【摘要】:一個(gè)工程項(xiàng)目的建成需要多年時(shí)間,建成周期長給工程建設(shè)項(xiàng)目帶來的很多的不穩(wěn)定性就會(huì)產(chǎn)生風(fēng)險(xiǎn)。因此,工程項(xiàng)目的建設(shè)需進(jìn)行風(fēng)險(xiǎn)管理研究。而HH海洋食品研發(fā)中心程項(xiàng)目又有自身所獨(dú)有的特征,此類項(xiàng)目風(fēng)險(xiǎn)管理研究較少。通過將風(fēng)險(xiǎn)管理內(nèi)容與HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目緊密結(jié)合起來,在實(shí)際項(xiàng)目中實(shí)踐項(xiàng)目風(fēng)險(xiǎn)管理的具體運(yùn)用,并對(duì)HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目進(jìn)行全面的風(fēng)險(xiǎn)管理分析和風(fēng)險(xiǎn)應(yīng)對(duì)。通過闡述HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目的主要背景及項(xiàng)目實(shí)施意義,并總結(jié)當(dāng)前國內(nèi)外項(xiàng)目風(fēng)險(xiǎn)管理的主要進(jìn)展,對(duì)項(xiàng)目風(fēng)險(xiǎn)管理主要理論定義及風(fēng)險(xiǎn)管理步驟進(jìn)行詳細(xì)介紹,為后續(xù)進(jìn)行項(xiàng)目風(fēng)險(xiǎn)管理研究奠定了理論基礎(chǔ)。通過對(duì)HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目的各項(xiàng)內(nèi)容進(jìn)行介紹,對(duì)HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目的風(fēng)險(xiǎn)項(xiàng)目進(jìn)行識(shí)別,在綜合一般的工程項(xiàng)目建設(shè)風(fēng)險(xiǎn)基礎(chǔ)上,分析項(xiàng)目的獨(dú)有特征,得到四組風(fēng)險(xiǎn)內(nèi)容,主要包括決策階段風(fēng)險(xiǎn)、前期工作階段風(fēng)險(xiǎn)、建設(shè)階段風(fēng)險(xiǎn)、項(xiàng)目管理風(fēng)險(xiǎn)等。通過對(duì)各項(xiàng)風(fēng)險(xiǎn)事項(xiàng)進(jìn)行詳細(xì)定義解釋后,主要利用層次分析法(AHP)針對(duì)HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目建立項(xiàng)目風(fēng)險(xiǎn)指標(biāo)體系,對(duì)各項(xiàng)風(fēng)險(xiǎn)項(xiàng)目進(jìn)行權(quán)重計(jì)算,確定HH海洋食品研發(fā)中心工程建設(shè)項(xiàng)目的主要風(fēng)險(xiǎn),發(fā)現(xiàn):項(xiàng)目管理風(fēng)險(xiǎn)和項(xiàng)目建設(shè)階段風(fēng)。險(xiǎn)最大,項(xiàng)目投資決策階段風(fēng)險(xiǎn)和項(xiàng)目前期階段風(fēng)險(xiǎn)較小。在所有風(fēng)險(xiǎn)二級(jí)指標(biāo)中項(xiàng)目組織風(fēng)險(xiǎn)、工期風(fēng)險(xiǎn)、項(xiàng)目人才管理風(fēng)險(xiǎn)、質(zhì)量風(fēng)險(xiǎn)等二級(jí)風(fēng)險(xiǎn)指標(biāo)的組合權(quán)重超過平均水平,這些風(fēng)險(xiǎn)主要隸屬于項(xiàng)目管理風(fēng)險(xiǎn)、項(xiàng)目建設(shè)階段風(fēng)險(xiǎn)這兩種一級(jí)指標(biāo)。因此需要對(duì)這兩種一級(jí)風(fēng)險(xiǎn)指標(biāo)進(jìn)行重點(diǎn)關(guān)注。在得到各項(xiàng)風(fēng)險(xiǎn)權(quán)重基礎(chǔ)上,針對(duì)提出項(xiàng)目管理風(fēng)險(xiǎn)、項(xiàng)目建設(shè)階段風(fēng)險(xiǎn)等主要風(fēng)險(xiǎn)事項(xiàng)提出應(yīng)對(duì)措施,降低主要風(fēng)險(xiǎn)帶來的不利影響,保障HH海洋食品研發(fā)中心工程順利進(jìn)行,希望通過項(xiàng)目風(fēng)險(xiǎn)管理建設(shè)實(shí)現(xiàn)HH海洋食品研發(fā)中心工程的目標(biāo),降低項(xiàng)目建設(shè)過程中風(fēng)險(xiǎn)事項(xiàng)造成的不利影響,使項(xiàng)目順利實(shí)現(xiàn)其經(jīng)濟(jì)及社會(huì)效益。
[Abstract]:It takes many years for a project to be completed. Therefore, the project construction needs to carry on the risk management research. HH marine food R & D center program has its own unique characteristics, such project risk management research is less. By combining the risk management content with the HH marine food R & D center construction project, the concrete application of project risk management is put into practice in the actual project. And carries on the comprehensive risk management analysis and the risk response to the HH marine food research and development center project construction project. This paper expounds the main background and significance of the project construction of HH marine food R & D center, and summarizes the main progress of project risk management at home and abroad. The main theoretical definition and risk management steps of project risk management are introduced in detail, which lays a theoretical foundation for the subsequent research on project risk management. By introducing the contents of the HH marine food R & D center project, the risk items of the HH marine food R & D center project are identified, based on the synthesis of the general engineering project construction risks. By analyzing the unique characteristics of the project, four groups of risk contents are obtained, including decision stage risk, pre-work stage risk, construction stage risk, project management risk and so on. After the detailed definition and explanation of various risk items, the paper mainly uses Analytic hierarchy process (AHP) (AHP) to establish the project risk index system for the HH marine food R & D center construction project, and calculates the weight of each risk item. Determine the main risks of HH marine food R & D center project, find: project management risk and project construction phase wind. The risk is maximum, the risk of project investment decision stage and the early stage of project is small. Among all the secondary risk indicators, the combined weights of the two risk indicators, such as project organization risk, duration risk, project talent management risk, quality risk and so on, exceed the average level, and these risks mainly belong to the project management risk. Project construction stage risk these two kinds of first-level index. Therefore, we need to focus on these two primary risk indicators. On the basis of getting all kinds of risk weights, some countermeasures are put forward to reduce the adverse effects of the main risks, such as project management risk, project construction stage risk and so on. To ensure the smooth progress of HH marine food R & D center project, hope to realize the goal of HH marine food R & D center project through the project risk management construction, and reduce the adverse impact caused by the risk items in the process of the project construction. Make the project realize its economic and social benefits smoothly.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU71

