軌道交通機電安裝工程的設(shè)計變更研究

發(fā)布時間:2018-08-27 11:32
【摘要】:我國城市軌道交通工程建設(shè)正在大規(guī)模地開展,為了能給乘客提供舒適的乘車環(huán)境,軌道交通工程建設(shè)越來越強調(diào)人性化設(shè)計。通風(fēng)空調(diào)、給排水、低壓配電三個專業(yè)工程與乘客的乘車舒適度密切相關(guān),越來越受到建設(shè)單位的重視。軌道交通項目機電安裝(風(fēng)、水、電)工程的專業(yè)接口較多、施工情況復(fù)雜,經(jīng)常導(dǎo)致大量的設(shè)計變更,由此大幅度增加了業(yè)主的投資,嚴(yán)重影響了項目管理目標(biāo)的實現(xiàn)。國內(nèi)外關(guān)于軌道交通項目和機電安裝工程變更管理的相關(guān)研究較多,但是,基于實際案例、對軌道交通機電安裝工程變更問題進行定量分析的研究還很少。本文以蘇州市軌道交通1、2號線為研究對象,主要采用案例分析和問卷調(diào)查的方法進行研究。首先,閱讀國內(nèi)外的相關(guān)文獻,綜述軌道交通機電安裝工程設(shè)計變更現(xiàn)有的研究成果,并闡述軌道交通機電安裝工程的概念。其次,統(tǒng)計分析蘇州市軌道交通1號線機電安裝工程設(shè)計變更,揭示蘇州市軌道交通1號線設(shè)計變更的管理問題。通過問卷調(diào)查的方式,對機電安裝的設(shè)計人員進行調(diào)查,驗證蘇州市軌道交通1號線的設(shè)計變更統(tǒng)計分析結(jié)論。再次,結(jié)合調(diào)查和統(tǒng)計的結(jié)果,分析蘇州市軌道交通1、2號線設(shè)計變更的管理經(jīng)驗和措施。最后,對比分析蘇州市軌道交通1、2號線的設(shè)計變更次數(shù)和金額,驗證設(shè)計變更管理措施的有效性。研究結(jié)果表明,在軌道交通機電安裝工程中,低壓配電工程是最容易發(fā)生設(shè)計變更的專業(yè)(53.1%)。設(shè)計質(zhì)量問題是發(fā)生設(shè)計變更最主要的原因。接口資料的準(zhǔn)確性是影響設(shè)計質(zhì)量最主要的因素(43.3%)。為了控制設(shè)計變更,蘇州市軌道交通業(yè)主方采取了明確設(shè)計的專業(yè)接口、制定合理的設(shè)計周期、加強圖紙審查和技術(shù)交底等控制措施。實踐證明,相對于蘇州市軌道交通1、2號線由于設(shè)計質(zhì)量問題引起的設(shè)計變更得到了有效的控制。其中,蘇州市軌道交通2號線機電工程設(shè)計變更的次數(shù)與蘇州市軌道交通1號線相比下降了65.3%,而蘇州市軌道交通2號線設(shè)計變更總額僅為蘇州市軌道交通1號線的43.2%。本文的研究成果具有一定的局限性。在研究過程中,作者僅收集了30多份調(diào)查問卷,不能反映參與蘇州市軌道交通機電安裝工程設(shè)計人員的總體意見;此外,哪些管理措施最有效地控制了蘇州軌道交通2號線的設(shè)計變更,沒有進行定量地分析。這些將在以后的研究中進一步加強。
[Abstract]:The construction of urban rail transit in China is being carried out on a large scale. In order to provide passengers with a comfortable ride environment, the construction of rail transit engineering is emphasizing more and more humanized design. Ventilation and air conditioning, water supply and drainage, low voltage distribution are closely related to passenger comfort, and are paid more and more attention by construction units. The mechatronic installation (wind, water, electricity) project of rail transit project has many professional interfaces and complex construction conditions, which often leads to a large number of design changes, which greatly increases the investment of the owner and seriously affects the realization of project management objectives. There are many researches on the change management of rail transit project and mechatronic installation project at home and abroad. However, based on the actual cases, the quantitative analysis of the change problem of the mechatronic installation project of rail transit is rare. In this paper, Suzhou Rail Transit Line 1, 2 as the research object, mainly using the method of case analysis and questionnaire survey. First of all, this paper reviews the related literature at home and abroad, summarizes the existing research results of the design change of the mechatronic installation engineering of rail transit, and expounds the concept of the mechatronics installation engineering of the rail transit. Secondly, the design changes of mechanical and electrical installation of Suzhou Rail Transit Line 1 are analyzed statistically, and the management problems of the design changes of Suzhou Rail Transit Line 1 are revealed. By means of questionnaire survey, the authors investigated the designers of mechanical and electrical installation, and verified the statistical analysis conclusions of the design changes of Suzhou Rail Transit Line 1. Thirdly, combined with the results of investigation and statistics, this paper analyzes the management experience and measures of the design change of Suzhou Rail Transit Line 1 and 2. Finally, the design change times and the amount of money of Suzhou Rail Transit Line 1 and 2 are compared and analyzed to verify the effectiveness of the design change management measures. The results show that the low-voltage distribution engineering is the most prone to design change (53.1%) in the mechatronics installation project of rail transit. Design quality problem is the main reason for design change. The accuracy of interface data is the most important factor affecting the design quality (43.3%). In order to control the design change, the owner of Suzhou rail transit has adopted the professional interface that is clearly designed, established a reasonable design cycle, and strengthened the control measures such as drawing examination and technical understatement. It is proved by practice that the design change caused by the design quality problem of Line 2 has been effectively controlled in comparison with Suzhou Rail Transit No. 1. Among them, the number of mechatronic engineering design changes of Suzhou rail transit line 2 has decreased by 65.3and 65.3than that of Suzhou rail transit line 1, while the total design change of Suzhou rail transit line 2 is only 43.2 percent of Suzhou rail transit line 1. The research results of this paper have some limitations. In the course of the research, the author only collected more than 30 questionnaires, which can not reflect the overall opinions of the designers involved in the mechanical and electrical installation engineering of Suzhou rail transit. Which management measures most effectively control the design changes of Suzhou Rail Transit Line 2 without quantitative analysis. These will be further strengthened in future studies.
【學(xué)位授予單位】:蘇州科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U231.3

