天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 城建管理論文 >

利用TEKLA建模提高臨沂億晨項目鋼結(jié)構(gòu)安裝精度和速度

發(fā)布時間:2019-02-11 11:28
【摘要】:鋼結(jié)構(gòu)工程的蓬勃發(fā)展使得鋼結(jié)構(gòu)在越來越多的大型工業(yè)建筑中得到應(yīng)用,鋼結(jié)構(gòu)建筑優(yōu)勢顯現(xiàn)出來,高層、超高層建筑以及鋼結(jié)構(gòu)住宅都呈上升趨勢。上海金茂大廈,北京國家體育館鳥巢都是鋼結(jié)構(gòu)建筑的杰出代表。 TEKLA是鋼結(jié)構(gòu)設(shè)計深化軟件,其優(yōu)秀的設(shè)計理念和不斷拓展的強(qiáng)大功能使得設(shè)計師從繁雜的工作中解脫出來,可以高效的開展工作,TEKLA能與BIM對接,能使用計算機(jī)軟件模型模擬整個工程設(shè)施的建設(shè)和運(yùn)營,體現(xiàn)即將開工的建設(shè)信息,呈現(xiàn)更好的心信息管理,提高建筑工業(yè)的生產(chǎn)力。TEKLA以3D模型為基礎(chǔ)的獨特軟件系統(tǒng)結(jié)構(gòu),讓使用者可以建立包括設(shè)計、制造和安裝所需的全部資料,模擬真實結(jié)構(gòu)的智慧型3D模型,隨時可以輸出2D的圖紙及報表。緊密結(jié)合輸出,確保建立的高效率與準(zhǔn)確性。通過內(nèi)建的功能,讓設(shè)計的模型每次修改后都會自動調(diào)整,任何修改和變更都會自動更新都相關(guān)工程圖紙中。 億晨鎳鉻合金4X36000KVA鎳鐵電爐工程就是一個全鋼結(jié)構(gòu)的多層重鋼建筑,整個項目有回轉(zhuǎn)窯、干燥窯、1#、2#廠房等幾個單體組成,,回轉(zhuǎn)窯、干燥窯包括20個混凝土剪力墻大支墩及4條管桁架通廊。主廠房框架平面尺寸為42*78m,構(gòu)件類型包括箱型柱、格構(gòu)柱、H型鋼柱、H型鋼梁、蜂窩梁等,鋼結(jié)構(gòu)工程結(jié)構(gòu)復(fù)雜,鋼構(gòu)件截面大,節(jié)點繁多,采用傳統(tǒng)CAD作圖很難準(zhǔn)確全面的將構(gòu)件圖紙拆分,不利于構(gòu)件加工及安裝。TEKLA創(chuàng)建3D模型,能直觀表示出構(gòu)件位置及各節(jié)點是否存在碰撞沖突,能準(zhǔn)確的將每個構(gòu)件及零件圖紙深化,指導(dǎo)現(xiàn)場構(gòu)件安裝,TEKLA能與BIM對接,將鋼結(jié)構(gòu)與土建,水電,消防等系統(tǒng)在模型中全部顯示出來,能準(zhǔn)確的指導(dǎo)現(xiàn)場施工順序,提高施工進(jìn)度。 通過TEKLA詳圖深化設(shè)計的應(yīng)用、加工的應(yīng)用以及安裝中的應(yīng)用分析提高臨沂億晨項目的鋼結(jié)構(gòu)安裝精度和速度。
[Abstract]:With the vigorous development of steel structure engineering, steel structure has been applied in more and more large industrial buildings. Shanghai Jinmao Tower, Beijing National Stadium Bird's Nest are outstanding representatives of steel architecture. TEKLA is the deepening software of steel structure design. With its excellent design concept and expanding powerful function, the designer can get rid of the complicated work, and can carry out the work efficiently. TEKLA can connect with BIM. The computer software model can be used to simulate the construction and operation of the whole project facilities, to reflect the construction information about to start, to present better information management of the heart and to improve the productivity of the construction industry.The unique software system structure of TEKLA is based on 3D model. Allows the user to create all the information needed to design, manufacture and install, simulate the real structure of the intelligent 3D model, can output 2D drawings and reports at any time. Combine output closely to ensure high efficiency and accuracy. Through the built-in function, the design model is automatically adjusted after each modification, and any modifications and changes are automatically updated in the relevant engineering drawings. The Yichen Ni-Cr alloy 4X36000KVA Ni-Fe electric furnace project is a multi-story heavy steel building with a steel structure. The whole project consists of several monomers, such as rotary kiln, drying kiln, 1 #2# factory building, and rotary kiln. The kiln consists of 20 large supported concrete shear wall piers and 4 pipe truss corridors. The plane size of the frame of the main factory building is 42278m.The member types include box column, lattice column, H-shaped steel column, H-type steel beam, honeycomb beam and so on. The structure of steel structure is complex, the section of steel member is large, and the joints are various. It is difficult to separate component drawing accurately and comprehensively by using traditional CAD drawing, which is not good for component processing and installation. TEKLA creates 3D model, which can directly express the position of component and whether there is collision conflict between nodes. Can accurately deepen the drawing of each component and parts, guide the installation of on-site components, TEKLA can connect with the BIM, the steel structure and civil engineering, hydropower, fire control systems are all displayed in the model, can accurately guide the site construction sequence, Improve the progress of construction. Through the application of the TEKLA detailed drawing, the application of the design, the application of the machining and the application analysis of the installation, the installation accuracy and speed of the steel structure of Linyi Yichen Project are improved.
【學(xué)位授予單位】:青島理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU758.11

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 賈震江;劉宇穗;;協(xié)同、三維設(shè)計技術(shù)在數(shù)字化電廠建設(shè)中的應(yīng)用[J];電力建設(shè);2011年04期

2 荊玉煥;信息管理系統(tǒng)開發(fā)中的進(jìn)度控制[J];火力與指揮控制;2005年04期

3 喻新義;顏功興;楊家云;;建筑施工企業(yè)施工階段項目成本控制的對策研究[J];經(jīng)濟(jì)研究導(dǎo)刊;2011年12期

4 張春霞;;BIM技術(shù)在我國建筑行業(yè)的應(yīng)用現(xiàn)狀及發(fā)展障礙研究[J];建筑經(jīng)濟(jì);2011年09期

5 韓行祥;呂磊;;淺談工程項目的進(jìn)度管理[J];科技信息(學(xué)術(shù)研究);2007年24期

6 胡長明,於東,梁森,陳冬虎;大型冶金建設(shè)項目進(jìn)度控制及其應(yīng)用[J];施工技術(shù);2005年02期

7 高劍;曹潔華;賀明玄;;Tekla Structures的二次開發(fā)在工程中的應(yīng)用[J];施工技術(shù);2008年05期

8 陳振明;張耀林;黃冬平;;Tekla Structure軟件在CCTV主樓鋼結(jié)構(gòu)深化設(shè)計中的應(yīng)用[J];施工技術(shù);2008年08期

9 何清華;張靜;;建筑施工企業(yè)BIM應(yīng)用障礙研究[J];施工技術(shù);2012年22期

10 馬智亮;馬健坤;;IPD與BIM技術(shù)在其中的應(yīng)用[J];土木建筑工程信息技術(shù);2011年04期



本文編號:2419691

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/2419691.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶560bb***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com