工程爭端影響因素及爭端預(yù)防研究
[Abstract]:In the course of construction of engineering projects, engineering disputes are basically inevitable. Because of different positions of people, there are great differences in cognition of engineering disputes, so it is easy to rise to engineering disputes or engineering litigation. After a project dispute occurs, the project participants usually need to spend a lot of costs in order to deal with the project dispute, and the project participants may not be able to agree with the outcome of the project dispute decision. Affected the smooth implementation of the project and the interests of both sides. A large number of cases and literature have shown that certain factors play a very important role in the initiation of engineering disputes, by establishing a prediction model for engineering disputes, predicting whether a project will occur disputes, and aiming at projects where disputes may arise, By analyzing the main factors leading to the occurrence of engineering disputes and taking reasonable and effective management and control measures, the probability and loss of the occurrence of engineering disputes can be reduced to a certain extent. This paper collects and collates the cases of engineering disputes, through the management and organization of the owners and contractors, the value of the relationship between the two sides, the scale and complexity of the project, the capital plan, and the management and organization of the owners and contractors. Contract and risk management as well as the definition of project scope are analyzed and summarized into three kinds of factors: process, personnel and project. A questionnaire is designed for the factors that can lead to engineering disputes. The questionnaire is collected and sorted out in the form of network and on-the-spot distribution, and nine factors are extracted from the data by factor analysis. Based on this, a project dispute prediction model is established and verified by an example. The model is proved to be reliable. A model of the potential index of engineering disputes can help project managers recognize the underlying factors that give rise to engineering disputes in the initial phase of the project and the subsequent performance of the contract, from the perspective of fairness and fairness of the contract, Find out the deep causes of the dispute, and guide the two parties to improve the agreement and establish a more harmonious relationship, create a good project implementation environment, and achieve a win-win situation.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉銳;呂文學(xué);嚴(yán)謙;;基于共享心智模型的工程項(xiàng)目知識管理[J];工程管理學(xué)報(bào);2014年02期
2 柯洪;呂廷竹;杜亞靈;;基于SEM的工程合同不完備性測度研究[J];北京理工大學(xué)學(xué)報(bào)(社會科學(xué)版);2014年02期
3 壽涌毅;車文;彭曉峰;;基于內(nèi)容分析法的大型項(xiàng)目特征研究[J];項(xiàng)目管理技術(shù);2013年06期
4 何清華;羅嵐;陸云波;任俊山;;基于TO視角的項(xiàng)目復(fù)雜性測度研究[J];管理工程學(xué)報(bào);2013年01期
5 唐海榮;尹貽林;侯春梅;朱成愛;;工程量清單項(xiàng)目特征描述不準(zhǔn)確導(dǎo)致結(jié)算糾紛的預(yù)控措施研究[J];工程管理學(xué)報(bào);2012年05期
6 吳光東;施建剛;唐代中;;工程項(xiàng)目團(tuán)隊(duì)動(dòng)態(tài)特征、沖突維度與項(xiàng)目成功關(guān)系實(shí)證[J];管理工程學(xué)報(bào);2012年04期
7 滕延京;宮劍飛;李建民;;基礎(chǔ)工程技術(shù)發(fā)展綜述[J];土木工程學(xué)報(bào);2012年05期
8 韓姣杰;周國華;李延來;蔡屹;;基于互惠偏好的多主體參與項(xiàng)目團(tuán)隊(duì)合作行為[J];系統(tǒng)管理學(xué)報(bào);2012年01期
9 應(yīng)志剛;;建筑企業(yè)項(xiàng)目管理創(chuàng)新研究與實(shí)踐[J];工程管理學(xué)報(bào);2011年04期
10 王雪青;宋研;;基于代建機(jī)制的大型項(xiàng)目組織機(jī)構(gòu)設(shè)計(jì)研究[J];項(xiàng)目管理技術(shù);2011年07期
,本文編號:2463922
本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/2463922.html