基于關鍵鏈技術的地鐵工程A項目進度管理研究
[Abstract]:In the field of subway project management, project schedule management is a very important branch, it is an important measure of subway project management. In the traditional subway project schedule management mode, there are some artificial factors, such as student syndrome, Parkinson's law and so on. This will prolong the estimated duration of the project and lead to delays in the project. The key chain management technology can greatly improve this situation, effectively make up for some problems in the traditional subway project schedule management method, so it is necessary for us to study the key chain technology deeply. This is of great significance to subway project management. This article mainly through the literature analysis and so on many methods launches the discussion. Firstly, this paper reviews the traditional theory and method of project schedule management, and briefly combs the existing problems, and then leads to the key chain technology and its theory. Secondly, the basic theory and thought of the key chain, its basic content and how to use it are expounded, and the differences between the key chain technology and the traditional project schedule management methods and their advantages are compared and analyzed. Thirdly, the paper discusses and analyzes the identification of key chain, the setting and management of buffer zone, and constructs the optimization model of subway project schedule management based on key chain. In this model, the complexity and resource constraint of subway project are comprehensively considered in the setting of import buffer zone, and the principal component analysis method is put forward, which can be used to distribute buffer amount and set up buffer zone after non-critical work. This is beneficial to the progress control of the project, which leads to the effective solution of the critical chain breakage and the great improvement of the input buffer setting, which makes it more scientific. Finally, through the introduction of A subway project case, the paper plans to adopt the traditional project schedule management method and key chain technology to formulate the project schedule management plan, and analyzes and compares the results of the two methods in depth. Through the analysis of examples, it is verified that the proposed method of importing buffer is more stable and feasible, and the key chain schedule management model can fully ensure the schedule management of the whole project. Can greatly reduce the duration of the project. Through the comparison of examples, it is proved that the advantages of the key chain management technology are as follows: (1) on the one hand, the conflict of resources is analyzed, on the other hand, the constraints of tight relationship are also taken into account; (2) the constraints and bottlenecks of resources are identified, which is beneficial to the optimal allocation of resources in the process of the project. In order to reduce the risk of progress caused by resource problems, (3) to ensure the smooth progress of the project, buffer zones are set up. The related research in this paper has further improved the project knowledge management system, which is helpful to the further improvement of the project management level, so it has strong practical significance.
【學位授予單位】:北京工業(yè)大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:U231.3
【相似文獻】
相關期刊論文 前10條
1 韓文民;謝聰利;寧宣熙;;關鍵鏈在資源受限中的應用研究[J];中國制造業(yè)信息化;2007年23期
2 郭慶軍;李慧民;賽云秀;;多項目關鍵鏈進度優(yōu)化算法分析[J];工業(yè)工程與管理;2008年06期
3 李俊亭;王潤孝;楊云濤;;基于資源沖突調度的關鍵鏈項目進度研究[J];西北工業(yè)大學學報;2010年04期
4 鐘穩(wěn);廖良才;;多項目進度瓶頸——關鍵鏈束[J];科學技術與工程;2011年25期
5 趙道致,廖華;對關鍵鏈法的幾個認識誤區(qū)[J];工業(yè)工程;2005年02期
6 姜華;劉建峰;;基于關鍵鏈方法的船舶分段制造計劃系統(tǒng)研究[J];上海造船;2008年03期
7 田文迪;崔南方;;關鍵鏈項目管理中關鍵鏈和非關鍵鏈的識別[J];工業(yè)工程與管理;2009年02期
8 陳友玲;張曉麗;覃承海;;基于關鍵鏈的多項目計劃編制[J];計算機集成制造系統(tǒng);2009年07期
9 程文攻;陳勇;;基于關鍵鏈的施工計劃與排程應用[J];建筑經(jīng)濟;2011年04期
10 郭旭;;關鍵鏈方法的研究與應用[J];硅谷;2011年20期
相關會議論文 前4條
1 蔣國萍;陳英武;;基于關鍵鏈的項目進度問題研究[A];中國運籌學會第七屆學術交流會論文集(中卷)[C];2004年
2 徐陽;;試用關鍵鏈理論組織預測市場需求[A];上海市煙草專賣局2007年度獲獎論文集(經(jīng)濟管理類)[C];2007年
3 周正龍;董雄報;左園;;MIS開發(fā)項目進度管理的關鍵鏈識別研究[A];第八屆(2013)中國管理學年會——管理與決策科學分會場論文集[C];2013年
4 萬偉;蔡晨;;在兩資源約束項目環(huán)境中的關鍵鏈管理[A];2003年中國管理科學學術會議論文集[C];2003年
相關重要報紙文章 前1條
1 路長全;速度領先導致資源匯聚[N];中國證券報;2007年
相關博士學位論文 前7條
1 林晶晶;考慮資源可替代性的關鍵鏈識別與緩沖設置方法研究[D];西南交通大學;2011年
2 郭方銘;基于粒子群優(yōu)化和關鍵鏈的多項目計劃管理問題研究[D];華中科技大學;2010年
3 別黎;關鍵鏈項目管理中緩沖估計與監(jiān)控方法研究[D];華中科技大學;2012年
4 金敏力;基于關鍵鏈的項目優(yōu)化調度問題研究[D];哈爾濱工業(yè)大學;2013年
5 田文迪;隨機DTRTP環(huán)境下項目調度策略的比較研究[D];華中科技大學;2011年
6 劉英杰;大型水利工程費用/進度集成控制研究[D];天津大學;2012年
7 趙雁;時間緩沖設置與魯棒性項目調度[D];華中科技大學;2014年
相關碩士學位論文 前10條
1 唐藝軒;基于關鍵鏈的工程進度與成本集成管理研究[D];山東建筑大學;2015年
2 劉博;基于多項目優(yōu)先級的關鍵鏈識別和緩沖區(qū)設置研究[D];河北工程大學;2015年
3 李力真;空間受限大型復雜項目的關鍵鏈管理研究[D];蘭州大學;2015年
4 殷蕊;基于關鍵鏈技術的多資源多項目進度控制研究與應用[D];沈陽大學;2015年
5 任格葉;關鍵鏈的隨機性及其應用研究[D];西安建筑科技大學;2015年
6 韓家寧;基于關鍵鏈的船舶機艙系泊計劃進度研究[D];上海交通大學;2015年
7 李恩成;基于關鍵鏈技術的工程建筑項目進度管理方法研究[D];華北電力大學;2015年
8 崔爽;基于關鍵鏈技術資源約束下項目調度應用研究[D];華北電力大學;2015年
9 玉樹偉;基于關鍵鏈法的超高層項目施工進度管理研究[D];廣西大學;2015年
10 蒙唐媛怡;基于灰色關鍵鏈的項目進度管理研究[D];北京化工大學;2015年
,本文編號:2160747
本文鏈接:http://www.sikaile.net/guanlilunwen/xiangmuguanli/2160747.html