【相似文獻】

相關(guān)期刊論文 前10條

1 黃健;;論設(shè)計變更的管理[J];遼寧建材;2006年02期

2 李玉玲;;淺談工程中的設(shè)計變更[J];黑龍江科技信息;2007年05期

3 楊瑞林;;淺談如何加強設(shè)計變更的管理工作[J];山西建筑;2010年10期

4 于亮,王族友;高速公路設(shè)計變更的原因分析與對策[J];華東公路;2001年05期

5 李曉東;論設(shè)計變更管理[J];杭州科技;2002年04期

6 王家海;強化設(shè)計變更管理 控制鐵路工程投資[J];鐵路工程造價管理;2002年01期

7 郭鐵惠;設(shè)計變更對高速公路施工階段投資的影響[J];建設(shè)監(jiān)理;2003年02期

8 張璞珍;;加強設(shè)計變更管理 提高建設(shè)項目效益[J];建設(shè)監(jiān)理;2006年05期

9 朱艷麗;仇旭;;水利工程項目設(shè)計變更管理方式初探[J];吉林水利;2007年06期

10 魏兵;;論設(shè)計變更[J];商品與質(zhì)量;2009年S3期

相關(guān)會議論文 前7條

1 周小娟;;淺談在虹橋綜合交通樞紐建設(shè)中的設(shè)計變更及其管理[A];上?崭郏ǖ10輯)[C];2009年

2 譚曉洪;魏蔚;;淺析業(yè)主方的設(shè)計變更管理[A];上海空港(第11輯)[C];2010年

3 金晶;;淺議設(shè)計變更與工程造價[A];2013年4月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年