【相似文獻(xiàn)】

相關(guān)期刊論文 前5條

1 ;HH復(fù)合堿式氯化鋁新工藝[J];企業(yè)技術(shù)開發(fā);2002年02期

2 邢錫倫;新型哈克尼斯(HH)銀幕亮度檢測(cè)表簡介[J];影視技術(shù);2005年01期

3 鄭洪剛;;HH繼電器耐壓檢測(cè)專機(jī)的設(shè)計(jì)應(yīng)用[J];機(jī)械工程師;2013年05期

4 張冠湘;周興;蔡文學(xué);鐘慧玲;許靖;;基于改進(jìn)HH算法的路徑規(guī)劃系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[J];西南交通大學(xué)學(xué)報(bào);2013年05期

5 ;[J];;年期

相關(guān)會(huì)議論文 前1條

1 畢旭東;崔乃強(qiáng);趙晶;趙連根;;HHⅠ-Ⅰ(活血化瘀注射液Ⅰ號(hào))對(duì)大鼠腎臟低溫保存時(shí)超微結(jié)構(gòu)及移植腎功能的影響[A];第七屆全國中西醫(yī)結(jié)合普通外科臨床及基礎(chǔ)研究學(xué)術(shù)會(huì)議論文匯編[C];2001年

相關(guān)碩士學(xué)位論文 前8條

1 解凌燕;HH海洋食品研發(fā)中心工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];中國海洋大學(xué);2014年

2 張正;品牌戰(zhàn)略與HH品牌推廣項(xiàng)目管理分析[D];西南財(cái)經(jīng)大學(xué);2013年

3 劉英;HH電信公司勞務(wù)派遣用工研究[D];內(nèi)蒙古大學(xué);2012年

4 張友雄;重慶HH小額貸款公司發(fā)展探析[D];西南財(cái)經(jīng)大學(xué);2013年

5 沈宗壽;HH煙草企業(yè)集團(tuán)內(nèi)部審計(jì)發(fā)展對(duì)策探究[D];西南財(cái)經(jīng)大學(xué);2009年

6 陸憶嵐;HH公司項(xiàng)目申報(bào)服務(wù)的競爭力研究[D];云南大學(xué);2013年

7 趙海;HH鐵路工程總公司的經(jīng)營管理[D];哈爾濱工程大學(xué);2003年

8 司文杰;HH模型的ISI及針刺電信號(hào)分析[D];天津大學(xué);2007年

,

本文編號(hào):2308844

資料下載
論文發(fā)表

本文鏈接:http://www.sikaile.net/guanlilunwen/chengjian/2308844.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶67219***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com