國際工程承包主要金融交易方式的選擇分析
發(fā)布時間:2019-04-01 12:55
【摘要】:隨著人民幣相對美元等主要貨幣的匯率變動彈性增大,響應(yīng)國家"走出去"政策承包海外工程的我國國際工程承包商正面臨著越來越大的外匯風(fēng)險,迫切需要了解和掌握各種金融交易方式在外匯風(fēng)險管理中的應(yīng)用。本文對現(xiàn)階段我國國際工程承包商防范外匯風(fēng)險可以利用的遠(yuǎn)期外匯交易及其衍生形式、外匯期權(quán)交易、BSI法以及貨幣互換等金融交易方式進行了分析,指出應(yīng)當(dāng)在給定條件下,根據(jù)每一金融交易方式所鎖定的匯率選擇較優(yōu)者管理國際工程承包項目面臨的外匯風(fēng)險。
[Abstract]:As the exchange rate flexibility of RMB against the US dollar and other major currencies increases, China's international project contractors who respond to the country's "going out" policy to contract overseas projects are facing greater and greater foreign exchange risks. It is urgent to understand and master the application of various financial transaction methods in foreign exchange risk management. This paper analyzes the forward foreign exchange trading and its derivative forms, foreign exchange option trading, BSI method and currency swap, which can be used by international engineering contractors to prevent foreign exchange risk at the present stage. It is pointed out that the foreign exchange risk faced by the international project contracting project should be managed under the given conditions, according to the exchange rate locked by each financial transaction mode, and the superior one should be selected to manage the foreign exchange risk.
【作者單位】: 天津大學(xué)管理與經(jīng)濟學(xué)部;深圳招商局國際有限公司;
【分類號】:F416.92;F831.6
本文編號:2451573
[Abstract]:As the exchange rate flexibility of RMB against the US dollar and other major currencies increases, China's international project contractors who respond to the country's "going out" policy to contract overseas projects are facing greater and greater foreign exchange risks. It is urgent to understand and master the application of various financial transaction methods in foreign exchange risk management. This paper analyzes the forward foreign exchange trading and its derivative forms, foreign exchange option trading, BSI method and currency swap, which can be used by international engineering contractors to prevent foreign exchange risk at the present stage. It is pointed out that the foreign exchange risk faced by the international project contracting project should be managed under the given conditions, according to the exchange rate locked by each financial transaction mode, and the superior one should be selected to manage the foreign exchange risk.
【作者單位】: 天津大學(xué)管理與經(jīng)濟學(xué)部;深圳招商局國際有限公司;
【分類號】:F416.92;F831.6
【參考文獻】
相關(guān)期刊論文 前2條
1 王秀芹;;國際工程物資采購?fù)鈪R風(fēng)險管理[J];國際經(jīng)濟合作;2009年05期
2 何昕;;境外人民幣NDF市場[J];中國外匯;2006年06期
【共引文獻】
相關(guān)期刊論文 前1條
1 呂文學(xué);劉學(xué)姣;游慶磊;;國際工程中建筑材料價格的風(fēng)險管理[J];國際經(jīng)濟合作;2009年08期
相關(guān)碩士學(xué)位論文 前4條
1 郭磊;從境內(nèi)遠(yuǎn)期業(yè)務(wù)特征的變化看人民幣匯率形成的市場機制[D];復(fù)旦大學(xué);2008年
2 任立;人民幣匯率風(fēng)險管理及金融工具選擇[D];河海大學(xué);2007年
3 宋侃;人民幣無本金交割遠(yuǎn)期市場的發(fā)展研究[D];南京理工大學(xué);2007年
4 張弘;國際物流企業(yè)的外匯風(fēng)險與控制[D];上海交通大學(xué);2008年
【二級參考文獻】
相關(guān)期刊論文 前2條
1 劉玉杰,何伯森;國際工程承包的調(diào)價工作[J];國際經(jīng)濟合作;2005年11期
2 呂文學(xué);潘婧;徐青揚;;國際工程承包中的價格調(diào)整風(fēng)險分析[J];中國港灣建設(shè);2008年01期
,本文編號:2451573
本文鏈接:http://www.sikaile.net/guanlilunwen/huobilw/2451573.html
最近更新
教材專著