中科納能研發(fā)中心建設(shè)項(xiàng)目進(jìn)度管理研究
[Abstract]:In the middle of the 20th century, the advanced western countries first put forward the theory of project management, and gradually introduced the network technology. In the process of development for 30 years, project management has been widely used in the construction industry around the world. Especially after entering the 21st century, researchers in the world have put the research emphasis on project management. And take this as the core content of the future project construction. In order to maximize the benefits of the project, it is necessary not only to ensure that it has a good reputation, but also to take into account the investment of the project, the construction cycle and the good quality of the construction. So it is necessary to sum up the construction progress of the project into project management as the key content. Up to now, the management system of many project construction organizations is not very perfect, the technical ability is not advanced enough to meet the current social demand for construction, and the construction cycle is longer, and the project can not be completed in accordance with the established time; Not only is the capital invested relatively large, but also does not build enough competitive advantage. Therefore, for a long time in the future, the construction schedule of the project should be studied as the key content of the management. In this paper, the construction process of the construction project of the middle Konaneng R & D center is taken as a practical research case to further analyze and study the progress management of this project, and to understand the management of the current construction project in China. According to the actual social needs and existing technical capabilities, the project schedule management is put forward on the basis of the original. In view of the main progress management defects existing in the construction project of the middle Konaneng R & D center, this paper puts forward several feasible opinions and suggestions on the supervision and management of the project, so that the progress of the project can be effectively managed. Optimizing the frame and structure of engineering management will provide some theoretical basis for the research of construction schedule management in the future.
【學(xué)位授予單位】:中國(guó)海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU722
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 梁禮方;;項(xiàng)目進(jìn)度管理(下)[J];金融科技時(shí)代;2013年10期
2 劉耕,王學(xué)軍;國(guó)內(nèi)外項(xiàng)目進(jìn)度管理的比較及建議[J];重慶交通學(xué)院學(xué)報(bào);2003年S1期
3 章勇武,尤建新,黃力 ,馬國(guó)豐;高速公路項(xiàng)目進(jìn)度管理信息系統(tǒng)設(shè)計(jì)研究[J];上海管理科學(xué);2005年05期
4 田豐春;;項(xiàng)目進(jìn)度管理研究[J];中國(guó)科技信息;2008年14期
5 聶淑萍;高建民;;項(xiàng)目進(jìn)度管理在國(guó)防科研項(xiàng)目管理中的應(yīng)用探析[J];國(guó)防技術(shù)基礎(chǔ);2008年07期
6 劉曉東;;基于知識(shí)管理的工程項(xiàng)目進(jìn)度管理持續(xù)改進(jìn)研究[J];建筑經(jīng)濟(jì);2009年05期
7 林進(jìn)峰;;工程項(xiàng)目進(jìn)度管理[J];廣東建材;2009年11期
8 楊紅霞;;項(xiàng)目進(jìn)度管理方法研究[J];山西建筑;2010年29期
9 杜建峰;江文杰;;項(xiàng)目進(jìn)度管理在公路施工建設(shè)中的意義及應(yīng)用[J];中國(guó)新技術(shù)新產(chǎn)品;2010年21期
10 楊振鵬;;工程項(xiàng)目進(jìn)度管理相關(guān)問(wèn)題探討[J];東北水利水電;2011年12期
相關(guān)會(huì)議論文 前3條
1 楊正茂;;維生素C質(zhì)量升級(jí)項(xiàng)目進(jìn)度管理研究[A];第十屆沈陽(yáng)科學(xué)學(xué)術(shù)年會(huì)論文集(農(nóng)業(yè)科學(xué)與醫(yī)藥科學(xué)分冊(cè))[C];2013年
2 高華北;張花玲;周湘暉;黃曦;丁霞;王麗;鄢旭輝;嚴(yán)國(guó)興;;甘特圖在職業(yè)病危害評(píng)價(jià)項(xiàng)目進(jìn)度管理中的應(yīng)用[A];湖南省預(yù)防醫(yī)學(xué)會(huì)勞動(dòng)衛(wèi)生專業(yè)委員會(huì)2008年學(xué)術(shù)交流會(huì)議論文集[C];2008年
3 孫慧;王麗華;;多層次模糊控制在工程項(xiàng)目進(jìn)度管理中的應(yīng)用[A];2005年中國(guó)機(jī)械工程學(xué)會(huì)年會(huì)論文集[C];2005年
相關(guān)重要報(bào)紙文章 前7條
1 彭潔;昆明辦審計(jì)項(xiàng)目進(jìn)度管理實(shí)現(xiàn)規(guī)范化[N];中國(guó)審計(jì)報(bào);2013年
2 ;遼寧審計(jì)廳出臺(tái)審計(jì)項(xiàng)目進(jìn)度管理辦法[N];財(cái)會(huì)信報(bào);2010年
3 曹忻;云南省審計(jì)廳實(shí)行項(xiàng)目進(jìn)度管理[N];中國(guó)審計(jì)報(bào);2010年
4 項(xiàng)榮;深圳辦加強(qiáng)審計(jì)項(xiàng)目進(jìn)度管理[N];中國(guó)審計(jì)報(bào);2012年
5 小城;遼寧出臺(tái)審計(jì)項(xiàng)目進(jìn)度管理辦法[N];中國(guó)稅務(wù)報(bào);2010年
6 記者 李穎;增強(qiáng)藏區(qū)自我造血能力 助推藏區(qū)跨越發(fā)展[N];成都日?qǐng)?bào);2014年
7 通訊員 劉永良;雙永高速永定段完成投資15億元[N];閩西日?qǐng)?bào);2010年
相關(guān)博士學(xué)位論文 前2條
1 魏從剛;網(wǎng)絡(luò)化協(xié)同制造項(xiàng)目進(jìn)度管理技術(shù)研究[D];西北工業(yè)大學(xué);2006年
2 張敏;項(xiàng)目進(jìn)度管理的行為不確定性及其控制策略研究[D];華中科技大學(xué);2011年
相關(guān)碩士學(xué)位論文 前10條
1 秦國(guó)祥;HP公司軟件項(xiàng)目進(jìn)度管理研究[D];華東理工大學(xué);2015年
2 樊艷冬;DB總承包模式公路建設(shè)項(xiàng)目進(jìn)度管理研究[D];長(zhǎng)安大學(xué);2015年
3 毛紅峰;法雷奧后霧燈開(kāi)發(fā)項(xiàng)目進(jìn)度管理研究[D];蘭州大學(xué);2015年
4 李婷婷;A公司服務(wù)器新產(chǎn)品開(kāi)發(fā)項(xiàng)目進(jìn)度管理研究[D];蘇州大學(xué);2015年
5 周鵬超;基于4D-BIM技術(shù)的工程項(xiàng)目進(jìn)度管理研究[D];江西理工大學(xué);2015年
6 溫洪彬;移動(dòng)通信工程項(xiàng)目進(jìn)度管理的優(yōu)化研究[D];北京建筑大學(xué);2014年
7 衛(wèi)紅霞;雙河110kV智能變電站項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2015年
8 孫卓;110kV陽(yáng)城變電站改造項(xiàng)目進(jìn)度管理研究[D];華北電力大學(xué);2015年
9 孫潤(rùn)潤(rùn);基于BIM的城市軌道交通項(xiàng)目進(jìn)度管理研究[D];中國(guó)礦業(yè)大學(xué);2015年
10 張國(guó)勝;表面廢水處理工程項(xiàng)目進(jìn)度管理研究[D];中國(guó)科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院);2015年
,本文編號(hào):2385436
本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/2385436.html