天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 項(xiàng)目管理論文 >

團(tuán)結(jié)湖220kV輸變電工程質(zhì)量控制與評(píng)價(jià)研究

發(fā)布時(shí)間:2018-04-13 17:34

  本文選題:輸變電工程項(xiàng)目 + 質(zhì)量控制; 參考:《華北電力大學(xué)》2015年碩士論文


【摘要】:在現(xiàn)代社會(huì),質(zhì)量問題已經(jīng)成為越來越重大的戰(zhàn)略問題。電力工程項(xiàng)目是一項(xiàng)量大、面廣的系統(tǒng)工程,其質(zhì)量的優(yōu)劣直接影響到國家經(jīng)濟(jì)建設(shè)的發(fā)展。工程的質(zhì)量與工程的安全、費(fèi)用成本、環(huán)境、工期以及可持續(xù)發(fā)展等優(yōu)化目標(biāo)共同構(gòu)成了項(xiàng)目的綜合目標(biāo),因此,質(zhì)量是決定項(xiàng)目能否順利完成的關(guān)鍵因素之一,這也決定了項(xiàng)目質(zhì)量管理是工程項(xiàng)目管理的重點(diǎn)。尤其對(duì)于輸變電工程,工程質(zhì)量問題將影響項(xiàng)目投產(chǎn)運(yùn)營后的經(jīng)濟(jì)性、可靠性甚至安全性,其中,安全性不僅包括電網(wǎng)重大設(shè)備的運(yùn)行安全,也包括電網(wǎng)運(yùn)行各個(gè)環(huán)節(jié)中操作人員的人身安全問題。由此可見,項(xiàng)目質(zhì)量管理的研究為輸變電工程不僅提供了強(qiáng)有力的理論支持,本身也在該領(lǐng)域的實(shí)踐中具有重要意義。本文首先對(duì)電力工程中的質(zhì)量管理進(jìn)行了細(xì)致的分析和闡述,對(duì)電力過程管理過程中使用的方法和影響質(zhì)量管理的各種因素進(jìn)行了深入的探討,并且以團(tuán)結(jié)湖220kV輸變電工程項(xiàng)目作為實(shí)例,并結(jié)合其工程過程中的質(zhì)量管理流程進(jìn)行研究。在文章最后,本文使用模糊評(píng)價(jià)方法對(duì)團(tuán)結(jié)湖220kV的質(zhì)量管理工程進(jìn)行綜合評(píng)價(jià),選取最具有影響的指標(biāo)因素建立評(píng)價(jià)指標(biāo)體系,通過對(duì)專家意見的整合,對(duì)一級(jí)指標(biāo)和二級(jí)指標(biāo)分別進(jìn)行模糊綜合評(píng)價(jià),并得出工程項(xiàng)目整體的滿意度和各個(gè)指標(biāo)的滿意度,對(duì)質(zhì)量工程管理項(xiàng)目的展開具有極強(qiáng)的評(píng)價(jià)和指導(dǎo)作用。
[Abstract]:In modern society, quality problem has become more and more important strategic problem.Power engineering project is a large quantity and wide range of system engineering, its quality directly affects the development of national economic construction.The quality of the project and the optimization objectives of project safety, cost, environment, duration and sustainable development constitute the comprehensive objectives of the project. Therefore, quality is one of the key factors that determine the successful completion of the project.This also determines that project quality management is the focus of engineering project management.Especially for power transmission and transformation projects, engineering quality problems will affect the economy, reliability and even safety of the project after it is put into operation.It also includes the personal safety of operators in all links of power grid operation.It can be seen that the research of project quality management not only provides strong theoretical support for transmission and transformation engineering, but also has important significance in practice in this field.In this paper, the quality management in electric power engineering is analyzed and elaborated in detail, and the methods used in the process management and the factors influencing the quality management are discussed deeply in this paper.Taking Tuanjiehu 220kV power transmission and transformation project as an example, and combining with the quality management process of the project, the research is carried out.At the end of the paper, the fuzzy evaluation method is used to evaluate the quality management engineering of Tuanjie Lake 220kV, the most influential index factors are selected to establish the evaluation index system, and through the integration of expert opinions,The fuzzy comprehensive evaluation of the first grade index and the second grade index is carried out, and the overall satisfaction degree of the project and the satisfaction degree of each index are obtained, which plays an important role in evaluating and guiding the development of the quality engineering management project.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TM723

【參考文獻(xiàn)】

相關(guān)期刊論文 前1條

1 王建榮;;110kV輸變電工程施工管理過程研究[J];中國高新技術(shù)企業(yè);2012年30期

,

本文編號(hào):1745524

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/xiangmuguanli/1745524.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶7c63c***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com