depth discussion; Finally, through the analysis and research, put forward the implementation of management measures for the owner of the construction project. Taking Zhenjiang Aerospace Industry Construction Project as the research background, the owner side management model proposed in this paper can provide a valuable management model for other aerospace industry construction projects. At the same time, the key points of the implementation of the management model and the key elements such as schedule, cost, safety and quality control measures can ensure the smooth implementation of the management model. It is believed that this management model can not only improve the economic benefit and management efficiency of Zhenjiang Industrial Park, but also provide valuable reference for the construction of other spaceflight industrial parks.
【學(xué)位授予單位】:哈爾濱工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類號(hào)】:TU712.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉洪志;;工程各階段業(yè)主方項(xiàng)目管理的側(cè)重點(diǎn)[J];建材與裝飾;2016年04期
2 孫磊;;市政工程業(yè)主方項(xiàng)目管理問(wèn)題分析[J];建材與裝飾;2015年46期
3 梁振輝;許婷華;;地產(chǎn)公司管理模型分析[J];工程建設(shè)與設(shè)計(jì);2015年08期
4 陸瑜;;矩陣式組織結(jié)構(gòu)在高校學(xué)生黨支部建設(shè)中的應(yīng)用[J];寧夏師范學(xué)院學(xué)報(bào);2014年05期
5 佟明紀(jì);;試舉例說(shuō)明工程項(xiàng)目前期策劃的重要性[J];中小企業(yè)管理與科技(上旬刊);2014年06期
6 鄭樝樝;;工程建設(shè)中業(yè)主方項(xiàng)目管理存在的問(wèn)題及對(duì)策[J];價(jià)值工程;2014年11期
7 宮艷娜;;業(yè)主方工程變更管控探討[J];合作經(jīng)濟(jì)與科技;2013年14期
8 蒲靜;;淺談業(yè)主方工程項(xiàng)目管理存在的問(wèn)題及改進(jìn)建議[J];吉林水利;2013年04期
9 常紅霞;;工程項(xiàng)目管理模式的比較研究[J];中華民居(下旬刊);2012年11期
10 李秋麗;;論工程項(xiàng)目的前期策劃[J];神州;2012年20期