4 楊金嶺;;淺談如何加強設(shè)計變更和工程簽證的管理工作[A];河南省土木建筑學(xué)會2008年學(xué)術(shù)交流會論文集[C];2008年

5 黨延芬;王洪武;;設(shè)計變更、現(xiàn)場簽證對控制工程造價的影響[A];土木建筑學(xué)術(shù)文庫(第15卷)[C];2011年

6 張勝強;張柏青;謝安健;;論工程項目質(zhì)量控制要點[A];2010年度海洋工程學(xué)術(shù)會議論文集[C];2010年

7 荊常俊;姜春波;;基于施工階段設(shè)計變更、洽商、現(xiàn)場簽證造價控制探討[A];2013年11月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年

相關(guān)重要報紙文章 前10條

1 記者 胡萍;渡改橋項目不得隨意變更設(shè)計[N];江西日報;2009年

2 黃規(guī);黃委加強基本建設(shè)投資計劃管理和設(shè)計變更管理[N];黃河報;2013年

3 通訊員 李松柏;東中線一期工程設(shè)計變更管理研究報告通過評審[N];中國水利報;2008年

4 陳朝權(quán);給違法設(shè)計變更“添堵”[N];中國建設(shè)報;2014年

5 本報記者 柏松;完成設(shè)計變更僅需一天[N];中國紡織報;2005年

6 本報記者 王曦;大數(shù)據(jù)時代,BIM設(shè)計的“八面玲瓏”[N];中華建筑報;2014年

7 黃河;設(shè)計要精 投資更省[N];中國石化報;2001年

8 ;公路工程設(shè)計變更管理辦法[N];中國交通報;2005年

9 錢新;向設(shè)計要質(zhì)量[N];中國質(zhì)量報;2011年

10 通訊員 王曉東 王項坤;烏什援疆指揮部制定投資項目設(shè)計變更管理辦法[N];阿克蘇日報(漢);2011年

相關(guān)博士學(xué)位論文 前1條

1 楊娟;基于云計算的設(shè)計服務(wù)模式研究及原型應(yīng)用[D];重慶大學(xué);2012年

相關(guān)碩士學(xué)位論文 前10條

1 張育鵬;基于C#的兆伏電子企業(yè)信息管理系統(tǒng)的設(shè)計與實現(xiàn)[D];吉林大學(xué);2016年

2 孫迪文;設(shè)計變更對船舶建造材料成本的影響分析[D];江蘇科技大學(xué);2016年

3 余勇;BIM設(shè)計模式在華藍公司中的應(yīng)用探索[D];華南理工大學(xué);2015年

4 池海;JDI化工裝置項目設(shè)計變更風(fēng)險管理案例研究[D];大連理工大學(xué);2015年

5 王繼鋒;軌道交通機電安裝工程的設(shè)計變更研究[D];蘇州科技大學(xué);2017年

6 姚建榮;公路跨越式發(fā)展建設(shè)時期項目控制管理及設(shè)計變更研究[D];長安大學(xué);2010年

7 范光遠;施工總承包方大型商貿(mào)項目設(shè)計變更管理研究[D];哈爾濱工業(yè)大學(xué);2013年

8 張振炎;面向產(chǎn)品結(jié)構(gòu)網(wǎng)絡(luò)的設(shè)計變更研究[D];武漢科技大學(xué);2014年

9 李華;JKS公司設(shè)計人員職業(yè)能力提升策略研究[D];吉林大學(xué);2013年

10 董秋曉;K公司設(shè)計流程研究[D];廈門大學(xué);2007年



本文編號:2207145

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/xiangmuguanli/2207145.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶3a228***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com